2
music music So far in this program on steam power,
3
we have examined steam production and the different types of boilers and fossil fuels which are used for this purpose.
4
We are now going to shift the focus onto steam utilization by taking a detailed look at the steam turbine
5
which drives the electrical generator.
6
We already studied the various turbine cycles and factors affecting efficiency at the beginning of this program.
7
In this module, we'll look at the main features of turbine construction, including the various components and support systems,
8
such as gland steam, lube and hydraulic oil, and the condenser.
9
The subject of turbine operation, control, and protection will be dealt with in the next module.
10
The steam turbine is certainly one of the most popular prime movers, especially for driving large power generators.
11
The size of steam turbines built
12
and installed runs all the way from about 5 megawatts up to 1 ,000 megawatts or more.
13
So what is it that makes the steam turbine the preferred prime mover in comparison with, say, the diesel engine?
14
Well, there are quite a number of advantages, the main factor being that of physical size.
15
For example, a 30 megawatt steam turbine is probably smaller than a 5 megawatt diesel.
16
Another advantage is that the steam turbine is far less complicated and contains very few moving parts.
17
The moving parts are the rotor which drives the generator and the steam control valves and control gear.
18
The amount of vibration produced by a steam turbine generator and transmitted to the surrounding area is relatively low,
19
provided of course that the machine is in good condition and is correctly installed and aligned.
20
This makes for a quieter operating plant, particularly when compared with the diesel engine or even the gas turbine.
21
The steam turbine runs at high speed,
22
usually 3600 RPM in North America or 3000 RPM in Europe and can therefore be coupled directly to a two -pole generator.
23
Remembering that the diesel engine operates at around 200 RPM,
24
we can see one of the reasons why the specific output of the steam turbine is much greater.
25
One other advantageous factor is the relative ease of controlling the output of the steam turbine.
26
This is achieved simply by adjusting the amount of steam admitted to and flowing through the turbine.
27
As we'll see later, admission valves, also known as control valves, are installed for this purpose.
28
The turbine stop valve, or valves, is located upstream of the control valves.
29
In case of an emergency, the stop valve closes automatically, cutting off all steam supply to the turbine and bringing the machine to a halt.
30
This sketch shows us the major components of a 150 -megawatt reheat turbine.
31
We see here the rotor and the inner and outer casing or shell.
32
This casing surrounds the rotor, leaving very fine clearances between the stationary and moving parts.
33
The objective of the inner casing is to direct the steam through the turbine.
34
The inner casing is fitted into the upper and lower half of the outer shell, which in turn is supported on a heavy reinforced concrete base.
35
The base must be firm enough to ensure rigidity.
36
That is, it must permit no movement in the vertical plane, which could upset the alignment of the machine.
37
The support bearings are allowed restricted movement in the axial plane to cope with expansion of the turbine, as we shall see later.
38
Other components noticeable here are the governor pedestal, which supports the front end bearing, and the governor system.
39
In this particular machine, steam from the stop valve is fed into steam chests located on either side of the turbine.
40
The turbine admission valves are located in each steam chest to control the flow of steam into the turbine.
41
The turbine rotor is directly coupled to the generator rotor to
42
transfer the mechanical energy produced in the turbine to the generator where it is converted into electrical energy.
43
Now, as we progress through this module, we'll be discussing the function of all of these components and many others.
44
At this point, we're mainly concerned with identifying these items.
45
Make sure that you know where the following components are located on your particular turbines.
46
The turbine outer casing.
47
The generator.
48
The turbine rotor.
49
The generator rotor.
50
And the associated coupling.
51
the governor pedestal, the main steam stop valves,
52
the steam chest and associated admission valves or control valves,
53
the location of bearings which support the turbine rotor.
54
Now, the particular machine that we've been studying is made up of several cylinders,
55
and we'll be looking at other cylinder arrangements in a moment. But first,
56
let's take a closer look at a single cylinder machine in order to help us understand the principles of turbine operation,
57
how it actually functions and produces power.
58
As we all know, steam at high pressure and temperature, say 1800 PSIA and 1000 degrees Fahrenheit,
59
is admitted at one end of the turbine.
60
After passing through the turbine, this steam exits at a much lower pressure and temperature,
61
say 50 PSIA and 250 degrees Fahrenheit for a typical backpressure turbine.
62
However, if the turbine is of the condensing type, and this is far more common,
63
then the steam exiting from the turbine will be at a pressure far below atmospheric,
64
say 1 PSIA, and at a temperature of about 100 degrees Fahrenheit.
65
Clearly, the amount of energy in the steam exhausted from the turbine is much less than in the steam entering the turbine.
66
The heat energy has been used to force the turbine rotor to rotate at high speed and consequently produce mechanical energy.
67
But how does it do this?
68
Well, the simple answer is
69
that the turbine blades are designed to take advantage of the decrease in steam pressure and consequent increase in steam velocity.
70
As we know, the heart of the turbine, the bit that makes it work, is the relationship between the fixed and moving blades.
71
The fixed blades guide the steam onto the moving blades.
72
As the steam passes through the moving blades, it causes the disk to which they are attached to rotate, and consequently the shaft rotates.
73
Each pair of stationary and associated moving blades are known as one stage.
74
Most steam turbines contain many stages of blading.
75
In this example of a single cylinder machine shown here, we have seven stages.
76
And do not forget the stationary blade is always ahead of the moving blade.
77
Actually, each pair of stationary blades is shaped to form a convergent divergent nozzle.
78
However, the form of the nozzle is bent to receive the steam exiting from the previous moving stage
79
and then to turn and redirect the steam onto the next moving stage.
80
Now before you raise the question, but what about impulse and reaction type blading?
81
Let me say that in practice, when you're operating a turbine, it's not vitally important whether the blading is impulse or reaction.
82
This is really a design and construction feature.
83
However, it will certainly be worth our
84
while to take a look at this subject as the type of blading used does affect other structural features.
85
Let's first examine impulse blading.
86
As the steam passes through the first row of stationary blades, or nozzles, its pressure decreases, and as a result, the steam velocity increases.
87
These changes are plotted on this graph.
88
As this high -velocity steam is directed onto the moving blade, the impulse pushes the blade forward and consequently produces rotation of the shaft.
89
