1
A passage plan, or voyage plan,
2
is a detailed, systematic, and comprehensive plan prepared to ensure the safe navigation of a vessel from birth to birth.
3
It covers every stage of the voyage, from departure, through coastal and ocean passages, up to the final approach and berthing at the destination port.
4
Its purpose is essential to promote safety of navigation, compliance with regulations, and efficient voyage management.
5
The responsible officer in charge of making the passage plan is the master, but on most merchant vessels,
6
the preparation is normally delegated to the second officer.
7
The master must review and improve the plan before departure.
8
Today's video covers the four stages of passage planning.
9
Appraisal, Planning, Execution and Monitoring.
10
The appraisal stage is the foundation of the entire passage plan.
11
At this stage, the navigator collects, reviews and evaluates all relevant information needed for the intended voyage.
12
identifying navigational hazards and other factors that may affect the ship's safety.
13
We can refer to the Bridge Team Management Manual or to the passage planning guidelines provided on board for detailed procedures.
14
However, it is important to check the company's SMS for any specific instructions
15
or additional guidelines regarding the preparation of a passage plan.
16
If we take a look at the Bridge Team Management Manual Table of Contents,
17
we can see that Chapter 2 lists the sources of information used in the appraisal stage, which can be found on page 9.
18
It is stated that such appraisal should be made by considering information from a variety of sources, including, but not limited to, the following.
19
Not all of these sources will be necessary for every passage or voyage,
20
but this list serves as a comprehensive checklist to ensure that all essential information is considered before planning the route.
21
Let's have a brief discussion on the following sources of information listed, starting from the chart catalog.
22
This publication lists all available navigational charts and their limits, scales, and additions.
23
It helps the navigator select the correct charts for the entire voyage.
24
Second is the navigational charts.
25
These are the primary tools for planning and conducting navigation.
26
They show coastlines, depths, dangers, aids to navigation, and other essential details.
27
Third, ocean passages for the world.
28
A publication provided recommended ocean routes, distances, and seasonal weather patterns for long ocean passages.
29
Fourth is the routing charts or pilot charts.
30
These show average meteorological and oceanographic conditions such as prevailing winds, currents, and storm tracks for each month of the year.
31
Fifth is sailing directions and pilot books.
32
This publication offers detailed information on coasts, ports, anchorages, pilotage procedures, and local regulations.
33
Sixth is Light Lists.
34
This publication lists all lighthouses, lightships, and major buoys, including their characteristics, ranges, and positions.
35
Seventh, Tide Tables.
36
These provide predicted times and heights of high and low tides at standard and secondary ports.
37
Eight, Tidal Stream Atlases.
38
This shows the direction and rate of tidal streams at hourly intervals over a given area.
39
Ninth, notices to mariners.
40
Weekly or periodic updates issued by hydrographic offices to correct charts and publications to the latest information.
41
Tenth, routing information.
42
Contains details about traffic separation schemes, deep water routes and other mandatory or recommended routing systems.
43
Next, radio signal information, including VTS and pilot services.
44
Lists maritime radio services, such as vessels traffic services stations, pilot boarding frequencies, weather podcasts, and distress communication details.
45
Next, climatic information.
46
Provides long -term data on wind visibility, fog, temperature, and sea conditions to support safe route planning.
47
Next, load line chart indicates zones and seasonal areas affecting the vessel's permitted graft and load line marks.
48
Next, distance tables.
49
Provide distances between major ports and waypoints, useful for voyage estimation and fuel planning.
50
Next, electronic navigational systems information.
51
Includes data on GPS, ECDIS, AIS, and other electronic systems used for position fixing and route monitoring.
52
Next, radio and local navigational warnings.
53
Broadcasts issued to warn mariners of temporary hazards such as drifting objects, military exercises or navigation light failures.
54
Next, draught of vessel.
55
The ship's draft affects route selection, under keel clearance and title considerations along the passage.
56
Next, Navigational Terms ensures consistency and understanding of symbols,
57
abbreviations, and terminology used in charts and publications.
58
Owners and Other Unpublished Sources These are supplementary information from the vessel's owner, charterers, agents, and port authority.
59
Personal Experience It's about the navigator's own knowledge or prior experience in the area, which adds valuable practical insight.
60
The Mariner's Handbook, a reference manual containing general information about navigation, chart usage, tides, currents, and meteorology.
61
Guide to Port Entry, provides detailed port information including pilot boarding positions, depths, berthing facilities, and local regulations.
62
Nautical Almanac, necessary for determining times of sunset and sunrise, and and assists in position fixing when electronic system fails.
63
Additional information not listed in the Bridge Team Management Manual includes the Emission Control Area and High Risk Area.
64
Emission Control Areas are specific sea regions established by the IMO
65
where stricter environmental regulations are applied to minimize air pollution from ships.
66
