تدريب Shadowing: Learn Everyday Conversations for English At Work | Warehouse Conversations - تعلم التحدث بالإنجليزية مع YouTube

C1
Hi Nina, I wanted to talk about the recent issues we've had with inventory shortages.
⏸ متوقف مؤقتاً
89 جمل
إذا كانت الجمل قصيرة أو طويلة جدًا، انقر على Edit لتعديلها.
1
Hi Nina, I wanted to talk about the recent issues we've had with inventory shortages.
2
Last week, the resistor components were missing for three days and it halted line BS production.
3
I'm aware of that Alex.
4
The issue came from a delay in our supply chain.
5
Our vendor reported problems at customs and the components were stuck.
6
We need a more effective inventory control system.
7
We're relying too much on manual checks and it's leading to inaccurate stock levels.
8
I agree.
9
I've been researching automated inventory tracking systems.
10
They can help us monitor real-time inventory levels and generate shortage alerts.
11
That sounds promising.
12
But we also need to set minimum stock thresholds.
13
When we drop below a certain number,
14
it should trigger a restock request.
15
That can be programmed into the system.
16
Also, I propose we do weekly cycle counts to catch discrepancies earlier.
17
Good point.
18
We should also review the lead time from our suppliers.
19
Three days without resistors caused a backlog that's going to take a week to fix.
20
We'll renegotiate the delivery terms and add a clause for urgent shipments.
21
I'll also suggest keeping buffer stock for high priority components.
22
Let's make a list of the critical components and define what constitutes a shortage for each.
23
I'll prepare a draft and include a safety stock strategy.
24
We can review it with the procurement team.
25
Morning, Mike.
26
Do you have a minute?
27
Yeah, what's up?
28
We just got an email from Delta Circuits.
29
They're asking for an urgent shipment of 2000 PX 45 units.
30
They need it by this Friday.
31
Wait, this Friday?
32
That's insane.
33
That's what, four days?
34
Exactly, they're willing to pay extra for express delivery,
35
but we weren't scheduled to ship that batch until the 21st. Do we even have enough finished product?
36
Not yet, we have about 600 ready to go.
37
The rest are in different stages of production.
38
So it's not just a logistics issue,
39
we've got a production crunch too.
40
Right.
41
I checked with the line team earlier.
42
If we run night shifts and cut change over time,
43
we might hit 2000 by Thursday night.
44
That's tight.
45
What about testing and packaging?
46
We'll need to parallel those steps with production.
47
I'll need to coordinate testing as units come off the line.
48
Okay.
49
Let's assume you can hit the numbers.
50
Do you want me to look at express shipping options?
51
Yes.
52
They requested air freight, preferably DHL.
53
But if someone else can guarantee delivery by Friday evening, I'm open.
54
All right, DHL has one premium slot left,
55
pick up Friday 9 a.m., delivery by 6 p.m same day air.
56
Can they handle our volume?
57
They'll do it in two pallets.
58
Total cost is around $4,200.
59
All right, let me confirm with Delta.
60
Hold that slot if you can.
61
They won't hold it without booking.
62
Book it.
63
I'll get client confirmation ASAP.
64
Cool.
65
I'll finalize the booking and prep the airway bill.
66
Let's also prep the commercial invoice and packing list in advance.
67
If we finish boxing by Thursday,
68
we can load early Friday morning.
69
Yep.
70
I'll coordinate with warehouse on labels and pallet sizes.
71
Thanks.
72
Let's keep everything on track.
73
Bad news Anna.
74
DHL just emailed.
75
The Friday 9am slot is full.
76
We missed it by 15 minutes.
77
You're kidding.
78
Nope.
79
But UPS has an alternative,
80
830am pickup, same day air, $4600.
81
Book it.
82
No time to go back and forth.
83
Already on it.
84
I'll update the tracking link once it's active.
85
We're at 1,100 units packed.
86
Another 600 in QA, and the last batch is on the line now.
87
You think we'll hit 2,000 by Thursday?
88
If we keep running overtime, yes.
89
QA is the bottleneck now.

تنزيل التطبيق

تقييم بالذكاء الاصطناعي لكل جملة تنطقها

TRENDING

الأكثر شعبية

عن هذه الدرسة

في هذا الدرس، سوف تتعلم كيفية التعامل مع محادثات العمل اليومية المتعلقة بالمخازن. ستطبق ما تتعلمه من خلال محاكاة المحادثات التي جرت بين الموظفين حول مشاكل المخزون، مما سيساعدك على تحسين مهاراتك في ممارسة المحادثة الإنجليزية. من خلال التعرف على كيفية مناقشة القضايا المرتبطة بالشحن والإنتاج، ستكتسب القدرة على التفاوض وتحليل المشكلات بكفاءة.

المفردات والعبارات الرئيسية

  • نقص المخزون: حالة يكون فيها كميات معينة من المنتجات غير متوفرة.
  • نظام تتبع المخزون: أدوات أو تقنيات تستخدم لمراقبة مستويات المخزون بشكل آني.
  • حد أدنى للمخزون: الكمية الأدنى المطلوبة من منتج معين قبل الحاجة إلى إعادة الطلب.
  • البضائع العاجلة: الطلبات التي تتطلب شحنًا سريعًا.
  • اختبار وتجهيز: العمليات التي تجري بعد الإنتاج لضمان جودة المنتج.
  • العمليات الليلية: العمل في فترة الليل لتسريع الإنتاج.
  • فرز الأخطاء: التحليلات التي تهدف لاكتشاف الأخطاء أو الفجوات في الإنتاج.

نصائح للممارسة

لتحسين مهاراتك في ممارسة المحادثة الإنجليزية من خلال الفيديو، حاول اتباع أسلوب طريقة التظليل في الإنجليزية، أو ما يعرف بـ shadowspeak. استمع إلى المحادثات بتركيز، ثم قم بتكرار العبارات بنفس السرعة والنبرة. من المهم عدم ترك نفسك تتعثر في الكلمات، بل حاول أن تجعل صوتك واضحاً قدر الإمكان. يمكنك البدء بمقاطع قصيرة، وتدريجياً انتقل إلى المقاطع الأطول عند شعورك بالراحة.

تدرب على حركات الفم والتعبيرات المستخدمة في الفيديو، حيث أن أدوات shadowspeaks ستساعدك على تحسين نطقك. اختبر نفسك بإعادة المحادثات السابقة مع شريك دراستك أو سجل نفسك واستمع. ستساعدك ممارسة التظليل بانتظام على تعزيز الثقة في مهاراتك اللغوية!

ما هي تقنية التظليل الصوتي؟

التظليل الصوتي (Shadowing) تقنية تعلم لغة مدعومة علمياً، طُورت أصلاً لتدريب المترجمين الفوريين المحترفين. الطريقة بسيطة لكنها قوية: تستمع لصوت إنجليزي أصلي وتكرره فوراً بصوت عالٍ — كظل يتبع المتحدث بتأخير 1-2 ثانية. تُظهر الأبحاث تحسناً كبيراً في دقة النطق والتنغيم والإيقاع وربط الأصوات والاستماع والطلاقة.

اشترِ لنا قهوة