By the time the steam leaves the moving blade, it has lost much of its velocity,
90
and it then passes on through the next row of stationary blades.
91
Again, the pressure falls and the velocity increases due to expansion of the steam,
92
and once again, this is directed onto the next row of moving blades and so on.
93
We can see that as a result of pressure drop, the velocity of the steam increases each time it passes through a set of stationary blades,
94
but the velocity then decreases as the steam passes through the moving blades and gives up energy.
95
Eventually, when the pressure has fallen to a low value, it can no longer expand and produce work, and it is exhausted from the turbine.
96
But look what happens here to the pressure as the steam passes through the moving blades.
97
It does not decrease, neither does it increase.
98
In fact, the pressure across the moving blades remains the same.
99
It is the change in velocity which actually does the work and provides the energy to drive the turbine.
100
This feature of impulse blading, that is, constant pressure across the moving stage, brings about a certain constructional advantage.
101
As there is no pressure drop, there is no tendency for steam to leak around the outside circumference of the blades.
102
Because of this feature, we will inevitably find that impulse plating is used in the high -pressure stages of the turbine.
103
In fact, you'll often see large holes bored through the wheel or disc in the higher -pressure stages.
104
This is done to ensure that there is no pressure differential across the wheel, and so maintain the correct impulse characteristic of the moving blades.
105
Now let's move on to look at the characteristics of reaction -type blading.
106
In this case, the mechanical force on the blade is caused by reaction as the jet of steam exits from the blade.
107
This is the same concept as a jet engine.
108
With this type of blading, the moving blades are shaped in the same manner as the fixed blade,
109
that is, in the profile of a curved nozzle.
110
This causes the steam pressure to fall as it passes through the moving blade,
111
resulting in an expansion of the steam and an increase in its velocity relative to the blade, causing a powerful jet action.
112
As before, the exiting steam then passes into the next stage of fixed blades,
113
where it is again expanded and redirected to enter the next set of moving blades.
114
So you can see that in this type of blading, the pressure decreases as the steam passes through both the moving blades and the stationary blading.
115
Although the reaction turbine is efficient in its use of heat,
116
there is always the potential for some losses due to steam leaking around the periphery of the moving blades, especially in the high -pressure section.
117
In order to reduce this tendency, a reaction turbine will normally have many more stages,
118
so that the pressure drop in each stage is lower.
119
Consequently, the machine will be physically longer.
120
In practice, a compromise is reached, and today most turbines combine both types,
121
using impulse blading in the high -pressure stages and reaction blading in the low -pressure stages.
122
Now at this point it's time we all took a break
123
and then we'll come back and look more closely at features of turbine construction.
124
For now please switch off the tape and review this material in your workbook.
125
I'm sure we all remember the old trick question, what weighs more, one ton of feathers or one ton of lead?
126
Well, of course, both of these quantities weigh the same.
127
We have just said so, one ton.
128
But there is no doubt that the volume of feathers would be much, much greater than that of lead.
129
In other words, the specific volume of feathers in cubic meters per kilogram
130
or cubic feet per pound is much greater than that of lead.
131
This problem of specific volume is of concern to us when we consider the steam passing through the turbine.
132
We know that the steam pressure falls and consequently its volume must increase as it approaches the low pressure end.
133
In fact, the change in specific volume of steam is quite dramatic, as we can see in this table.
134
One pound of steam at 2 ,500 PSIA
135
and 1 ,050 degrees Fahrenheit occupies a space of one -third of a cubic foot.
136
At 500 PSIA and 500 degrees Fahrenheit, the specific volume is one cubic foot.
137
At atmospheric conditions, the volume occupied by one pound of steam is 27 cubic feet.
138
And in the case of a condensing turbine where we have steam exhausting at,
139
say, 1 PSIA, the specific volume is 333 cubic feet per pound.
140
So one clear consequence of this is
141
that we have to make the casing continuously bigger as we move from the high pressure to the low pressure end.
142
This is very evident to the eye when we look at this single cylinder turbine.
143
But notice, it is not only the casing that must be made bigger,
144
but the turbine blades must also be larger in order to utilize this low -pressure steam.
145
On turbines of high output,
146
say above 100 megawatts, it becomes physically difficult to make the cylinder large enough to accommodate all of the low -pressure steam.
147
To get over this problem, multi -cylinder arrangements are used, and let's look at some of these arrangements.
148
Here we see a common arrangement of two cylinders which may be used for units of up to about 150 megawatts.
149
Crossover pipes are used to connect the exhaust from the high -pressure cylinder to the inlet of the low -pressure cylinder.
150
Most low -pressure cylinders are of the double flow type, where steam enters at the center and flows outwards in opposite directions.
151
This provides some balance to the thrust and tends to keep the shaft centered.
152
As the steam path of the high -pressure and low -pressure cylinders is in series,
153
all of the control is carried out of the steam inlet admission valves at the high -pressure end.
154
The next development from this two -cylinder arrangement introduces reheat and the addition of the intermediate pressure stage of the turbine.
155
A very common arrangement for reheat turbines up to about 250 megawatts is shown here.
156
The high pressure and intermediate pressure cylinders are combined in one casing.
157
But of course the steam path is quite separate.
158
Note
159
that the concept of counter flow is also used here with
160
the steam flowing through the high pressure cylinder in the opposite direction to
161
that of the intermediate pressure cylinder to help produce a balanced thrust.
162
As turbines become bigger and bigger, it is necessary to add yet further cylinders,
163
and the arrangement shown here is typical for machines in the 500 to 600 megawatt range.
164
As you can see, we have separate high -pressure and intermediate -pressure cylinders,
165
and also it has become necessary to add a further low -pressure cylinder in order to handle the high volume of steam.
166
With all of the configurations shown,
167
the general control of steam flow through the turbine is achieved by adjusting the admission valves at the high -pressure inlet.
168
However, note that with reheat units, additional control valves, known as intercept valves,
169
are fitted at the inlet to the intermediate pressure cylinder for protection purposes.
170
We'll be discussing this in detail when we look at control and protection in the next module in this series.
171
Yet another cylinder arrangement used on earlier reheat machines is known as the cross -compound system, shown here.
172
It really consists of two separate turbines, each coupled to their own generator, but interlocked through a common steam system.
