Shadowing-Übung: Nature-based Solutions in action: Lessons from the energy and water sectors - Englisch Sprechen Lernen mit Video

Übungsmodus wählen

Jeder Modus öffnet einen Übungsraum im Vollbild.

655 Sätze
Wenn Sätze zu kurz oder zu lang sind, klicke auf Edit, um sie anzupassen.
1
Welcome everyone to this
2
Institution of Environmental Sciences webinar, Nature -Based Solutions in Action, Lessons from the Water and Energy Sectors.
3
My name is Ethnie Childs and I'm Head of Communities
4
and Partnerships at the IES and I'm going to be hosting the discussion today.
5
So this webinar is going to provide an introduction to nature -based solutions, exploring how nature can support sustainable and resilient outcomes.
6
And this will be illustrated through case studies from the water and energy sectors.
7
The webinar has been organised by our climate action community, an interdisciplinary community that champions transformative approaches to reshaping unsustainable systems.
8
It brings together IES members from across specialisms and sectors for regular events and discussions, exploring topics related to climate adaptation, mitigation and resilience.
9
Once we get started, I'll pop a link in the chat
10
so you can find out a little bit more about that community.
11
I'm absolutely delighted today to be joined by our two speakers, Matthew Ling and David Hutchinson.
12
Dr. Matthew Ling is a nature -based solutions lead at GHD, with over 18 years of experience in biodiversity, climate resilience, natural capital and green infrastructure.
13
He advises clients on integrating nature -based solutions into infrastructure, policy and investment decisions, and leads GHD's role in CEN's pioneering
14
Nature for Network's innovation programme.
15
Prior to joining GHD, Matthew led the Cambridge Canopy Project for Cambridge City Council
16
and spent nearly eight years at the UN Environment Programme's World Conservation Monitoring Centre, delivering international projects on biodiversity, ecosystem services and environmental decision making.
17
David Hutchinson is a technical operations manager for Galliford Tri, bringing 18 years experience of sewer and drainage infrastructure design to the long -standing
18
Seven Trent frameworks.
19
As design delivery manager for the Seven Trent Mansfield Green Recovery Project, he led the combined internal
20
and external design teams in the delivery of the town -wide suds implementation to mitigate flooding
21
and CSO activation through natural drainage solutions.
22
Thank you so much to you, Matthew and David.
23
I also wanted to say a thank you to Kripa Dwarakarnas
24
and the team at GHD for making this webinar possible
25
and for hosting a little in -person get -together as well at the same time.
26
To all of our attendees, thank you for joining.
27
As usual, at the end of the presentation, there'll be some time for Q &A,
28
and you can submit questions at any point during the presentation using the Q &A function, which you should find along the bottom of your screen,
29
and I'll read these out on your behalf later on.
30
In the meantime, I'm really pleased to hand over to you, Matthew, as our first speaker.
31
Thank you.
32
Thank you very much for that, Ethne.
33
So we're just going to have a quick, I say quick, 10 or so minutes focusing on nature -based solutions,
34
and then I'll hand over to David for his spotlight on the 7 Trent Manfield project,
35
and then I will go back to myself to talk about a project in the energy infrastructure space.
36
so thank you very much everyone for joining today um and looking forward to a good session
37
so uh initially um just to set the context of where we are hang on a minute
38
i'm going too fast for my own good wait there already made a booby right so apologies for that
39
so yeah first before we get into what mbs are
40
and how they're applied let's think about the context of why we're here today
41
and what the major focus of what we're trying to achieve through nature -based solutions is
42
so due to the over -exploitation of natural resources
43
and unsustainable practices at a global scale the position
44
we find ourselves in is in the midst of a twin climate
45
and biodiversity crisis globally carbon dioxide emissions continue to increase
46
and are expected to peak in the middle of the decade
47
continuing to fuel climate change alongside the impacts brought about the changes to our climate threats pressures
48
and impacts resulting from land use change pollution invasive species
49
and over exploitation they present multiple risks to biodiversity fueling
50
and an accelerated pace of species extinction the two crises are inextricably linked, one cannot be solved without addressing the other,
51
and viewing them in isolation makes little sense practically nor strategically.
52
Climate change presents us with the greatest threat humanity has ever faced.
53
Even if all our emissions halted tomorrow, our atmosphere would continue to warm.
54
This committed warming would likely see global average temperatures increase by 0 .6 degrees
55
and destined to remain elevated above pre -industrial levels for thousands of years, continuing to affect our biodiversity,
56
impact our climates and affect the suitability of our existing settlements for us to live in.
57
The climate and biodiversity crises must be viewed and tackled together.
58
Thankfully we don't have to look too far for a solution.
59
The answer is all around us.
60
Nature.
61
Nature, by its nature, is resilient, adaptable and sustainable.
62
It supports us entirely, providing us with essential services and many possibilities, also regulating our climate.
63
Strategically using nature and its processes to help address societal challenges like climate change
64
and biodiversity loss is known as nature -based solutions.
65
The definition of nature -based solutions as agreed upon by the UN Environment Programme is presented on the slide, but it is quite long -winded,
66
so the simplest way of thinking of MBS is using
67
and maximising the power and resilience of nature to help us address a range of societal challenges and deliver multiple beneficial outcomes.
68
One of the central tenets of MBS is that they must result in a net gain to biodiversity and ecosystem integrity,
69
as clearly depicted on this conceptual diagram from the International Union for the Conservation of Nature.
70
MBS could be an extremely effective ally in helping us to tackle the climate crisis.
71
It's estimated
72
that more than one third of climate mitigation measures required to
73
meet the goals of the Paris Agreement could be achieved through nature -based solutions approaches.
74
Each MBS approach, that is protection, restoration, management and creation, has a significant role in this equation.
75
Research has found that by protecting 30 % of lands identified as being globally important for biodiversity,
76
which could prevent land use change that could lead to the liberation of 40 gigatons of carbon dioxide by 2050.
77
It's also been estimated that the restoration of lands converted for agriculture
78
that exist in priority areas for both biodiversity and carbon could lock away 22 gigatons of carbon dioxide by 2050,
79
and regenerative agriculture could remove between 100 and 200 gigatons of carbon dioxide from our atmosphere by the end of the century.
80
The potential is clear.
81
NBS, as a concept, is still relatively nascent.
82
Accordingly, the term was first used in about 2002.
83
However, it's difficult to trace this back.
84
In 2008, the World Bank published a report called Biodiversity, Climate Change and Adaptation, Nature -Based Solutions from the World Bank Portfolio.
85
This presented a number of case studies representing a range of natural solutions, but did not define the term.
86
In 2009, the IUCN stated
87
