跟读练习: 4 NPI Tips Before You Move Into Mass Production - 通过视频学习英语口语
选择练习模式
每种模式都会打开全屏练习室。
80 句
如果句子过短或过长,请点击 Edit 进行调整。
1
Remember, and again, this is really all about setting expectations.
2
Working on your prototype is not a quality standard.
3
Define acceptance criteria in writing before you build mass production.
4
Yes, you can test and you can validate the prototype.
5
Yes, this is basically the direction I'm going to go in.
6
This is what it's going to look like.
7
Even rough colors.
8
OK, this is not your quality acceptance criteria.
9
OK, you really, really need to understand what that means.
10
And it is very different to what you're looking at from a prototype point of view.
11
OK, I'm just trying to set your expectations of what you should be doing.
12
OK, let me pick another one.
13
Let's look at this MPI.
14
okay if you haven't got a structured mpi process in place with controlled processes with
15
phase gates let's say you need to make sure you have you need to make sure
16
that you're working with a contract manufacturer that has a solid robust mpi process in place with phase gates
17
and they are strong enough in order to say mr customer
18
we are not ready to move into the next phase because instead of being, oh yeah, sure, no problems, we're moving, no, no problems.
19
And then all of a sudden, we've got 10,000 units with 10,000 problems.
20
Really have that MPI process in place.
21
One way can check, do your audit.
22
Yes. And
23
if you're thinking what does the structured mpi process look like
24
well we do have a graphic form of the mpi process
25
that we follow that you might like to use as reference i think you've got another couple of pro tips
26
okay yeah if we've got time yeah no problems track every unit in your validation build okay Now,
27
your validation build, again, we're building some just in the next room alone.
28
Okay, I've got building 10 units.
29
Each one of these has got its own serial number on.
30
Guess what?
31
It's 1 to 10.
32
Okay, but we know exactly what is being tested, when it's being tested, who's testing it, what the results are, and what that unit number is.
33
Okay, and each one of those has its own variations within the test output.
34
okay now what we're doing here is we're building 10 now this is like the dbt okay
35
or tooling validation okay so we're not quite at production yet
36
but we have identified some small areas
37
that need to be improved in order to that product to go into mass production and be built reliably consistently and robustly.
38
Okay, so track.
39
Don't just like get 10 prototypes built.
40
Yeah, they all work, but this one was like a little bit off.
41
Let me send them all back to you.
42
And you didn't actually identify which one was wrong.
43
Then we're going to get that back or your contract manufacturer or your developer's going to get back and say, I'm going to make the assumption that it's this one
44
because it feels different to me as opposed to you didn't mark it up okay
45
so serial numbers is really important and particularly on the unseen aspects software
46
and firmware okay super super important software and firm
47
and have your tracking or serial numbers encoded in okay super important particularly
48
when it comes to that debugging
49
or cleaning up process okay there you go it's another pro
50
tip um moving factory i've talked about this before i'll talk
51
about again make sure you understand what the factory you're working
52
with has everything in place with respect to qualifying a new
53
production run now prototypes to mass production okay that's sort of understandable
54
but what if you're going from mass production to mass production now we we have those scenarios as well
55
and we will not take a product on until we've done a validation
56
or a pilot run even if
57
that is a mature product okay why we've got a different
58
set of people okay it's a different set of eyes different set of hands actually putting
59
that product together okay so this is what you need to insist
60
that if you're transferring a product from one factory to another
61
or one contract manufacturer to another contract manufacturer you insist
62
that they do a small pilot run okay in order to
63
prove the new process is correct maybe it's the old process
64
but there's a new interpretation of
65
that okay then you can actually understand what your failure rates are what your yield rates are
66
once you understand that you can do your quality analysis to your eight days
67
and all the rest of it but the key thing is you don't just transfer
68
and say well i was building 10 000 last month
69
and this supplier and everything is perfectly okay i'm going to transfer
70
and expect the same okay it doesn't happen okay it's almost like starting from scratch
71
but you know at least have
72
that pilot run in there okay now a lot of people transfer
73
because of cost because of quality issues because of of personnel issues.
74
They're all valid, all valid reasons, okay?
75
But put cost back on the table if you are transferring 10,000 bill per month,
76
10,000 bill per month without that trial, okay?
77
The cost of failure of 20%, for example, is huge, absolutely huge.