173
The high -pressure and intermediate -pressure cylinders drive one generator, while the two low -pressure cylinders drive the other.
174
Again, the steam flow through the combined turbine is controlled at the high -pressure inlet, thus controlling the output of both generators.
175
Of course, the large reheat units
176
that we have been considering would typically be found in central power stations of large utility companies.
177
More recent installations, particularly in industrial situations, are likely to be smaller units,
178
probably within the range of 60 to 150 megawatts.
179
In order to examine some of the basic construction features, let's take a look at this single cylinder machine.
180
Steam is supplied to the steam chest from the boiler after passing through the turbine stop valve.
181
The amount of steam passing through the turbine is regulated by adjustment of steam admission valves.
182
This in turn controls the output of the turbine and the coupled generator.
183
At various stages along the steam path, steam is extracted from the turbine.
184
This extraction steam is commonly used for feed water heating, but there may be other applications as well.
185
The concept is that the extracted steam is put to good use after performing some work in the turbine.
186
You will remember that we discussed this in the first tape in this series when we looked at efficiency.
187
The turbine rotor is supported on journal bearings which are located at each end of the cylinder.
188
It is essential that these bearings retain their correct alignment,
189
as the clearances between the rotating parts and the fixed parts of the machine are extremely small.
190
A thrust bearing is located along with the journal bearing at the governor pedestal in order to locate the shaft
191
and prevent movement in the axial direction.
192
What do we mean by this?
193
Well, in this single cylinder arrangement, the flow of steam through the turbine tends to push the rotor towards the generator.
194
If this thrust was not contained,
195
the rotating blades could conceivably come into contact with the stationary blades of the next stage and cause quite a catastrophe.
196
To prevent this occurrence, a fixed collar on the shaft is held in position by lubricated thrust pads.
197
During construction and maintenance of the machine,
198
these pads are carefully set to ensure that the correct clearances exist between rotating and stationary parts.
199
Allowance must be made for the casing to expand as it becomes heated by the steam flow.
200
In a single cylinder machine like this, the normal method is to anchor the machine solidly at the low pressure end,
201
that is at the turbine exhaust, and allow the front end pedestal to move forwards.
202
In large machines, the expansion in this longitudinal direction may be over one inch, that is 25 millimeters.
203
In this particular machine, the pedestal is fixed to a flexible support, which allows the movement to take place.
204
A more common arrangement on larger machines is to fit the
205
base of the pedestal with sliding feet to allow free movement in the axial direction.
206
Now let's take a close look at a typical rotor.
207
Moving from the front end to the rear, we see first the thrust collar, which bears against the thrust pads during operation.
208
Just ahead of this, there is the portion of the shaft which sits in the journal bearing.
209
This area should be perfectly smooth with no indentations or marks.
210
Moving further along, we come to the gland seals, which are needed to reduce steam leakage along the shaft.
211
We'll be talking about this arrangement in more detail later.
212
We now come to the series of wheels, or discs as they are known, which extend along the length of the shaft.
213
Blades are fitted all around the periphery of the discs and are held firmly in place at the roots.
214
On many machines, further support is provided by fitting rings or shrouds around the outside of the blading.
215
Note the much larger size of the low -pressure blades in order to handle the increased volume of steam at this end.
216
Now, continuing our examination along the length of the rotor, we come to the low pressure end gland seal.
217
This is at the interface between the casing and the rotor.
218
Just on the outside of the casing is fitted the low pressure end journal bearing.
219
At the very end of the shaft, we find the coupling which is used to join the turbine and generator rotors.
220
In addition, at this end of the shaft, we will often find a large gear drive which engages with the turning gear.
221
As we'll see later, the turning gear allows us to rotate the rotor at very low speed,
222
say one RPM, without having steam pass through the machine.
223
This is used during shutdown to ensure even cooling and so prevent distortion of the rotor.
224
More about this later.
225
In earlier machines, the discs are shrunk onto the rotor shaft.
226
A problem with this type of construction is that in some cases,
227
steam may leak along the shaft and cause distortion due to differential heating as well as a loss of efficiency.
228
To overcome this problem, in modern turbines, the discs in the shaft are forged in one piece and then machined.
229
Yet another method of building up the rotor is by welding discs together and so eliminating the shaft.
230
Now remember that in between each disc and associated blades, we have to fit the stationary blades.
231
Let's see how these are held in place.
232
The first time we examine a turbine, we might imagine
233
that these stationary blades could be fixed to the outer casing to line up with the moving blades like this.
234
But we do have a problem with this arrangement.
235
What is there to stop the steam passing around the blade instead of through it?
236
In order to prevent this, a shield known as a diaphragm is constructed extending all the
237
way from the inner diameter of the stationary blade down to the shaft.
238
leaving a small clearance to allow rotation.
239
In practice, the stationary blades are inserted into the diaphragm like this, and the diaphragm itself is fixed into the turbine casing.
240
When diaphragms are removed during maintenance periods, they look like this.
241
And here is a view of the bottom half of the turbine casing with the diaphragms in place.
242
The diaphragms are sized to leave a small inside clearance to allow the shaft to rotate.
243
Seal strips are fitted at this location to prevent steam leakage.
244
After all, we want all steam to pass through the blading, not around it.
245
And we'll be talking about steam seals later.
246
When the turbine is assembled, the rotor must be very carefully lowered into place so that the discs fit perfectly between the respective diaphragms.
247
Once the rotor is in place, the axial clearance can be adjusted and finally fixed in place at the thrust bearing.
248
Similarly, the journal bearings must be adjusted to provide correct alignment with the generator rotor.
249
When all adjustments are complete, the top half of the casing, which is a mirror image of the bottom part,
250
is very carefully lowered into place and finally bolted down.
251
The exterior of the turbine casing must be very well insulated to prevent heat loss.
252
With temperatures at the high pressure end in the region of 1 ,000 degrees Fahrenheit,
253
we could suffer a considerable loss of efficiency as well as an uncomfortable turbine room if the insulation was inadequate.
254
Now in this segment, we've looked at general features of turbine construction.
255
Using this information as a guide, make sure that you check and learn the structural features of your own turbines.