that it was promoting nature -based solutions to climate change as an integral part of broader adaptation and mitigation plans and strategies.
88
But again, no formal definition was set out.
89
It wasn't until 2016 at the IUCN World Conservation Congress that a formal definition was adopted.
90
Despite the fact that it's a relatively recently termed coin, we can all appreciate that using elements of nature for our benefit
91
and to address specific problems and challenges has existed for a much longer time.
92
NBS is an umbrella term, encompassing other actions and approaches that seek to employ elements and functions of nature for social, environmental and economic purposes.
93
This graphic from the European Commission helpfully depicts this, covering approaches like green infrastructure, sustainable drainage systems and urban forestry.
94
It most strongly builds on something called the ecosystem approach and ecosystem -based adaptation, but it also encapsulates ecological restoration,
95
forest landscape restoration, ecosystem -based mitigation, protected area management, integrated water resources management and many other associated concepts.
96
So it really does package together quite a few different approaches and actions, some of which I'm sure you're already familiar.
97
This is a very nice model, a conceptual model developed by the Nature -Based Solutions Initiative out of the University of Oxford.
98
So it shows the different categories of Nature -Based Solution, which are protection, restoration, management and creation.
99
It demonstrates that not only
100
Nature -Based Solutions, but human well -being, sustainable development as a whole.
101
both of those things are underpinned and supported by biodiversity.
102
It shows the interaction of people and nature together in the yellow circle
103
and the ecosystem services
104
or nature's contributions to people we receive from these interactions in the blue band and how they benefit society.
105
And it demonstrates that the ultimate goal of Nature -Based Solutions is to support sustainable development, human health and well -being and biodiversity.
106
The IUCN defined seven societal challenges which NBS should seek to address.
107
These are climate change mitigation and adaptation, disaster risk reduction, economic and social development, human health, food security, water security,
108
and environmental degradation and biodiversity loss.
109
so the real beauty of nature -based solutions as an approach is
110
that it's multifunctional delivering multiple environmental social and economic benefits from any single intervention
111
so let us imagine for a moment that we are needing to deliver new
112
or replacement drainage as David's actually just shared with you as an example Thank you.
113
So you could, of course, put in an engineered system of concrete and plastic pipes, drains and culverts, which would do the job very well,
114
but they would not do anything in addition.
115
Just transmit water from point A to point B.
116
Or you could look to nature and implement a nature -based solutions approach using bioswales, rain gardens, etc., as David's just shared with us.
117
But even with nature -based solutions approaches, there are different levels which could be achieved.
118
I think this is a very useful picture to show this because it visualizes exactly that point.
119
So the image on the left, technically speaking, is an extra -based solutions approach.
120
It's a bioswale, which does provide some small degree of habitat value
121
and tackles the primary challenge it's intended to of water management.
122
However, with a little bit more ambition, look what could be achieved in the picture on the right.
123
Whilst still effectively doing the same primary job, it now also provides a much greater range of habitat opportunities and support for biodiversity.
124
And I think it's safe to say it provides much more opportunity for engagement
125
and is a real point of interest supporting human wellbeing.
126
This could be taken even further and woody shrubs or trees could be incorporated into the bioswale, providing a range of other ecosystem services like shade,
127
urban cooling, air filtration and carbon sequestration and storage.
128
So the primary function of these bioswales is to protect against flooding, addressing the disaster risk reduction challenge.
129
But as discussed, they also create opportunities for new habitat for pollinators and other invertebrates, as well as habitat for birds,
130
bats and small mammals, contributing to tackling the biodiversity loss challenge.
131
And in the case of the example that included trees,
132
and these systems will also sequester and store atmospheric carbon and contribute to the climate change adaptation and mitigation challenge.
133
And finally, these new habitats contribute to urban greening, shade provision, urban cooling and placemaking in general, helping to support human physical and mental well -being,
134
therefore contributing to the human health challenge.
135
The multiple benefits
136
that can be realised from taking nature -based solutions approaches is what differentiates them from traditional single function engineered options
137
and that really is their unique selling point, their USP, and why they can be such powerful approaches
138
and should be considered in any sustainability strategy as they will contribute to the attainment of a range of targets.
139
There are many reasons additional to this that businesses
140
and other organizations may want to bring MBS approaches into their projects and processes.
141
That may be because of desire to use mbs to contribute to corporate net zero targets
142
or to align with emerging concepts or frameworks or to develop resilience for their assets to the impacts of climate change
143
it's also well understood
144
that by taking nature -based approaches organizations demonstrate leadership enhance their brand gain competitive advantage and realize other benefits too
145
and now i need to just um yeah so we'll now
146
that we know what nature -based solutions are let's have a look at some of the ways which we benefit from them.
147
So as I said earlier, the benefits we receive from nature are called ecosystem services.
148
These include things like food and water to sustain us, oxygen provision and air filtration,
149
carbon sequestration, nutrient cycling, recreational opportunities and flood management among many others.
150
We benefit from exposure to nature and the flows of services that we derive from it in different ways.
151
Urban green spaces for example are hugely valuable in this sense
152
as vast numbers of people interact with them on a daily basis and therefore derive benefit from them.
153
They are especially important in contributing to our physical and mental well -being.
154
Exposure to and interaction with plants and trees in particular is known to have substantial positive impact on us in numerous ways,
155
many of which are often intangible and unappreciated.
156
For example, just having a view of trees and natural spaces from classrooms can help us to increase academic attainment.
157
And from hospital wards, it can help to increase the rate of post -surgical recovery.
158
Now we've talked about what nature -based solutions are and why you might want to consider them.
159
Let's have a look at some examples.
160
So the scope and scale of MBS application is vast.
161
There's just a few examples presented here, including green walls and green roofs.
162
wetlands for water attenuation and wastewater treatment, coastal management and protection, urban forestry,
163
sustainable soil management, mangrove restoration and establishment, and woodland creation.
164
In short, there is likely to be an option to incorporate more nature into almost any context
165