78
All you have to do is like scale back for a little while
79
do that pilot run make sure everything is okay then you can ramp back up okay
80
so if you're doing that factory transfer be very careful
📺 同频道
✨ 推荐视频
本课的词汇与口语要点
这段视频共有 80 个句子、917 个单词可供跟读。 讲话部分时长为 6:02。 说话人语速自然,每分钟约 152 个词,接近日常对话。 88% 的单词属于英语最常用的 3,000 词,其余的词建议在练习前先学一下。
视频中的重点词汇
视频中 15 个值得学习的单词,附发音和释义:
| 单词 | 发音 | 释义 |
|---|---|---|
| prototype 名词 | /ˈpɹəʊtətaɪp/ | 原型, 雏形 |
| manufacturer 名词 | /ˌmænjʊˈfæktʃəɹə/ | 製作者 /制作者, 製造者 /制造者 |
| validation 名词 | /ˌvæl.əˈdeɪ.ʃən/ | 肯定, 情緒價值 /情绪价值 |
| gate 名词 | /ˈɡeɪ̯t/ | 門口 /门口, 門 /门 |
| valid 形容词 | /ˈvælɪd/ | 有效的 |
| insist 动词 | /ɪnˈsɪst/ | 堅持 /坚持 |
| expectation 名词 | /ˌɛk.spɛkˈteɪ.ʃən/ | 等待 |
| output 名词 | /ˈaʊtpʊt/ | 輸出 /输出 |
| aspect 名词 | /ˈæspɛkt/ | 方面 |
| sudden 形容词 | /ˈsʌd.ən/ | 突然, 急劇 /急剧 |
| define 动词 | /dɪˈfaɪn/ | 界定 |
| mature 形容词 | /məˈt͡ʃʊ(ə)ɹ/ | 成熟, 成長 /成长 |
| graphic 形容词 | /ˈɡɹæfɪk/ | 圖形的 /图形的 |
| interpretation 名词 | /ɪnˌtɜːpɹəˈteɪʃən/ | 翻譯 /翻译 |
| scenario 名词 | /sɪˈnɛəɹioʊ/ | 腳本 /脚本, 場景 /场景 |
视频中的语法
说话人最常用的结构,并附上视频中的原话:
| 结构 | 视频中的用法 |
|---|---|
| 现在完成时 have/has + 过去分词 — 过去发生但与现在仍有关联的事 | have identified · i've talked · we've done |
| 被动语态 be + 过去分词 — 强调发生了什么,而不是谁做的 | being tested · be improved |
需要注意的发音
说话人用了 32 次缩略和弱读形式,例如 you're, we're, I'm。请按听到的简短形式来说。
- “sh” 和 “zh” 音: validation /ˌvæl.əˈdeɪ.ʃən/, expectation /ˌɛk.spɛkˈteɪ.ʃən/, interpretation /ɪnˌtɜːpɹəˈteɪʃən/, variation /ˌvɛəɹiˈeɪʃn̩/, assumption /əˈsʌm(p).ʃ(ə)n/
- 长单词——注意重音位置: manufacturer /ˌmænjʊˈfæktʃəɹə/, validation /ˌvæl.əˈdeɪ.ʃən/, expectation /ˌɛk.spɛkˈteɪ.ʃən/, consistently /kənˈsɪstəntli/, interpretation /ɪnˌtɜːpɹəˈteɪʃən/
如何用这段视频练习
- 先完整听一遍视频,不要开口,记下不认识的单词。
- 先用 0.75 倍速逐句跟读,熟练之后再回到正常速度。
- 录下自己的声音并与原声对比,特别注意 prototype, manufacturer, validation 这类单词。
什么是跟读法?
跟读法 (Shadowing) 是一种有科学依据的语言学习技巧,最初开发用于专业口译员的培训,并由多语言者Alexander Arguelles博士普及。这个方法简单而强大:您在听英语母语原声的同时立即大声重复——就像是一个延迟1-2秒紧跟说话者的影子。与被动听力或语法练习不同,跟读法强迫您的大脑和口腔肌肉同时处理并模仿真实的讲话模式。研究表明它能显着提高发音准确性,语调,节奏,连读,听力理解和口语流利度——使其成为雅思口语备考和真实英语交流最有效的方法之一。





























