1
Remember, and again, this is really all about setting expectations.
2
Working on your prototype is not a quality standard.
3
Define acceptance criteria in writing before you build mass production.
4
Yes, you can test and you can validate the prototype.
5
Yes, this is basically the direction I'm going to go in.
6
This is what it's going to look like.
7
Even rough colors.
8
OK, this is not your quality acceptance criteria.
9
OK, you really, really need to understand what that means.
10
And it is very different to what you're looking at from a prototype point of view.
11
OK, I'm just trying to set your expectations of what you should be doing.
12
OK, let me pick another one.
13
Let's look at this MPI.
14
okay if you haven't got a structured mpi process in place with controlled processes with
15
phase gates let's say you need to make sure you have you need to make sure
16
that you're working with a contract manufacturer that has a solid robust mpi process in place with phase gates
17
and they are strong enough in order to say mr customer
18
we are not ready to move into the next phase because instead of being, oh yeah, sure, no problems, we're moving, no, no problems.
19
And then all of a sudden, we've got 10,000 units with 10,000 problems.
20
Really have that MPI process in place.
21
One way can check, do your audit.
22
Yes. And
23
if you're thinking what does the structured mpi process look like
24
well we do have a graphic form of the mpi process
25
that we follow that you might like to use as reference i think you've got another couple of pro tips
26
okay yeah if we've got time yeah no problems track every unit in your validation build okay Now,
27
your validation build, again, we're building some just in the next room alone.
28
Okay, I've got building 10 units.
29
Each one of these has got its own serial number on.
30
Guess what?
31
It's 1 to 10.
32
Okay, but we know exactly what is being tested, when it's being tested, who's testing it, what the results are, and what that unit number is.
33
Okay, and each one of those has its own variations within the test output.
34
okay now what we're doing here is we're building 10 now this is like the dbt okay
35
or tooling validation okay so we're not quite at production yet
36
but we have identified some small areas
37
that need to be improved in order to that product to go into mass production and be built reliably consistently and robustly.
38
Okay, so track.
39
Don't just like get 10 prototypes built.
40
Yeah, they all work, but this one was like a little bit off.
41
Let me send them all back to you.
42
And you didn't actually identify which one was wrong.
43
Then we're going to get that back or your contract manufacturer or your developer's going to get back and say, I'm going to make the assumption that it's this one
44
because it feels different to me as opposed to you didn't mark it up okay
45
so serial numbers is really important and particularly on the unseen aspects software
46
and firmware okay super super important software and firm
47
and have your tracking or serial numbers encoded in okay super important particularly
48
when it comes to that debugging
49
or cleaning up process okay there you go it's another pro
50
tip um moving factory i've talked about this before i'll talk
51
about again make sure you understand what the factory you're working
52
with has everything in place with respect to qualifying a new
53
production run now prototypes to mass production okay that's sort of understandable
54
but what if you're going from mass production to mass production now we we have those scenarios as well
55
and we will not take a product on until we've done a validation
56
or a pilot run even if
57
that is a mature product okay why we've got a different
58
set of people okay it's a different set of eyes different set of hands actually putting
59
that product together okay so this is what you need to insist
60
that if you're transferring a product from one factory to another
61
or one contract manufacturer to another contract manufacturer you insist
62
that they do a small pilot run okay in order to
63
prove the new process is correct maybe it's the old process
64
but there's a new interpretation of
65
that okay then you can actually understand what your failure rates are what your yield rates are
66
once you understand that you can do your quality analysis to your eight days
67
and all the rest of it but the key thing is you don't just transfer
68
and say well i was building 10 000 last month
69
and this supplier and everything is perfectly okay i'm going to transfer
70
and expect the same okay it doesn't happen okay it's almost like starting from scratch
71
but you know at least have
72
that pilot run in there okay now a lot of people transfer
73
because of cost because of quality issues because of of personnel issues.
74
They're all valid, all valid reasons, okay?
75
But put cost back on the table if you are transferring 10,000 bill per month,
76
10,000 bill per month without that trial, okay?
77
The cost of failure of 20%, for example, is huge, absolutely huge.
78
All you have to do is like scale back for a little while
79
do that pilot run make sure everything is okay then you can ramp back up okay
80
so if you're doing that factory transfer be very careful