or project with huge potential to contribute to biodiversity net gain, circular economy, net zero, and other sustainability targets.
166
Nature -based solutions can provide a viable and multi -beneficial alternative to traditional engineered approaches,
167
and they can be deployed in almost any environment or situation to tackle various challenges, as depicted by this range of interventions in an urban context.
168
Incorporating MBS approaches into urban settings creates important habitat, supporting biodiversity
169
and developing connectivity between islands of habitat across cityscapes
170
it can also help our towns become more resilient to climate change
171
and its consequences things like flooding and heat stress making them better for residents and other users
172
now we know what mbs are what they set out to address
173
and achieve let's think about what they are not they are not biomimicry
174
or biomimetics which are concepts which seek to integrate
175
or take inspiration from elements of nature and applying them to human processes and designs.
176
Some good examples of this are velcro for example or the curved wingtips of planes.
177
NBS are also not the same as biophilic design which, whilst it does have some overlaps with green infrastructure in particular,
178
is focused at a different scale with different objectives.
179
Biophilic design works more at the micro scale to integrate elements of nature in the built environment to enhance human experience,
180
for example, green atriums or courtyards and office greening.
181
Green or sustainable design approaches or low impact design and development, as outlined in earlier slides,
182
can include approaches which do fall under the definition of MBS, but it also includes built -in interventions,
183
as David was saying, like permeable paving and rainwater harvesting using barrels, butts and systems, which are complementary but are not MBS in their own right.
184
MBS should not be seen as alternatives to decarbonisation actions
185
and other sustainable practices but they can form part of combined strategic approaches.
186
MBS should not be applied tokenistically, that is to say done in small scale non -strategic ways which deliver little to no positive impact or outcome.
187
Doing so could be seen to be greenwashing.
188
MBS are also not infallible and cannot be treated as set and forget interventions.
189
They need active management and maintenance from the outset, or they will fail.
190
This is then particularly damaging as it then turns any support
191
for these often novel interventions against the broader concept as a whole.
192
And importantly, despite the level of interest in and momentum behind MBS, they should not be seen as a silver bullet to solving all our problems.
193
Hello everyone, my name is Dave.
194
I resilience project uh that gallif had tried with the seven track water
195
and other project partners
196
so at the time this was the largest scale retrofit suns project in the uk
197
and saw us take over 30 million liters of water out of the um the surface water
198
and sewer network whilst also creating four
199
and a half hectares of improved our green space and biodiversity across the town of mansfield
200
um
201
so this was a a very exciting project to be involved in ran for around for about three years
202
i'll do my best to try and condense
203
that down into into circa 10 minutes um so
204
if i can get this to move on
205
so um whilst sustainable drainage systems or suds
206
so they are they use nature -based solutions to try
207
and mimic the natural drainage processes and ultimately capture rain where it lands
208
so rather than in an urban environment where rain falls on an impermeable surface
209
and runs straight into a drain it mimics the permeable
210
or undulating ground so that rain is captured as it lands
211
and then released more slowly back into the drainage networks or into the environment
212
and ultimately it's a case of trying to choose the right
213
type of the right type of subs feature for the right position.
214
So on the Mansfield project we used a combination of everything that you can see on the screen here.
215
The detention basins were actually delivered by another contractor in a
216
kind of a more more of a traditional suds feature if you like so this presentation doesn't really touch on those.
217
The bioswells, verge rain gardens and street rain gardens form the mainstay of the project
218
and then permeable paving is not strictly speaking an based solution
219
but as this was a suds project the paving does kind of form a part of that.
220
So keeping it very brief suds are comprised of working from from bottom up a storage layer of granular
221
or other storage medium to give somewhere for the water to go above
222
that a filter medium which is a slightly finer grade of permeable stone aggregate.
223
a mixture of stone and soil to create a growing medium
224
if you're using a planted type
225
and then plants with a mulch layer around them to suppress weed growth
226
or permeable paving blocks with with gaps in all of the
227
joints to allow the to allow the water to go through
228
and a couple of the kind of other key key parts here is flow controls
229
and check downs
230
so ultimately on the mansfield project the the seven truck business
231
case was uh funding was hinged around taking us a given volume of water out of the network
232
so they were needed that to be uh not to be quantifiable
233
but also because it was retrofitted the all of this water was destined for the sewer network
234
so in some instances the the drain down route on these features was back into that network
235
so needed to be um restricted using a an orifice plate
236
in a in a chamber these chambers were bespoke designed at the beginning of the project
237
and then fabricated en masse for uh installation on site with
238
a a pre -made plastic chamber with a removable orifice plate for easy maintenance
239
and non -return valve to protect the system from any uh any sewage backing up from the combined network.
240
You've also got check dams there on the right hand side.
241
Unfortunately, especially when retrofitting, a perfect site which is nice and flat at the bottom of a sloping catchment is rare,
242
so a lot of the sites that we installed suds into were sloping in themselves.
243
So the check dams are there to cause the water to back up behind each dam,
244
making the most out of the storage layers below ground and above ground.
245
There's a weird notch in the middle there
246
that over spills onto an erosion mat underneath so
247
that the water cascades down using up all the storage before going down by down to the bottom
248
and then being either released back through a flow control chamber as you see there or infiltrating down into the ground.
249
The sheer number of sites that
250
Seven Trent were trying to install across the whole lot of Mansfield meant
251
that their normal capital delivery framework process wasn't really fit for purpose
252
so we worked with Seven Trent
253
and their other contractor partners at the beginning of the project to develop a slightly tweaked end -to -end process.
254
The initial site selection process was done by Seven Trent's outline design consultant, AECOM.
255
They developed an automated tool which assessed all of Mansfield and identified high,
256
medium and low likelihood areas for SUDS to be installed.
257
Their outline design teams then took those
258
and developed them further into an outline design with a rough size
259
and shape and volume associated with it based on site walkovers and initial constraints management.
260
It went through review processes with Seven Trent
261
and with Nottingham Mission County Council for highway safety and then promoted into detailed design.
262
We undertook site investigation, topographic surveys of the catchments to confirm exactly how much water
263