256
At this point, it's time for a break, so please switch off the tape now and review this material in your workbook.
257
We've mentioned several times the terms gland seals and steam sealing strips.
258
It's time for us to take a closer look at these.
259
When we consider that the rotor is turning at high speed, it is obvious
260
that some clearance must be provided for the shaft as it protrudes from the stationary casing at each end of the turbine.
261
Now remember, there is very hot steam at substantial pressure inside the casing at the high -pressure end of the machine.
262
So there is the potential for a considerable amount of this
263
hot steam to leak out through the space between the rotating shaft and the casing.
264
And would we not have the same condition at the low -pressure end?
265
Well, yes, if this is a back -pressure turbine with a positive exhaust pressure at, say, 50 psi or over.
266
Although the pressure and temperature is less, there would still be leakage between the casing and the rotating shaft.
267
But what about the case of a condensing turbine?
268
Well, in this situation, there is a vacuum inside the casing at the low -pressure end.
269
So instead of steam leaking out, air would leak in, and we do not like that either.
270
It could lead to a loss of vacuum and a consequent loss of efficiency.
271
In order to reduce this leakage as far as possible, gland seals are located at each end of the casing.
272
The aim of the seal is to provide a high resistance to the flow of steam or air.
273
This is achieved by the use of a labyrinth seal.
274
The rotating portion on the shaft is slotted like this, while the stationary portion consists of thin metallic strips,
275
which are pressed into the rotating grooves by very light spring pressure.
276
The resultant labyrinth path considerably reduces the leakage of steam out or air in.
277
Even so, there will still be some leakage of steam at the high -pressure end through the gland seal.
278
This leakage steam is extracted from the gland and fed into a low -pressure extraction point.
279
The leak -off valve automatically adjusts the pressure within the gland steam header to maintain approximately 5 PSIG.
280
But even at that low pressure, there will still be some leakage along the shaft into the turbine room.
281
In order to prevent this steam from getting into the turbine room, it is drawn from the outside of the gland seal by a slight vacuum,
282
which is produced by the gland steam exhauster.
283
Some heat is recovered from this small amount of steam, bypassing it through a heat exchanger in the condensate system known as the gland steam condenser.
284
Now let's see what's happening at the vacuum end of the turbine.
285
Well, we definitely do not want air to enter the casing.
286
even the small amount that may flow across the labyrinth seal.
287
In order to prevent the leakage of air into the casing, low -pressure steam is provided from the header to the low -pressure gland seal.
288
This results in a small amount of steam entering the turbine casing, and this is far preferable to air.
289
Of course, some of the steam will also try to pass along the shaft in the opposite direction to atmosphere.
290
But this is captured by the gland steam exhaustor in the same manner as for the high -pressure gland seal.
291
So we can see
292
that leak -off steam from the high -pressure end is useful in providing sealing steam at the low -pressure end.
293
As the load changes, the leak -off valve opening adjusts to maintain the appropriate header pressure.
294
But how does the system work when we're preparing for startup?
295
In this situation, we need to pull a vacuum in the turbine and condenser before admitting any steam into the turbine.
296
So in this condition, we have no leak -off steam.
297
Instead, live steam is supplied to the gland steam header.
298
The live steam supply valve is set to control the header
299
pressure at about 3 psi to coordinate its operation with the leak -off valve.
300
When the turbine comes on load, the leak -off steam from the high -pressure gland feeds into the header and so raises its pressure.
301
When the pressure gets to 3 psi, the live steam supply valve will close.
302
When the pressure rises to 5 psi, the leak -off valve will open enough to maintain this pressure.
303
Remember that there are two basic circuits in the gland steam seal system.
304
First, the gland steam header which supplies steam to the seals or dumps excess steam.
305
The second circuit extracts leakage steam from the extremities of the glands
306
and passes it through a heat exchanger and the gland steam exhaustor.
307
Make sure to check and learn details of your own gland steam system.
308
Sealing strips are similarly used in other parts of the turbine where we need to eliminate or at least reduce steam leakage.
309
A typical example is the interstage seals which are fitted at the inner circumference of the diaphragms where the shaft rotates.
310
In all cases, the seal strips are made of very thin, soft, metallic material.
311
They rub on the shaft and reduce the leakage as much as possible.
312
Of course, as time passes, the sealing strips wear and need to be replaced during regular maintenance.
313
We'll be discussing this aspect in another module in this series.
314
Well, so much for sealing systems.
315
Another very important support system that is essential for turbine operation is that of lube oil and hydraulic oil supply.
316
Let's look at the lubricating oil system first.
317
A continuous flow of lube oil must be circulated through all of the turbine and generator bearings.
318
Typically, the arrangement would look like this for a single cylinder machine.
319
The lube oil supply header is maintained at about 50 psi, and from here the oil is force -fed through each of the bearings,
320
including the turbine thrust bearing.
321
After passing through the bearings, the oil flows into the return header, and from there to the lube oil tank.
322
The lube oil is pumped from this tank in order to feed the supply header.
323
So we have, in effect, a closed cycle.
324
But there are some other important features.
325
First, the need for cooling.
326
As the lube oil passes through the bearings, it picks up heat and its temperature rises, conducting heat away from the bearings.
327
The effect of this would be to continuously raise the temperature of the oil in the tank.
328
In order to prevent this, a cooler is provided, and this is usually placed in the path of the lube oil supply.
329
The lube oil cooler is usually of the tube and shell type, with cooling water passing through the inside of the tubes.
330
It is normal to fit two coolers so that one may be taken out of service for cleaning at any time.
331
Thus, the change can be accomplished without interrupting the supply of oil.
332
Actually, the raising of lube oil temperature in the tank has a slight advantage, in that it allows any moisture contained in the oil to vaporize.
333
For this reason, a vapor extractor is fitted to the top of the tank to draw off any vapor
334
and discharge it to atmosphere.
335
But where does the moisture come from?
336
Well, this may be picked up by the oil in its passage through the bearings, with their proximity to the gland esteem.
337
The vapor extractor will also remove any traces of hydrogen that may infiltrate the lube oil from the generator cooling system.
338
The subject of hydrogen cooling and its associated seal oil system is discussed in the power generation module of this program.
339
More serious yet, the oil is likely to pick up fine pieces of metal
340
and other contaminants in its root through the system