Within these zones, vessels are required to use low -sulfur fuel or other clean energy alternatives to reduce harmful emissions,
67
such as sulfur oxides, nitrogen oxides, and particulate matter.
68
High -risk areas, on the other hand, are sea regions identified as having a high threat of piracy or armed robbery against ships.
69
These areas are designated by international maritime bodies, such as the IMO and BIMCO,
70
and are often located around regions like the Gulf of Aden, the Arabian Sea, and parts of the West African coast.
71
It may seem that these sources of information are quite extensive,
72
but remember that most vessels today are equipped with digital nautical publications and electronic navigational charts.
73
These tools make it much easier for mariners to access and compile the necessary information efficiently.
74
I'll be creating a separate video in the future
75
that will explain in detail how to gather
76
and organize the sources of information based on the voyage instructions provided by the Trotterer.
77
Now, if all the necessary information has been collected and appraised, the next step is the planning stage,
78
where the actual voyage plan begins to take shape.
79
In this stage, the navigator uses the gathered data to lay down the ship's intended track on the chart, ensuring that the route is safe,
80
efficient, and compliant with all navigational requirements and company procedures.
81
Once all navigational charts are gathered and arranged in the correct order, they must be carefully examined,
82
and no -go areas should be highlighted or cross -hatched.
83
Before marking the tracks, margins of safety must be determined to establish safe water.
84
Ocean
85
and open water tracks can be drawn first on a small -scale chart according to the decisions made during the appraisal stage.
86
Any chart change should be clearly indicated showing the number of the next chart to be used.
87
When navigating close to danger, track consideration must be applied,
88
ensuring that minimum safety rules are followed to keep the vessel within safe water
89
and that a proper distance off danger is maintained.
90
Regulations concerning offshore distances must also be observed.
91
If there is any deviation from tracks, the ship must still remain within safe waters.
92
Under Kiel Clearance should be taken into account when operating in areas of limited depth.
93
The title window must be checked to confirm that the required UKC is attainable.
94
If not, the area should be marked as a no -go area.
95
and tidal streams should also be considered.
96
Several other factors must be included when laying tracks and appropriately marked on the charts.
97
These include course alteration and wheel over point, parallel indexing, wait points, abort point and point of no return,
98
contingency anchorage, position fixing, primary and secondary precision fixing,
99
fixed frequency, radar conspicuous objects and visual navigational aids,
100
landfall lights, radar targets, buoys, reporting points, anchor clearance, pilot boarding area,
101
traffic areas, transit or ranges, leading lines, clearing marks, head mark,
102
clearing bearings, range of lights, and parallel indexing among others.
103
To explain this in greater detail, I will be creating a separate video in the future
104
that focuses solely on the planning stage based on the voyage instructions provided by the charter.
105
Once the planning stage has been completed, with all charts prepared, tracks laid, and safety margins clearly defined,
106
the next step is the execution stage.
107
Execution stage begins once the plan has been fully prepared, checked, and approved.
108
This stage involves putting a plan into action,
109
ensuring that every element of the voyage is carried out safely and efficiently according to the established procedures.
110
During execution, the bridge team must implement the tactics and timings decided in the planning stage,
111
such as the expected times of arrival for tides and daylight,
112
tidal stream information, traffic conditions, and destination ETA.
113
The plan may be adjusted as needed to reflect real -time conditions like weather, current, or traffic.
114
Any modification should still ensure that the ship remains within safe water and complies with company and international regulations.
115
Before departure, A bridge team briefing must be conducted.
116
This is an essential step to ensure that every team member understands the passage plan and their individual responsibilities.
117
Now, monitoring stage is the final and continuous phase of passage planning.
118
Monitoring involves ensuring that the ship is following the predetermined passage plan and remains within safe waters at all times.
119
It is the primary responsibility of the officer of the watch to verify that the ship's progress aligns with the planned route,
120
making timely adjustments whenever necessary to maintain safety and efficiency.
121
Effective monitoring consists of performing a series of navigational checks, analyzing the results, and taking appropriate action based on that analysis.
122
This includes the use of fixing methods, maintaining regularity in position fixing,
123
verifying estimated positions, taking visual bearings and soundings, and monitoring cross -track error.
124
Other important factors such as compliance with the international regulations for the prevention of collision at sea,
125
managing non -navigational emergencies, ensuring proper time management,
126
maintaining an effective lookout, monitoring underkeel clearance,
127
verifying waypoints, and checking GPS fixes must also be continuously observed.
128
Through effective monitoring,
129
the navigator ensures that the vessel safely follows the intended passage while promptly responding to any deviations or unexpected conditions.
130
That's all for now.
131
I hope you found this video helpful.
132
See you next time.
133
Thank you for watching.
134
Bye.