was going to go into each of the suds features
264
that we designed that allowed us to confirm the volume the beneficial storage volume
265
that was in there for the design during the design storm event assess the constraints
266
and come out with a finished design
267
that could be taken out onto site the there was a
268
final highway safety review with not actually county council uh
269
and then and then off we went
270
so the at the height of construction across our half of Mansfield
271
we had some 25 to 30 gangs operating at any one time
272
installing these across wide swathes of the town with all of the logistical
273
and highway noticing challenge that came along with that
274
but that's a that's an entirely different presentation in its own right
275
and then finally handover and flows out at the end
276
so i'm just going to take um briefly talk through sort of each of the intervention types
277
and give a bit of an example to bring them to life
278
so this is the the town center this was one of the first ones
279
that were done it was a bespoke detailed design
280
that was done by a econ
281
and then constructed by galliford try
282
this was a formerly um sort of neglected unused gray car
283
parking space in the in the centre of Mansfield just off the market square
284
and was regenerated using rain gardens grassed areas uh tree pits
285
and sort of seating
286
and to create this this flagship amenity space the the intention
287
being to really show the people of Mansfield what what suds could be
288
and what they could do as a as a way into
289
the what was going to be a three -year program of work across across the whole of the town
290
So perma paving, just to touch on this quickly
291
because it did form part of the project although strictly speaking isn't an NBS,
292
these did sort of fall out of favour in terms of the long street side parking arrangements,
293
these didn't work quite so well as we'd hoped
294
when retrofitting the long and cross falls on the roads tended to channelise the flow
295
so we shifted attention to larger flatter areas such as in the bottom picture there
296
this one being in front of some some garages
297
or the other ones
298
that work quite well with turning heads at the end of
299
cul -de -sacs where the flow could spread out over the paving
300
and really maximize the the joints and soak through into the layers beneath.
301
Moving on to street rain gardens these ones also fell out of favour on the project
302
but these were due to customer objections
303
so a lot of these were in relatively dense housing areas where people relied on on -street parking
304
and clearly these straight street rain gardens are taking up what would have been parking bays
305
there were also problems with people manoeuvring backing off drives
306
and things like that
307
so these tended to attract more objections than any of the other featured types
308
so the these also towards the end of the project stopped
309
to be being promoted in favor of some of the other the other types that will come on soon.
310
Just on the left hand side there this particular one
311
that is pictured used hydro rock blocks which are a compressed fibrous material
312
which has a void ratio in the region of 90 % compared to 30 % or so with granular aggregates.
313
So these mean that we could store a lot more volume per cubic metre excavated below the ground.
314
The only slight drawback being that we needed a concrete boundary wall between the highway structure
315
and the blocks themselves just to to deal with the traffic
316
loading um moving on to verge rain gardens much much better received in terms of customers uh
317
and the local residents these ones but with different constraints
318
so these use the wider grass verges
319
or wide footways as a location to put them however those
320
are the kind of locations where all of the existing utilities are
321
so in particular the sort of telecoms
322
and cable type services tended to interfere with the storage layers below these types of interventions.
323
That's not to say that it's not possible,
324
it just meant there was a little bit more thinking in some of these cases to try and get them in.
325
You can see there the long dropped curbs all the way along the extent of it,
326
allowing the water to run off the road channel and into the inside itself.
327
On the top left there you can see the planting underway these are all drought tolerant plants
328
that are able to deal with the full range of conditions
329
that you get in these from complete drought to completely inundated with water.
330
They were all planted using plug plants
331
or pre -potted to get them to establish quickly
332
and there's a photograph towards the end of a fully established rain garden to give you an idea of what
333
that looks like once it's actually had a year of growth.
334
The bioswales are, these proved to be one of the most successful ones, we've promoted a lot of these towards the end of the project.
335
They're much better at getting a significant volume in,
336
so we would pick up a relatively large area of highway by removing gullies
337
and then piping into a headwall at the top of of this the the other thing to mention is
338
that bioswells tend the word bioswell tends to mean a relatively long
339
and narrow suds feature where on mansfield it it actually more represented a miniature detention basin they combine above
340
and below ground storage and then once fully planted
341
and established look like the picture on the right hand side with clear environment environmental
342
and biodiversity benefits so just i think i'm probably running a little bit low on time
343
so those are the the key challenges i think i've touched on on all of
344
that there the that picture on the left is a bioswale before it's established
345
so the all of the green around the perimeter of it is meadow turf from pictorial meadows
346
that once established looks like the previous picture and you can see there in the foreground the the exceedance gully,
347
so when this is full the water would overspill into the gully
348
and back into the sewer network so it's not introducing any flooding risk.
349
So where would we use suds?
350
The detention basins have a large land take
351
but can deal with a much larger catchment so if you've got space detention basins give you an economy of scale.
352
The bioswales represent a nice happy medium where you've got small to medium green spaces
353
they are very effective additions provide lots of biodiversity for modest drainage catchments.
354
The rain gardens tend to work best as part of wider streetscaping schemes
355
and where you haven't got any sort of small pockets of green space
356
they can bring greenery to otherwise completely grey spaces along with biodiversity
357
and paving as i say not mbs
358
but they do have their place in sustainable drainage schemes
359
and are best used in flat areas or new build roads where you can control canvas
360
So the Mansfield project ultimately proved that a reduction in peak drainage flow
361
and overflow activation is possible through an entirely suds -based strategy.
362
What we're seeing from 7Trend is rather than full suds schemes like Mansfield, we are getting projects now promoted
363
that are coming through with a hybrid between traditional grey solutions
364
and suds NBS solutions to almost try
365
and pick out the best of both worlds
366
and use them in a complementing way to deliver the flood mitigation
367
that's needed across their catchment with a minimum of carbon impact and maximising biodiversity and community benefits.
368
So I'm now going to briefly talk you through the Nature for Networks project,
369
which we've been helping to deliver with and on behalf of Scottish Southern Electricity Networks distribution since 2023.
370