341
and these contaminants could cause serious damage to the bearings and therefore must be removed.
342
Most lube oil systems include a filtering system within the circuit.
343
This may consist of bag -type filters within the oil tank
344
or external cartridge filters or a centrifuge which continuously circulates oil from and back to the tank.
345
Maintaining the cleanliness and purity of the oil is extremely important to good turbine operation.
346
Usually, the lube oil is sampled at regular intervals, say monthly or bimonthly, and analyzed for impurities and other characteristics.
347
The supply of lube oil is so vital to the operation of the turbine
348
and generator that a standby pump must always be provided and maintained, ready for startup on automatic control.
349
But one question comes to mind.
350
What would happen in the case that we lost all auxiliary AC power?
351
This could happen, for example, in the case of a turbine generator trip in a facility with no station service backup.
352
We'd then be faced with the prospect of the turbine generator running down without the circulation of lube oil,
353
a condition that could conceivably damage all of the bearings.
354
In order to prevent this potential disaster, many machines are equipped with a DC oil pump,
355
which would be fed from the station battery in such an emergency.
356
Now let's move on to look at the hydraulic oil system.
357
This system operates at a much higher pressure than the lube oil system, even as high as 2 ,000 psi in some machines.
358
Fireproof synthetic oil is often used as a safety feature.
359
But what is the purpose of this hydraulic system?
360
Well, the high -pressure oil is used as the medium for operating the turbine control system.
361
For example, the servo mechanism, which provides the force to adjust the turbine admission valves, is motivated by hydraulic oil,
362
hence the high -pressure needed.
363
Hydraulic oil is also used to hold open the turbine stop valve during operation
364
and hold open the extraction line non -return valves during normal operation.
365
Hydraulic oil is employed to provide a relatively large force in response to a small signal from the control system.
366
For example, the servomechanism that we just mentioned is really a power amplifier that responds to a small movement and force of,
367
say, a few pounds from the governor's system
368
and turns this into a force of several tons to operate the turbine valves against the high -pressure steam.
369
In this simplified example shown here, the turbine steam control valve is adjusted by the position of the hydraulic servo piston.
370
This large system is controlled by the small pilot valve here.
371
Now, suppose the governor control system lifts the operating lever slightly.
372
As we can see, this will now allow high -pressure oil to enter the servo cylinder above the piston.
373
At the same time, it will allow oil below the piston to pass to the oil drain.
374
In response to this, the piston will be forced downwards, partially closing the control valve.
375
But look, this movement downward also moves the operating lever, and this moves the pilot valve downward, so closing off the servo cylinder,
376
which is now in a new position.
377
We'll be looking in much more detail at the turbine control system in the next module in this series.
378
For now, we're just looking at applications for hydraulic oil.
379
In many turbines, the same grade of oil is used for both applications,
380
so the hydraulic and lube oil systems are combined to utilize the same oil tank and the same pumps.
381
The main oil pump is mounted in the front end pedestal and is driven directly from the turbine shaft.
382
Diagrammatically, the scheme looks like this.
383
When the machine is in operation, the main oil pump here delivers oil at 250 psi.
384
This supplies the hydraulic oil system.
385
At the same time, it provides oil to the lube oil header at 50 psi through a reducing valve.
386
During startup and shutdown, a motor -driven high -pressure oil pump is used.
387
Again, this supplies both the hydraulic oil system and the lube oil system.
388
In this arrangement, this pump is known as the auxiliary oil pump since it is the main standby to the shaft -driven pump.
389
When the turbine is out of service and operating on turning gear, we still need to provide lubrication to the bearings.
390
However, in this situation, with hydraulic oil not required, it would be inefficient to run the large auxiliary oil pump.
391
Instead, a small pump is installed, known as the turning gear oil pump, and this provides sufficient oil for lubrication only.
392
And as before, there is a DC emergency pump
393
which will provide lubrication in the case that all AC service supply power is lost.
394
So we can see that there is in fact a hierarchy of oil pumps with automatic startup based on pressure readings.
395
If the high pressure oil pump fails and the pressure falls, the AC auxiliary oil pump will cut in automatically.
396
If the lube oil pressure falls, the turning gear oil pump starts up automatically.
397
And if this consequently fails, the DC oil pump will start.
398
As with all automatic devices, the pump auto start operations should be checked on all pumps regularly.
399
Make sure that you check out the details of your own lube oil and hydraulic oil systems.
400
You should be thoroughly familiar with the location of all pumps and controls for these pumps.
401
Now at this point, let's take a break.
402
And then we'll come back and take a look at vacuum equipment on the turbine.
403
For now, please switch off the tape and review this material in your workbook.
404
An important part of operating a condensing turbine installation is the maintenance of correct vacuum in the condenser.
405
Commonly, the condenser is located below the exhaust end of the turbine, but there are other configurations.
406
In the scheme shown here, the condenser is fitted directly at the tail end of the turbine on the same level.
407
Another arrangement, known as a Pannier condenser, consists of two vessels located at the same level, one on either side of the exhaust.
408
As we already pointed out in an earlier module, a vacuum is formed when steam exhausting from the turbine is cooled and condensed back into water.
409
The dramatic change in volume from steam to water leaves a large empty space, and as the condenser is a closed vessel,
410
the result is a vacuum.
411
The actual pressure in the steam space of the condenser, and correspondingly at the turbine exhaust, will be about 1 to 2 PSIA,
412
depending on actual local conditions.
413
The steam space in the condenser is filled with low -pressure steam, exhausted from the turbine,
414
which quickly turns to water droplets as it comes into contact with the outside surface of the cooling tubes.
415
Most condensers contain several thousand tubes about one inch in diameter, usually made of non -corrosive metals such as cupra nickel,
416
brass, and even stainless steel.
417
Cooling water passes through the inside of these tubes, while steam condenses on the outside of the tubes.
418
This so -called condensate then falls to the bottom of the condenser, where it is collected in a vessel known as the hot well.
419
From here, the condensate is removed by the condensate pump and circulated back to the system.
420
In order to condense steam into water, all of the latent heat must be removed.
421
That is, about 970 BTU per pound.
422
In order to achieve this, a very large quantity of cooling water is required.
423
For example, a 60 megawatt unit may require as much as 35 ,800 GPM of cooling water to pass through the condenser.
