1
Thanks for joining at short notice. I'm afraid we've run into a problem with the launch.
谢谢你们临时赶过来。恐怕我们的发布遇到问题了。
2
Already? We're only six weeks away from the launch date!
这么快就出事了?离发布只剩六周了!
3
I know. Our supplier told us yesterday that the sensors would be three weeks late.
我知道。供应商昨天告诉我们,传感器要晚三周到。
4
Three weeks? They'd promised us delivery by the end of this month!
三周?他们之前答应这个月底前交货的!
5
They had. Apparently, a fire at one of their factories held up production.
是答应过。听说他们一家工厂失火,生产被耽误了。
6
They must have known for days. Why didn't they tell us sooner?
他们肯定好几天前就知道了。为什么不早点告诉我们?
7
So we're falling behind schedule. Is there any way to catch up?
所以我们进度落后了。有没有办法赶上?
8
If we found a second supplier this week, we might just make it.
如果这周能找到第二家供应商,也许刚好来得及。
9
But even then, the new parts would need two weeks of testing.
但即便如此,新零件也需要两周测试。
10
What about the software? Is that on track, at least?
那软件呢?至少软件进度正常吧?
11
Yes, it's almost finished. That part has been going really well.
是的,快完成了。那部分一直很顺利。
12
Okay, let's come up with a plan. As far as I can see, we have two options.
好,我们来想个方案。在我看来,我们有两个选择。
13
Either we push the launch back to March, or we cut a feature.
要么把发布推迟到三月,要么砍掉一项功能。
14
If we put off the launch, we'll miss the spring trade fair.
如果推迟发布,我们就会错过春季展会。
15
The stand has already been paid for, and the press has been invited!
展位钱已经付了,媒体也都请好了!
16
Which feature were you thinking of cutting?
你打算砍掉哪项功能?
17
The air-quality sensor. It's the only one that depends on the late parts.
空气质量传感器。只有它依赖那批晚到的零件。
18
Customers might be disappointed. It was in all our early adverts.
客户可能会失望。我们早期的广告里都有它。
19
True, but we always called it a bonus feature, not a main one.
没错,但我们一直说它是附加功能,不是主要功能。
20
Actually, we could turn it into a free upgrade later in the year!
其实,我们可以把它变成今年晚些时候的免费升级!
21
I like that. Early buyers could have the sensor sent to them for free.
我喜欢这个主意。早期买家可以免费收到传感器。
22
That would work. The design already leaves room for it.
这行得通。设计上本来就留了位置。
23
Right. I'll take this to the directors this afternoon.
好。今天下午我把这个提交给董事们。
24
Sam, could you still look into a backup supplier, just in case?
Sam,你还是查一下备用供应商吧,以防万一?
25
Sure. I'll sort it out and report back by Friday.
没问题。我来处理,周五前给你回复。
26
And I'll rewrite the launch emails, so we don't promise too much.
我来重写发布邮件,免得我们承诺过头。
27
Thanks, both of you. We'll get through this together.
谢谢你们俩。我们一起渡过这一关。

下载应用

流利口语所需的一切

AI 发音评分逐句打分
音标练习掌握每个音
词汇学习建立你的词库
词汇游戏边玩边学
课程

TOEIC Listening Practice

第3集,共5集

同频道

FOR YOU

推荐视频

本课的词汇与口语要点

这节 B2 级别的口语课以视频“TOEIC Listening Practice: A Product Launch That Fell Behind Schedule”为素材。 视频中反复出现的词有:launch, supplier, sensor, feature。 这段视频共有 27 个句子、325 个单词可供跟读。 讲话部分时长为 2:00。 说话人语速自然,每分钟约 163 个词,接近日常对话。 89% 的单词属于英语最常用的 3,000 词,词汇容易理解。 全部 27 个句子中有 8 个是问句,适合练习疑问语调和简短回答。

视频中的重点词汇

视频中最难的 10 个单词,附发音和释义:

单词发音释义
sensor 名词/ˈsɛn.sɚ/傳感器 /传感器
supplier 名词/səˈplaɪə/供應商 /供应商, 供應者 /供应者
bonus 名词/ˈbəʊ.nəs/額外收獲 /额外收获
disappointed 形容词/ˌdɪsəˈpɔɪnɪd/敗興 /败兴, 失望
invite 动词/ɪnˈvaɪt/邀請 /邀请, 請 /请
leaf 名词/lif/еезы, еер
backup 名词/ˈbækˌʌp/備份 /备份
depend 动词/dɪˈpɛnd/信任, 信賴 /信赖
buyer 名词/ˈbaɪ.əɹ/買主 /买主, 購買人 /购买人
rewrite 动词/ɹiˈɹaɪt/重寫 /重写

视频中出现的短语动词

单词发音释义
come up with 动词想出, 提出
fall behind 动词遲到 /迟到
get through 动词/ɡɛt ˈθɹu/度過 /度过
put off 动词推遲 /推迟, 順延 /顺延

值得反复跟读的句子

视频中简短而完整的句子,可以直接用在日常对话里:

  • We're only six weeks away from the launch date!
  • Why didn't they tell us sooner?
  • Which feature were you thinking of cutting?
  • I'll take this to the directors this afternoon.
  • Sam, could you still look into a backup supplier, just in case?

需要注意的发音

说话人用了 12 次缩略和弱读形式,例如 I'll, we'll, we're。请按听到的简短形式来说。

中文母语者容易读错的音:

  • /v/ — 不要读成 /w/,上齿轻触下唇: invite /ɪnˈvaɪt/, advert /ædvˈɝt/
  • 词尾辅音 — 要读清楚,后面不要加元音: bonus /ˈbəʊ.nəs/, disappointed /ˌdɪsəˈpɔɪnɪd/, invite /ɪnˈvaɪt/, upgrade /əpˈɡɹeɪd/, leaf /lif/
  • /æ/ — 嘴张大,不要读成 /e/: backup /ˈbækˌʌp/, advert /ædvˈɝt/

如何用这段视频练习

  1. 先完整听一遍视频,不要开口,记下不认识的单词。
  2. 先用 0.75 倍速逐句跟读,熟练之后再回到正常速度。
  3. 录下自己的声音并与原声对比,特别注意 sensor, supplier, bonus 这类单词。

什么是跟读法?

跟读法 (Shadowing) 是一种有科学依据的语言学习技巧,最初开发用于专业口译员的培训,并由多语言者Alexander Arguelles博士普及。这个方法简单而强大:您在听英语母语原声的同时立即大声重复——就像是一个延迟1-2秒紧跟说话者的影子。与被动听力或语法练习不同,跟读法强迫您的大脑和口腔肌肉同时处理并模仿真实的讲话模式。研究表明它能显着提高发音准确性,语调,节奏,连读,听力理解和口语流利度——使其成为雅思口语备考和真实英语交流最有效的方法之一。

影子跟读法: 阅读完整分步指南 →