We initially carried out a three -month scoping phase, which was followed by a six -month proof -of -concept phase.
371
And in February this year, we were awarded nearly eight million pounds of funding through Ofgem's Strategic Innovation Fund to carry
372
this work through a five -year field demonstrator testing phase.
373
I was going to talk to you a little bit about SSEN and their broader context, but in the name of time,
374
I think I'll skip through some of that.
375
There's some details on the slide about the two networks that they operate in.
376
So as we know, electricity networks form a major component of our critical national infrastructure
377
and network assets are exposed to the increasingly unpredictable and severe impacts brought about by climate change, like flooding and extreme heat.
378
To date, only hard engineering solutions are employed to overcome network problems
379
and challenges however nature could provide us with other options
380
and approaches which are not reliant on steel and concrete are effective
381
and provide climate biodiversity social
382
and well -being benefits among others although these nature -based solutions
383
exist in other contexts they've not been previously applied with electricity
384
network infrastructure the nature for networks project set out to explore what
385
if any possibilities exist for electricity distribution network operators in the UK and beyond to use nature -based solutions.
386
For electricity networks, as with every other sector, they are facing more frequent and more extreme weather events, posing huge risks in terms of customer supply.
387
For an example, an assessment conducted by SSCM before the commencement of the project found
388
that 65 of their primary substations were at risk of flooding, with the potential to affect more than 650 ,000 customers.
389
It's essential therefore that these assets are safeguarded.
390
The project began with three framing questions to guide our approach.
391
These were what assets exist across electricity distribution networks, what challenges and problems do those assets face now and then potentially into the future,
392
and what if any current engineering solutions or approaches are employed to overcome these challenges.
393
To address the first framing question we needed to map out all the relevant assets.
394
So through engagement with SSCN and drawing on our own in -house technical experience and expertise from our energy solutions teams,
395
we specified the various assets of relevance to the project.
396
And to identify what challenges or problems the network assets experience now, and again potentially looking into the future,
397
SSCN made their fault data available to us for analysis.
398
Now whilst that doesn't provide a complete picture of the challenges
399
and problems encountered as it only relates to faults in the network it's a good indicator of the range
400
and main sources of problems that they experience engagement
401
and consultation with sscn and review of other materials that they hold
402
and various other resources like engineering justification papers for example provided further insights into other challenges experienced across their networks.
403
Some of these included flooding, overheating, rodents and other vermin, security, noise, visual amenity, contamination,
404
short circuits due to nesting birds and other wildlife and high embodied carbon, for example.
405
we then reviewed the range of traditional engineered solutions
406
that are being used to overcome these problems
407
and challenges things like security fencing and flood barriers
408
and the undergrounding of cables amongst others we then reviewed all of this information
409
and data together and developed a theoretical list of potential nature -based solutions approaches
410
which could be applied to help overcome or alleviate those problems and provide suitable potential alternatives to those current engineered approaches.
411
That list included woodland establishment, strategic use of other forms of vegetation, bioremediation, sustainable drainage systems, green infrastructure,
412
natural flood management, marine habitat creation and peatland restoration among others.
413
Through the project so far,
414
we have assessed the feasibility of applying MBS to an energy network as effective and viable alternatives to traditional engineering.
415
We identified 14 potential approaches and compiled them in an MBS catalogue.
416
We conducted deeper analysis and design of four specific MBS approaches and their applications to SSCM's networks.
417
We focused on identifying barriers and enablers for each approach to be acceptable by the regulator and to the network customers.
418
We've investigated how engineering standards could be replicated for these solutions
419
and factored these into the concepts and outline designs to ensure that each MBS approach is not just a theoretical exercise,
420
but something that could actually be deployed into business as usual somewhere down the line.
421
We've also developed key performance indicators to measure the performance
422
and function of each MVS and we've developed site selection criteria and identified a range of trial sites.
423
Now we are underway with the field testing program we're making good progress in terms of planning
424
and design of these different physical demonstrators
425
and this is a crucial step to ensure that we can evidence their effectiveness and document the steps needed to consent,
426
design, deliver and maintain these solutions.
427
Now we're going to have a closer look at the four specific use cases
428
which the project is progressing in the field demonstrator testing phase.
429
The first of these is linear woodland in relation to overhead lines.
430
The current situation with overhead lines is that they cross all types of land
431
and unless there's a specific requirement for demand or demand to underground those cables,
432
most typically owing to visual impact concerns they are left exposed to the elements
433
and the risks from adjacent vegetation
434
and other windborne materials for example where existing woodland is present
435
cuttings are made for the lines to pass through these forest blocks
436
and that vegetation presents a liability requiring regular monitoring
437
and management in open landscapes on the other hand overhead lines pass through with little interruption.
438
However, with little topographic shelter, the lines are completely exposed to the full force of wind,
439
rain, snow and ice, which can lead to lines touching and short -circuiting, line breakages, breaking or falling poles, impact from flying debris and bird strikes.
440
Our proposed MBS approach to overcome or mitigate against these challenges was to design, specify and establish linear woodland immediately adjacent to the overhead line corridors.
441
The trees and shrubs in these linear woodlands would be planted at specifically defined distances from the line such
442
that they could never come into direct contact with the assets themselves.
443
By establishing woodlands of this nature in this way we could strategically safeguard network assets enhancing network reliability
444
and performance and delivering a wide range of additional co -benefits like habitat provision, carbon sequestration and storage, enhanced visual amenity,
445
recreational opportunities, physical and mental well -being support, and the removal of the need to do potentially environmentally damaging undergrounding activities, for example.
446
Our first demonstrated test site for this is currently being prepared for planting this winter.
447
The site is a little over two hectares in area
448
and will be planted with more than 3 ,000 mixed local provenance native tree species.
449
This is a conceptual drawing showing a cross -section of this proposed linear woodland approach on either side of an overhead line,