424
Such a large quantity of water cannot be supplied by a water treatment system.
425
Therefore, the condenser cooling water, or circulating water as it is known, is normally taken from a nearby river or lake or even the sea.
426
In some cases, a closed circuit system is installed using a cooling tower.
427
We'll be talking more about the actual circulating water system and its components later in this program.
428
For now, we're concerned with the condenser and other vacuum equipment.
429
In the arrangement shown here, the circulating water enters at one end of the condenser.
430
filling the inlet water box, then passes through the tubes into the outlet water box.
431
From here, the water circulates back to the system.
432
This particular arrangement is known as a single -pass system.
433
In many installations, a double -pass condenser is used.
434
Here, the water enters at the bottom, passes through the lower tubes, arrives at the far water box,
435
and then is circulated back through the upper set of tubes, exiting from the upper water box.
436
Over a period of time, the circulating water may leave some deposits inside the tubes.
437
The consequence of this is a reduction in heat transfer and a rise in the back pressure inside the condenser.
438
This results in a loss of efficiency and lower output from the turbine.
439
The circulating water may also deposit algae, muscles, and other marine life on the front of the tube plate,
440
reducing the flow of water through the tubes.
441
Again, the result is a loss in cooling and a consequent rise in back pressure.
442
Generally, the condenser needs to be cleaned manually from time to time, and in most cases, this entails shutting down the turbine.
443
There are, however, some machines which are designed to allow one half of the condenser to be cleaned, while the other half remains in service,
444
and the unit continues operating at reduced load.
445
In an attempt to maintain a clean condenser, chemical injection is carried out at some installations.
446
Adding a biocide to the circulating water can reduce or eliminate the growth of algae.
447
Sulfuric acid may also be added in some plants where a closed cycle cooling tower system is used.
448
The objective is to lower the pH slightly to about 6 .5 in an attempt to prevent scale forming inside the tubes.
449
Another chemical used on closed cycle systems acts as a dispersant with the aim of keeping solids in suspension
450
and preventing deposits from forming on the inside tube surface.
451
Many condensers are fitted with a siphon connection on top of the water box.
452
The objective of this vacuum connection is to ensure
453
that the water boxes remain completely full of water so that all of the cooling tubes remain effective.
454
But how could it be otherwise?
455
Well, the circulating water will likely contain air bubbles
456
which may be released at the top of the water box forming a large air pocket.
457
In time, as the air pocket increases, the level of the water at the top of the water box falls
458
and consequently there will be no water flow through some of the tubes.
459
The result of this reduction in heat exchange will be that the condenser is less effective and the turbine back pressure increases.
460
The siphon connection prevents this from happening by drawing off the air at the top of the water box
461
and piping this into a vacuum tank.
462
The vacuum in the tank is maintained at about 25 inches of mercury by small vacuum pumps that are intermittently operated.
463
A water level sensor in the water box operates a control valve on the siphon connection.
464
When the level falls below a set level, the valve opens and air is drawn out, allowing the water level to rise.
465
When the level raises to fill the water box, the control valve closes.
466
The problem of air accumulation may also occur inside the steam space of the condenser.
467
Remember that this area operates under a negative pressure, a vacuum.
468
Therefore, any leakage by valves,
469
piping, or flanges will allow air to leak into the steam space of the condenser instead of steam leaking out.
470
Also, some incondensable gases, such as oxygen and carbon dioxide, may be released from the steam as it condenses.
471
There is a tendency for these gases, plus any small amount of leakage air,
472
to accumulate inside the steam space and eventually cause the back pressure to rise, reducing turbine efficiency.
473
In order to remove air and gases from the steam space,
474
vacuum devices are fitted such as a steam ejector and a vacuum pump.
475
This air removal equipment is connected to a specific location in the condenser known as the air box.
476
In this area, additional cooling tubes are concentrated to ensure that the steam condenses and only air and gases are removed.
477
In many plants, the discharge from the vacuum equipment is monitored to provide a measure of air leakage into the condenser.
478
During normal operation, this air leakage should be quite small.
479
In fact, a good test of this during operation is to shut down the vacuum pump or steam ejector
480
and observe the rate at which the back pressure increases.
481
This should be quite slow, say one inch of mercury in about 30 minutes.
482
Compare this with the change which would take place if all of the circulating water flow were to cease,
483
perhaps due to a trip of the circulating water pumps.
484
In this case, with no condensing taking place at all, the back pressure would rise immediately and the turbine would have to be tripped.
485
In practice, this takes place automatically.
486
And we'll be discussing this when we look at protection devices in the next module.
487
So we can see that during normal operation, the vacuum equipment is intended to maintain the vacuum in the condenser not to create it.
488
However, we also depend upon the vacuum equipment to draw a vacuum before startup.
489
In this situation, before steam is admitted to the turbine, the condenser and the turbine are full of air.
490
In order to remove this air, the vacuum pump or steam ejector must be placed in service and so pull a vacuum inside the unit.
491
Let's see how the steam ejector works.
492
This functions on the principle of the Venturi nozzle like this.
493
When high velocity steam passes through this nozzle, it creates a vacuum at this convergent point.
494
This is the point which is connected to the air box in the condenser.
495
The air enters the nozzle and is mixed with the steam passing through.
496
On a startup ejector, also known as a hogging ejector, this mixture is discharged to atmosphere.
497
However, the requirement for air removal when the turbine is in service is much less.
498
Therefore, the on -load ejector uses smaller nozzles and has some heat and steam recovery.
499
As before, air is drawn from the condenser by the primary ejector,
500
and the air and steam mixture discharges into a heat exchanger to condense the steam.
501
The cooling medium is usually condensate, so all of the heat is retained within the cycle from the intercooler.
502
The air is now drawn into a second stage ejector, which is at quite low pressure, that is, a modest vacuum.
503
From here, the air and a small amount of steam is exhausted to atmosphere.
504
The creation and maintenance of vacuum in the condenser is an exceedingly important part of turbine operation,
505
and we'll be looking at this in more detail in the next module in this series
506
when we focus our attention on turbine operation and control.
507
Make sure that you learn all of the features of the condenser and vacuum equipment which is installed in your plant.