このレッスンの語彙とスピーキングのポイント

この動画には、シャドーイング用の文が80文、単語が917語あります。 音声の長さは6:02です。 話す速さは1分あたり約152語で、日常会話に近い自然なペースです。 単語の88%は英語の頻出3,000語に含まれます。残りは練習の前に確認しておきましょう。

この動画の重要語彙

動画に出てくる覚えておきたい単語15語を、発音と意味つきで紹介します。

単語発音意味
prototype 名詞/ˈpɹəʊtətaɪp/プロトタイプ, 原型
manufacturer 名詞/ˌmænjʊˈfæktʃəɹə/メーカー, 製造業者
gate 名詞/ˈɡeɪ̯t/門, 大門
valid 形容詞/ˈvælɪd/有効な
acceptance 名詞/əkˈsɛp.təns/受け入れ
insist 動詞/ɪnˈsɪst/主張する
expectation 名詞/ˌɛk.spɛkˈteɪ.ʃən/期待, 予想
output 名詞/ˈaʊtpʊt/出力
aspect 名詞/ˈæspɛkt/様相
sudden 形容詞/ˈsʌd.ən/突然の
mature 形容詞/məˈt͡ʃʊ(ə)ɹ/成熟, 成熟した
graphic 形容詞/ˈɡɹæfɪk/描写的, 鮮明な
interpretation 名詞/ɪnˌtɜːpɹəˈteɪʃən/通訳
scenario 名詞/sɪˈnɛəɹioʊ/脚本, 台本
scratch 動詞/skɹæt͡ʃ/引っ掻く

動画に出てくる句動詞

単語意味
clean up 動詞掃除する

この動画の文法

話し手がよく使っている文型を、動画の実際の表現とともに紹介します。

文型動画での表現
現在完了形 have/has + 過去分詞 — 過去の出来事が今も関係しているhave identified · i've talked · we've done
受動態 be + 過去分詞 — 誰がするかより、何が起きるかに焦点を当てるbeing tested · be improved

注意したい発音

話し手はyou're, we're, I'mなど、短縮形や弱形を32回使っています。聞こえたとおりの短い形で発音しましょう。

  • 「sh」と「zh」の音: validation /ˌvæl.əˈdeɪ.ʃən/, expectation /ˌɛk.spɛkˈteɪ.ʃən/, interpretation /ɪnˌtɜːpɹəˈteɪʃən/, variation /ˌvɛəɹiˈeɪʃn̩/, assumption /əˈsʌm(p).ʃ(ə)n/
  • 長い単語(アクセントの位置に注意): manufacturer /ˌmænjʊˈfæktʃəɹə/, validation /ˌvæl.əˈdeɪ.ʃən/, expectation /ˌɛk.spɛkˈteɪ.ʃən/, consistently /kənˈsɪstəntli/, interpretation /ɪnˌtɜːpɹəˈteɪʃən/

この動画での練習方法

  1. まず声を出さずに動画を最後まで聞き、知らない単語をメモします。
  2. まず0.75倍速で一文ずつシャドーイングし、慣れてきたら通常の速度に戻します。
  3. 自分の声を録音して元の音声と比べます。prototype, manufacturer, gateなどの単語に特に注意しましょう。

シャドーイングとは?英語上達に効果的な理由

シャドーイング(Shadowing)は、もともとプロの通訳者養成プログラムで開発された言語学習法で、多言語習得者として知られるDr. Alexander Arguelles によって広く普及されました。方法はシンプルですが非常に効果的:ネイティブスピーカーの英語を聞きながら、1〜2秒の遅延で声に出してすぐに繰り返す——まるで「影(shadow)」のように話者を追いかけます。文法ドリルや受動的なリスニングと異なり、シャドーイングは脳と口の筋肉が同時にリアルタイムで英語を処理・再現することを強制します。研究により、発音精度、抑揚、リズム、連音、リスニング力、そして会話の流暢さが大幅に向上することが確認されています。IELTSスピーキング対策や自然な英語コミュニケーションを目指す方に特におすすめです。

シャドーイングのやり方: ステップ別の完全ガイドを読む →