450
demonstrating how the woodland could provide screening, shelter and protection and showing that it maintains that clearance to the asset itself.
451
Our second use case focuses on using sustainable drainage systems in
452
and around primary substation sites to mitigate against surface water of flood risk.
453
We understand that such solutions may not always be possible owing to site constraints, soil types and conditions, and hydrology, among other factors.
454
But there's sufficient flexibility and a range of approaches that make this family of native -based solutions a good potential option.
455
We envisage using biodiverse swales, retention ponds, detention basins, and so on, as in the example that David presented, in fact, as well as other features,
456
to reduce flood risk at vulnerable sites.
457
A trial site location has been identified and we're in advanced discussions with the landowner, a local authority, about access, design and management arrangements.
458
The proposal is to daylight or open up an existing culvert which the council are in favour of.
459
The third use case relates to oil -filled transformers at substation sites.
460
So this is a bit of an interesting one.
461
So where you have ground -mounted transformers containing more than 200 litres or more of insulating oil,
462
they require secondary containment mechanisms to prevent oil escaping into the environment in case of equipment malfunction or failure.
463
Currently, concrete bunds form basins around transformers providing this secondary containment, as well as providing fire protection measures whereby
464
if a fire were to start in the transformer and a catastrophic leak of oil occurred,
465
the fire would be contained within the bunded basin and prevented from moving further across the broader substation site.
466
Whilst concrete bunds and basins are very effective they rely on huge amounts of concrete
467
with that associated carbon footprint and again contributing to further climate change impact
468
which is a direct challenge to SSCN's net zero targets.
469
In the project's discovery phase
470
we conceptualized a potential MBS alternative using bioswales to provide the
471
same secondary containment function whilst not being reliant on large quantities of concrete.
472
And that would also provide a range of co -benefits such as habitat provision, microclimatic enhancements and visual amenity improvements.
473
In the earlier phase of the project we developed this concept further to consider layout, dimensions, materials, planting specifications, site selection criteria,
474
access and egress for health and safety reasons and we've identified potential trial sites.
475
We've subsequently developed a detailed fire testing specification
476
and are currently in the process of procuring a specialist contractor to undertake this work.
477
If the design passes, this phase will move on to detailed design and build at the identified site location.
478
The final one focuses on overhead lines again, but specifically the wooden poles that go with them.
479
So across SSEN's distribution network, there are more than 128 ,000 kilometres of overhead lines and underground cables,
480
much of which passes across farmland.
481
Overhead line poles on farmland are exposed to risk from collisions with farm vehicles and equipment, and from potential disturbance and interference from livestock.
482
Collisions and other direct impacts with these assets can result in minor temporary service disruptions
483
or more major disruptions where infrastructure is requiring to be replaced.
484
Our last use case focuses on a solution to seek to address this.
485
Engineered solutions which could be used to protect these assets include various forms of fencing,
486
sheathing or other livestock focused solutions such as scratching or rubbing devices.
487
However, we understand that many overhead line poles are left simply unprotected.
488
Our proposed nature -based solution approach is to establish thorny hedgerows
489
in small corral type enclosures around the base of overhead line poles, and that would completely exclude livestock access to the assets.
490
The use of stiles or gated entries for accessing egress would allow engineers to conduct site visits and maintenance work.
491
Our proposed design creates a hedge around the perimeter of the asset with enough space inside for an engineer to operate.
492
The outer diameter of these would be sort of three meters or more on each aspect,
493
creating a very visible and apparent object for farm workers in vehicles to observe and work around safely.
494
Species which could be included are kind of any native thorny plants so blackthorn, hawthorn, holly, roses, brambles etc.
495
Modifications to the designs could be made specifically to accommodate other infrastructure like end pole arrangements or cable stays.
496
Following specific feedback we understood
497
that this design could be shaped in way that's more practical to plow around or to work around in vehicles.
498
One of our project partners is the James Hutton Institute based in Scotland
499
and they are preparing to establish a number of these demonstrators on their glensock farm this winter
500
so that one's in quite a good state of advancement.
501
I'll wrap up there that's the end of my project spotlight.
502
So I don't know if there's still time for some Q &A, but I'll hand you back over to Effie.
503
Thank you very much.
504
Thank you so much, Matthew.
505
That was brilliant.
506
A really interesting project there with SSEN.
507
So thank you so much for talking us through that.
508
We are a little bit over, but for those of you who can stay on,
509
I'm suggesting maybe we go through a couple of questions before I do the outro, if you're both comfortable with that.
510
I can see nods, so that's good um so um David
511
if I could start with you um thank you
512
so much for your example that was really interesting to see
513
and you kind of talked through different um approaches you'd use
514
and how some of them were more um kind of accepted than others in the community um I wonder
515
if you could talk about whether there was any kind of co -creation
516
or co -production with residents um and uh
517
and whether kind of community engagement is going to be one of the things
518
that you take forward in future projects yeah okay
519
so the there was some very limited community engagement the um
520
seven trend did reach out in the very early stages of the project
521
and ran um sort of community open days and things like
522
that but the the scope
523
and scale of the project across the whole of mansfield made
524
it very difficult to have um you know very small small scale
525
and engagements with residents on any any given road
526
or group of roads because the the hundreds of roads
527
that we're working working on across across mansfield made that very difficult
528
but yes it's definitely a big lesson learned for for us
529
and for seven trend or in terms of that community engagement
530
and the impact on um on on the communities the the positive impacts in terms of the green space
531
that these bring
532
but the those sort of the negative impacts on actually the way people use the roads as well
533
so that that is being taken forward now
534
that schemes are being promoted with slot with sort of smaller scale suds in addition to gray space means
535
that that engagement can be that that bit more detailed with the communities on the ground in those locations.
536
That makes a lot of sense thank you very much
537
And one for you, Matt.
538
So given that policy financing and technical standards still favour traditional grey infrastructure,
539
what changes do you think are needed to promote nature -based solutions and wider nature -positive engineering?