ดาวน์โหลดแอป

ทุกอย่างที่ต้องใช้เพื่อพูดได้คล่อง

AI ให้คะแนนการออกเสียงให้คะแนนทุกประโยค
ฝึก IPAเชี่ยวชาญทุกเสียง
คำศัพท์สร้างคลังคำของคุณ
เกมคำศัพท์เล่นไปเรียนไป
FOR YOU

วิดีโอแนะนำ

คำศัพท์และข้อสังเกตด้านการพูดสำหรับบทเรียนนี้

บทเรียนฝึกพูดนี้ใช้วิดีโอ “Steam Turbine Construction Operating Fundamentals” เป็นสื่อ คำที่ถูกพูดซ้ำบ่อยที่สุด: steam, turbine, pressure, oil, blade วิดีโอนี้มี 507 ประโยค และ 7674 คำ สำหรับฝึกพูดตาม ช่วงที่มีเสียงพูดยาว 52:50 ผู้พูดพูดด้วยความเร็วสม่ำเสมอ ประมาณ 145 คำต่อนาที เหมาะกับการฝึกพูดตาม มีเพียง 78% ของคำที่อยู่ใน 3,000 คำที่ใช้บ่อยที่สุดในภาษาอังกฤษ คำศัพท์จึงค่อนข้างยาก

คำศัพท์สำคัญในวิดีโอนี้

คำที่ควรเรียนรู้ 15 คำจากวิดีโอ พร้อมคำอ่านและความหมาย:

คำศัพท์คำอ่านความหมาย
turbine คำนาม/ˈtɜː.baɪn/กังหัน
blade คำนาม/bleɪd/ใบ, มีด
valve คำนาม/ˈvælv/วาล์ว, ลิ้น
cylinder คำนาม/ˈsɪləndɚ/ทรงกระบอก, กระบอก
vacuum คำนาม/ˈvæ.kjuːm/สุญญากาศ
pump คำนาม/pʌmp/เครื่องสูบลม, เครื่องสูบน้ำ
shaft คำนาม/ˈʃɑːft/เพลา, ทูบ
seal คำนาม/siːl/ลัญจกร
generator คำนาม/ˈdʒɛnəɹeɪtə(ɹ)/เครื่องกำเนิดไฟฟ้า, เครื่องปั่นไฟ
tube คำนาม/tuːb/หลอด
bearing คำนาม/ˈbɛɹɪŋ/ลูกปืน
rotate คำกริยา/ˈɹoʊ.teɪt/หมุน, หัน
velocity คำนาม/vəˈlɑsəti/ความเร็ว
module คำนาม/ˈmɑd͡ʒul/มอดูล, โมดูล
impulse คำนาม/ˈɪmpʌls/แรงกระตุ้น

