跟读练习: Listening part two (Local council report on traffic and highways) @ieltslisteningpro.24 - 通过视频学习英语口语

正在创建课程...
1
Part 2.
2
You will hear a Town Councillor reporting on the local transport network and a recreation facility.
3
First, you have some time to look at questions 11 to 14.
4
Now listen carefully and answer questions 11 to 14.
5
Right.
6
Next on the agenda we have traffic and highways.
7
Councillor Thornton.
8
Thank you.
9
Well, we now have the results of the survey carried out last month about traffic and road transport in the town.
10
People were generally satisfied with the state of the roads.
11
There were one or two complaints about potholes, which will be addressed,
12
but a significant number of people complained about the increasing number of heavy vehicles using our local roads to avoid traffic elsewhere.
13
We'd expected more complaints by commuters about the reduction in the train service, but it doesn't seem to have affected people too much.
14
The cycle path that runs alongside the river is very well used by both cyclists and pedestrians, since the surface was improved last year,
15
but overtaking can be a problem, so we're going to add a bit on the side to make it wider.
16
At some stage, we'd like to extend the path so that it goes all the way through the town, but that won't be happening in the immediate future.
17
The plans to have a pedestrian crossing next to the post
18
office have unfortunately had to be put on hold for the time being.
19
We'd budgeted for this to be done this financial year, but then there were rumours that the post office was going to move, which would have meant there wasn't really a need for a crossing.
20
Now they've confirmed that they're staying where they are, but the highways department have told us that it would be dangerous to have a pedestrian crossing where we'd originally planned it,
21
as there's a bend in the road there, so that'll need some more thought.
22
On Station Road, near the station and level crossing, drivers can face quite long waits if the level crossing's closed,
23
and we've now got signs up requesting them not to leave their engines running at that time.
24
This means pedestrians waiting on the pavement to cross the railway line don't have to breathe in car fumes.
25
We've had some problems with cyclists leaving their bikes chained to the railings outside the ticket office, but the station has agreed to provide bike racks there.
26
Before you hear the rest of the talk, you have some time to look at questions 15 to 20.
27
Now listen and answer questions 15 to 20.
28
So, next on the agenda is proposals for improvements to the recreation ground.
29
Councillor Thornton again.
30
Well, since we managed to extend the recreation ground, we've spent some time talking to local people about how it could be made a more attractive and useful space.
31
If you have a look at the map up on the screen, you can see the river up in the north and the community hall near the entrance from the road.
32
At present, cars can park between the Community Hall and that line of trees to the east, but this is quite dangerous for pedestrians,
33
so we're suggesting a new car park on the opposite side of the Community Hall, right next to it.
34
We also have a new location for the cricket pitch.
35
As we've now purchased additional space to the east of the recreation ground, beyond the trees, we plan to move it away from its current location,
36
which is rather near the road, into this new area beyond the line of trees.
37
This means there's less danger of stray balls hitting cars or pedestrians.
38
We've got plans for a children's playground, which will be accessible by a footpath from the community hall, and will be alongside the river.
39
We'd originally thought of having it close to the road, but we think this will be a more attractive location.
40
The skateboard ramp is very popular with both younger and older children.
41
We had considered moving this up towards the river, but in the end we decided to have it in the southeast corner near the road.
42
The pavilion is very well used at present by both football players and cricketers.
43
It will stay where it is now, to the left of the line of trees and near to the river, handy for both the football and cricket pitches.
44
And finally, we'll be getting a new notice board for local information, and that will be directly on people's right as they go from the road into the recreation ground.
45
That is the end of part two.
46
You now have half a minute to check your answers to part two.
47
Thank you.

关于本课

在本课中,学习者将练习听力理解和口语表达,通过一位市议员对当地交通及娱乐设施的报告,了解与社区生活相关的英语言现实。此课程特别适合希望提高雅思口语能力的学员。当你听取这些信息时,注意其中的专业术语和表达方式,力求在真实的交流场景中理解和应用。

关键词汇与短语

  • 交通网络 (transport network): 指城市或地区中用于交通的全部系统。
  • 车道 (cycle path): 专为自行车和行人设计的道路。
  • 人行道 (pedestrian crossing): 专为行人横过马路而设置的区域。
  • 停车场 (car park): 一个供车辆停放的地方。
  • 儿童游乐场 (children's playground): 为儿童游玩而设计的户外场所。
  • 公告栏 (notice board): 用于发布公共通知和信息的板子。

练习建议

在实践过程中,尽量在听的同时模仿说话者的语调和语速。这是一种称为shadow speak的技术,适用于提高您的英语发音和流利度。注意讲者的停顿和重音,尤其是提到交通和娱乐设施时的语气和节奏,这将有助于你在真实的对话中更自然地交流。在看YouTube学英语时,可以重复听取相同段落并进行模仿,记录自己与原声的差别,并不断进行调整。雅思口语练习尤其强调清晰的发音和流畅的表达,使用本课程的材料可以帮助你达到这个目标。

什么是跟读法?

跟读法 (Shadowing) 是一种有科学依据的语言学习技巧,最初开发用于专业口译员的培训,并由多语言者Alexander Arguelles博士普及。这个方法简单而强大:您在听英语母语原声的同时立即大声重复——就像是一个延迟1-2秒紧跟说话者的影子。与被动听力或语法练习不同,跟读法强迫您的大脑和口腔肌肉同时处理并模仿真实的讲话模式。研究表明它能显着提高发音准确性,语调,节奏,连读,听力理解和口语流利度——使其成为雅思口语备考和真实英语交流最有效的方法之一。