앱 다운로드

유창하게 말하는 데 필요한 모든 것

AI 발음 평가문장마다 점수 확인
IPA 발음 연습모든 소리 마스터
단어 학습나만의 단어장 만들기
단어 게임놀면서 외우기

같은 채널

FOR YOU

추천 영상

배경 및 맥락

이 비디오는 선박의 안전한 항해를 위한 '항로 계획'에 대해 설명합니다. 항로 계획은 출발부터 도착까지의 모든 단계를 포괄하며, 4가지 단계(평가, 계획, 실행, 모니터링)로 이루어집니다. 특히 평가 단계에서는 해도, 조석표, 기상 정보 등 다양한 자료를 수집하고 분석하는 과정이 중요합니다. 이런 전문적인 주제의 영상은 영어 듣기와 발음 연습에 좋은 자료로, 영상 영어 공부에 적합합니다.

일상 대화에 유용한 상위 5개 표현

  • comprehensive plan: 포괄적인 계획. "항로 계획은 포괄적인 계획입니다"처럼 사용.
  • navigational hazards: 항행 위험. "항행 위험을 식별해야 합니다"에서 활용.
  • compliance with regulations: 규정 준수. "규정 준수가 중요합니다"로 표현.
  • mandatory routing systems: 의무 항로 시스템. "의무 항로 시스템을 따라야 합니다"에서 사용.
  • fuel planning: 연료 계획. "연료 계획을 위해 거리표를 참고합니다"처럼 활용.

단계별 쉐도잉 가이드

이 영상은 전문 용어가 많아 쉐도잉(shadow speech) 시 주의가 필요합니다. 다음 단계로 연습하세요. 1. 먼저 영상을 2-3회 듣고 전체 내용을 파악합니다. 전문 용어의 발음을 주의깊게 듣습니다. 2. 문장 단위로 멈추고 따라합니다. 영어 발음 교정을 위해 특히 강세와 억양을 모방하세요. 예를 들어 "comprehensive"는 '컴프리헨시브'가 아닌 '컴프리헨시브'로 발음합니다. 3. 속도를 조절하며 연습합니다. 처음에는 느리게, 점차 원래 속도로 따라가세요. 4. 녹음하여 자신의 발음과 원본을 비교합니다. 차이점을 찾아 개선합니다. 5. 전체 영상을 한 번에 따라하며 영어 회화 연습을 마무리합니다. 이 방법으로 전문 영상도 효과적으로 활용할 수 있습니다.

이 영상의 문법

화자가 가장 많이 쓰는 문형을 영상 속 실제 표현과 함께 정리했습니다.

문형영상 속 표현
수동태 be + 과거분사 — 누가 하는지보다 무슨 일이 일어나는지에 초점can be found · is stated · is considered
현재완료 have/has + 과거분사 — 과거의 일이 지금도 관련이 있을 때has been collected · has been completed · has been

쉐도잉이란? 영어 실력을 빠르게 키우는 과학적 방법

쉐도잉(Shadowing)은 원래 전문 통역사 훈련을 위해 개발된 언어 학습 기법으로, 다언어 학자인 Dr. Alexander Arguelles에 의해 대중화된 방법입니다. 핵심 원리는 간단하지만 매우 강력합니다: 원어민의 영어를 들으면서 1~2초의 짧은 지연으로 즉시 소리 내어 따라 말하는 것——마치 '그림자(shadow)'처럼 화자를 따라가는 것입니다. 문법 공부나 수동적인 청취와 달리, 쉐도잉은 뇌와 입 근육이 동시에 실시간으로 영어를 처리하고 재현하도록 훈련합니다. 연구에 따르면 이 방법은 발음 정확도, 억양, 리듬, 연음, 청취력, 말하기 유창성을 크게 향상시킵니다. IELTS 스피킹 준비와 자연스러운 영어 소통을 원하는 분들에게 특히 효과적입니다.

섀도잉 방법: 단계별 전체 가이드 읽기 →