กริยาวลีที่คุณจะได้ยิน

คำศัพท์ความหมาย
pick up คำกริยายก, หยิบ
switch off คำกริยาปิด, ดับ
come back คำกริยากลับมา
give up คำกริยายอมแพ้

ประโยคที่ควรฝึกพูดซ้ำ

ประโยคสั้น ๆ ที่สมบูรณ์จากวิดีโอ ซึ่งนำไปใช้ในบทสนทนาประจำวันได้:

  • Let's first examine impulse blading.
  • What do we mean by this?
  • Let's see how these are held in place.
  • Let's look at the lubricating oil system first.
  • Let's see how the steam ejector works.

ไวยากรณ์ในวิดีโอนี้

โครงสร้างที่ผู้พูดใช้บ่อยที่สุด พร้อมคำพูดจริงจากวิดีโอ:

โครงสร้างในวิดีโอ
Present perfect continuous have/has been + -ing — การกระทำที่เริ่มก่อนหน้านี้และยังดำเนินอยู่we've been studying · have been considering
Passive voice be + กริยาช่อง 3 — เน้นสิ่งที่เกิดขึ้น ไม่ใช่ผู้กระทำwill be dealt · be coupled · is achieved
Relative clauses who / which + อนุประโยค — ข้อมูลเพิ่มเติมเกี่ยวกับคนหรือสิ่งของfuels which are · bearings which are · seals, which are
Present perfect have/has + กริยาช่อง 3 — เหตุการณ์ในอดีตที่ยังเกี่ยวข้องกับปัจจุบันhave examined · has been · has lost

การออกเสียงที่ควรระวัง

ผู้พูดใช้รูปย่อและรูปลดเสียง 26 ครั้ง เช่น we'll, we're, we've ให้พูดแบบสั้นตามที่ได้ยิน

  • เสียง “th”: thrust /θɹʌst/, feather /ˈfɛðə/, thin /ˈθɪn/, labyrinth /ˈlæb.ə.ɹɪnθ/
  • เสียง “sh” และ “zh”: shaft /ˈʃɑːft/, stationary /ˈsteɪʃəˌnɛɹi/, efficiency /ɪˈfɪʃ.ən.si/, admission /ədˈmɪʃən/, shell /ʃɛl/
  • คำยาว — ลงเสียงหนักให้ถูกพยางค์: generator /ˈdʒɛnəɹeɪtə(ɹ)/, stationary /ˈsteɪʃəˌnɛɹi/, velocity /vəˈlɑsəti/, efficiency /ɪˈfɪʃ.ən.si/, consequently /ˈkɑnsɪˌkwɛntli/

เสียงที่คนไทยมักออกเสียงยาก:

  • เสียงท้ายคำ — ออกเสียงให้ครบ ไม่เปลี่ยนเป็นตัวสะกดแบบไทย: valve /ˈvælv/, seal /siːl/, module /ˈmɑd͡ʒul/, impulse /ˈɪmpʌls/, clearance /ˈklɪɚ.əns/
  • /v/ — ไม่ใช่ /w/ ให้ฟันบนแตะริมฝีปากล่าง: valve /ˈvælv/, vacuum /ˈvæ.kjuːm/, velocity /vəˈlɑsəti/, objective /ɒbˈd͡ʒɛk.tɪv/, vapor /ˈveɪpɚ/
  • /z/ — เสียงก้อง ไม่ใช่ /s/: exhaust /ɪɡˈzɔst/, exit /ˈɛɡzət/, auxiliary /ɔɡˈzɪl.(jə).ɹi/, examine /ɪɡˈzæmɪn/, physically /ˈfɪz.ɪ.kli/

วิธีฝึกกับวิดีโอนี้

  1. ฟังวิดีโอให้จบหนึ่งรอบโดยยังไม่ต้องพูด แล้วจดคำที่ยังไม่รู้จัก
  2. พูดตามทีละประโยคด้วยความเร็วปกติ ทำซ้ำแต่ละประโยคจนจังหวะของคุณตรงกับผู้พูด
  3. อัดเสียงตัวเองแล้วเทียบกับต้นฉบับ โดยสังเกตคำอย่าง turbine, blade, valve เป็นพิเศษ

เทคนิค Shadowing คืออะไร?

Shadowing เป็นเทคนิคการเรียนรู้ภาษาที่ได้รับการรับรองทางวิทยาศาสตร์ พัฒนาขึ้นสำหรับการฝึกนักแปลมืออาชีพ วิธีการนี้เรียบง่ายแต่ทรงพลัง: คุณฟังเสียงภาษาอังกฤษจากเจ้าของภาษาและพูดตามทันที — เหมือนเงาที่ตามผู้พูดด้วยช่วงเวลาห่าง 1-2 วินาที การวิจัยแสดงว่าเทคนิคนี้ปรับปรุงความแม่นยำในการออกเสียง ทำนองเสียง จังหวะ การเชื่อมเสียง การฟังเข้าใจ และความคล่องแคล่วในการพูดได้อย่างมีนัยสำคัญ

เทคนิค shadowing: อ่านคู่มือฉบับเต็มทีละขั้นตอน →