540
You did mention standardisation in your presentation, so I'd be keen to know your thoughts on that,
541
especially given some of kind of David's reflections around the need for bespoke approaches to different locations.
542
thank you yeah i think um one of the major barriers still is sort of general uncertainty
543
and skepticism around i guess ultimately will they deliver what you want them to i think
544
uh better data capture better data sharing on
545
that front is going to be a big asset to help um promote further rollout
546
so where where projects are underway in you know
547
and in any different sense
548
i think finding a way to capture how much schemes have cost what the level of benefit
549
they're delivering is uh engagement numbers you know any interesting
550
and relevant metrics to support their general function i suppose
551
i think all of that's going to help to paint a much better picture around um deliverability
552
and sort of cost effectiveness that often comes into it as well um
553
and so i think all of that is going to be an important part of
554
that equation great thank you um
555
and for both of you um there's a question
556
that's coming up quite a lot around kind of maintenance of nature -based solutions
557
so once the nature -based solution has been implemented um kind of how is maintenance managed whose whose responsibility is
558
that how is that kind of thought about throughout the design um
559
and on and onwards shall i jump in so specifically from that
560
seven trend um committed to maintaining these over the long term
561
so the their approach was that
562
if they were to build a gray sort of traditional gray solution they would have to maintain
563
that over the course of its life so swapping
564
that for a for a green solution they're using the same maintenance money
565
but to maintain the the sud solutions across mansfield as part
566
of their network great thank you um matthew did you want to come in on
567
that at all yeah i think i mean it's going to vary in every individual situation
568
and context i think um
569
so recently i was talking to a specialist provider who develops green living walls for example um
570
and very often there's a lot of criticism around those in particular
571
because once they fail they're very obvious and people point at them
572
and say oh my god what is that um
573
and it looks really really bad whereas you know on the flip side
574
if they're vibrant and doing really well and um
575
uh so lush and green still it's a real positive asset
576
so they're very very stark contrast and that provider said
577
that they now don't provide them sort of on an individual basis it it goes with the building
578
so it's signed up as part of the sort of the terms of taking on a new building
579
and it's built into the insurance policies and stuff and i thought
580
that was a really interesting approach so that that bakes in
581
that maintenance regime from the outset and for the lifetime of the whole building
582
so regardless of whether
583
or not you get new tenants coming in there is no question around maintenance
584
and upkeep so i thought that was really interesting um
585
but otherwise some of the examples
586
that we're looking at through the projects um you know sscn whilst
587
they have a huge impact across vast swathes of land they aren't big land owners in their own right so things
588
that we can do within the fence line of their um substation sites for example
589
that's sort of within their control but as soon as you go outside the fence it's either on farmland
590
or it's in within the public realm so it's a question of whether
591
or not it becomes adopted by a local authority and
592
if that's acceptable to them and these are questions
593
that we're sort of unpicking
594
and exploring through the project in fact great thank you that's really interesting um
595
and then final question um i'm sorry
596
if we didn't get to your question i will pass them on
597
if you're both happy with that um so
598
that i can get back to people
599
if they're interested um sorry the final question is around um uh monitoring um
600
so thinking about the kind of monitoring of outcomes specifically um
601
is is there a monitoring uh kind of schedule in place
602
for some of these nature -based solutions how will how will
603
there kind of be evaluation as to whether the outcomes
604
that were expected from these mbs have delivered in practice
605
and david i can see you've unmuted yeah i'll jump in on
606
so on mansfield there was combined approach where a a portion of the sites
607
that we installed were installed with standpipes
608
and water level monitors to get real -time data correlating rainfall
609
to the the storage volumes within the sites to verify
610
that they were doing what we expected them to do and
611
that that was run as a a joint academic exercise between Semtrent
612
and the University of Sheffield and the there were also sewer network monitors
613
and there was a they did a post a post project hydraulic um uh monitoring
614
and then hydraulic modeling exercise to to verify the impact
615
that these um these installations had on the on the network performance great thank you um
616
and matthew did you want to comment on this
617
i think i mean it sort of plays back to my comment earlier around
618
that sort of greater provision of data to to evidence uh
619
that they're effective and what have you so i think it's really important
620
and a good point to raise um so in the project
621
that we're delivering nature for networks there's
622
because it's public money for a start it's really important
623
that we are capturing all of that information and we are
624
so we've developed the key performance indicators and we'll be doing
625
that sort of long well me
626
that for the lifetime of the project at least we'll be monitoring
627
and capturing all of that data um i think it's challenging
628
so unless unless there is a a big project like the
629
one david's been presenting on where you can bring in an academic partner
630
i think that's often a good way to to do this
631
but um otherwise if it's a one -off interventions it might be cost prohibitive sometimes
632
but um yeah no less valuable so i think being creative around
633
And finding a way to incorporate that monitoring is certainly valuable.
634
Brilliant.
635
Well, I want to say a massive thank you to you,
636
Matthew, and you, David, for presenting today and to all of our attendees for coming along as well.
637
Thank you for bearing with us with a few of the technical challenges and for staying on a bit longer as well.
638
It's been a really interesting presentation and discussion.
639
This webinar has been recorded and it will be made available on our YouTube channel
640
and if you are watching the recording please do subscribe to the channel like the video
641
and hit the bell to gain notifications of new content um
642
if you enjoyed today please do take a look at the other IES events you can see
643
that on our website
644
and I've actually um dropped a link in the chat to our next webinar
645
which is on the 26th of October and is on powering healthy seas
646
and this webinar will examine the concept of a nature positive
647
offshore wind transition exploring how spatial strategic planning policy reform
648
and conservation action can help deliver both thriving SEAS and accelerated renewable energy deployment.
649
Finally, if you are an IES member watching, don't forget to record your attendance using the CPD tool,
650
which you can do in the members portal of the website.
651
And if you're not a member, please do consider joining the IES to support your professional development.
652
I'm afraid that's all we have time for.
653
Thanks again, Matthew and David.
654
Have a great rest of your day.
655
Goodbye.

App herunterladen

Alles, was du zum fließenden Sprechen brauchst

KI-AussprachebewertungJeder Satz bewertet
IPA-TrainingJeden Laut meistern
WortschatzBaue deinen Wortschatz auf
VokabelspielSpielend lernen
FOR YOU

Empfohlenes Video

Wortschatz und Sprechhinweise zu dieser Lektion

Diese Sprechübung basiert auf dem Video „Nature-based Solutions in action: Lessons from the energy and water sectors“. Diese Wörter kommen am häufigsten vor: nature, solution, project. Dieses Video enthält 655 Sätze und 8781 Wörter zum Nachsprechen. Der gesprochene Teil dauert 55:12. Der Sprecher spricht in natürlichem Tempo, etwa 159 Wörter pro Minute, ähnlich wie im Alltagsgespräch. Nur 80 % der Wörter gehören zu den 3.000 häufigsten im Englischen, der Wortschatz ist also anspruchsvoll.

Wichtiger Wortschatz in diesem Video

15 lernenswerte Wörter aus dem Video, mit Aussprache und Bedeutung:

WortAusspracheBedeutung
flood Substantiv/flʌd/Flut, Überflutung
infrastructure Substantiv/ˈɪnfɹəˌstɹʌkt͡ʃə/Infrastruktur
sustainable Adjektiv/səˈsteɪnəbəl/nachhaltig, aufrechterhaltbar
drainage Substantiv/ˈdɹeɪnəd͡ʒ/Entwässerung, Drainage
monitor Substantiv/ˈmɑ.nɪ.tɚ/Aufpasser, Wächter
overhead Substantiv/ˈəʊvəˌhɛd/allgemeine Unkosten
contribute Verb/kənˈtɹɪb.jut/beisteuern, beitragen
habitat Substantiv/ˈhæb.ɪ.tæt/natürlicher Lebensraum, Standort
engagement Substantiv/ɪnˈɡeɪd͡ʒ.mənt/Verpflichtung
intervention Substantiv/ɪntɚˈvɛnʃən/Intervention, Eingriff
basin Substantiv/ˈbeɪsɪn/Becken, Waschbecken
ecosystem Substantiv/ˈikoʊˌsɪstəm/Ökosystem
concrete Adjektiv/ˌkɑnˈkɹit/konkret, bestimmt
restoration Substantiv/ɹɛstəˈɹeɪʃən/Restaurierung, Wiederherstellung
woodland Substantiv/ˈwʊd.lənd/Wald, Forst

Phrasal Verbs, die du hören wirst

WortAusspracheBedeutung
bring together Verbzusammenführen
carry out Verb/ˈkæ.ɹi aʊt/raus tragen
come along Verbmitgehen
come up Verberscheinen
find out Verbherausfinden, erfahren
get back to Verbsich melden
go down Verbabsteigen, hinabsteigen
lock away Verbwegsperren

Sätze zum Wiederholen

Kurze, vollständige Sätze aus dem Video, die du im Alltag wiederverwenden kannst:

  • Let's have a look at some examples.
  • I think I'll skip through some of that.
  • I'm afraid that's all we have time for.

Grammatik in diesem Video

Die Strukturen, die der Sprecher am häufigsten verwendet, mit den genauen Worten aus dem Video:

StrukturIm Video
Bedingungssätze if + Satz, will/would + Verb – eine Bedingung und ihre FolgeIf the design passes, this phase will move
Present Perfect Continuous have/has been + -ing – eine Handlung, die früher begann und noch andauertwe've been helping · david's been presenting
Present Perfect have/has + Partizip Perfekt – eine vergangene Handlung, die jetzt noch wichtig isthas been organised · has ever faced · has found
Passiv be + Partizip Perfekt – wichtig ist, was geschieht, nicht wer es tutwill be illustrated · has been organised · be joined

Aussprache, auf die du achten solltest

Der Sprecher verwendet 81 Kurzformen und abgeschwächte Formen, zum Beispiel I'm, we're, they're. Sprich sie in der kurzen Form, so wie du sie hörst.

  • Die Laute „sh“ und „zh“: intervention /ɪntɚˈvɛnʃən/, restoration /ɹɛstəˈɹeɪʃən/, presentation /ˌpɹɛzn̩ˈteɪʃn̩/, adaptation /ˌæd.æpˈteɪ.ʃən/, capture /ˈkæp.(t)ʃɚ/
  • Lange Wörter – auf die Betonung achten: infrastructure /ˈɪnfɹəˌstɹʌkt͡ʃə/, sustainable /səˈsteɪnəbəl/, intervention /ɪntɚˈvɛnʃən/, ecosystem /ˈikoʊˌsɪstəm/, restoration /ɹɛstəˈɹeɪʃən/

Laute, die Deutschsprachigen schwerfallen:

  • /w/ — mit runden Lippen, nicht wie das deutsche „w“ (/v/): whilst /waɪlst/, woodland /ˈwʊd.lənd/, underway /ʌndəɹˈweɪ/, equation /ɪˈkweɪ.ʒən/, webinar /ˈwɛb.əˌnɑː/
  • Stimmhafter Auslaut — /b/, /d/, /g/, /z/, /v/ am Wortende nicht verhärten: flood /flʌd/, drainage /ˈdɹeɪnəd͡ʒ/, overhead /ˈəʊvəˌhɛd/, woodland /ˈwʊd.lənd/, installed /ɪnˈstɔːld/
  • /æ/ — offener als „ä“: habitat /ˈhæb.ɪ.tæt/, adaptation /ˌæd.æpˈteɪ.ʃən/, capture /ˈkæp.(t)ʃɚ/, establish /ɪˈstæb.lɪʃ/, asset /ˈæsɛt/

So übst du mit diesem Video

  1. Höre dir das ganze Video einmal an, ohne zu sprechen, und notiere die Wörter, die du nicht kennst.
  2. Beginne mit 0,75-facher Geschwindigkeit, sprich Satz für Satz nach und wechsle zur normalen Geschwindigkeit, sobald es leichtfällt.
  3. Nimm dich auf und vergleiche mit dem Original; achte dabei auf Wörter wie flood, infrastructure, sustainable.

Was ist die Shadowing-Technik?

Shadowing ist eine wissenschaftlich fundierte Sprachlerntechnik, die ursprünglich für die professionelle Dolmetscherausbildung entwickelt und durch den Polyglotten Dr. Alexander Arguelles populär gemacht wurde. Die Methode ist einfach aber wirkungsvoll: Du hörst englisches Audio von Muttersprachlern und wiederholst es sofort laut — wie ein Schatten, der dem Sprecher mit nur 1–2 Sekunden Verzögerung folgt. Anders als passives Hören oder Grammatikübungen zwingt Shadowing dein Gehirn und deine Mundmuskulatur, gleichzeitig echte Sprachmuster zu verarbeiten und zu reproduzieren. Studien zeigen, dass es Aussprachegenauigkeit, Intonation, Rhythmus, verbundene Sprache, Hörverständnis und Sprechflüssigkeit signifikant verbessert — was es zu einer der effektivsten Methoden für die IELTS Speaking-Vorbereitung und reale englische Kommunikation macht.

Shadowing-Technik: die vollständige Schritt-für-Schritt-Anleitung lesen →