1
What is BIM coordination?
2
The definition of the word coordination is the organization of the different elements of a complex activity
3
so as to enable them to work together effectively.
4
The complex activity we are going to discuss here is the management of information related to buildings or infrastructure or BIM, building information modeling.
5
Information management or BIM coordination, when the information relates to buildings or infrastructure, is not a job title or a specific role.
6
Information management or BIM coordination is a function that everyone that is involved in the planning,
7
design, construction and operations of buildings or infrastructure has to participate in.
8
That is because every person and every discipline is involved with information.
9
You need information in order to do your job
10
and in doing your job you are probably producing or providing information that others will need to do the job.
11
If you are engaged in the planning, design, construction or operations of buildings or infrastructure, then you are involved in the communication or exchange of information,
12
which is the function of information management or BIM coordination.
13
So whether you are a client representative, architect, engineer, contractor, project manager, cost manager, design manager, procurement specialist,
14
safety manager, quality manager, environmental manager, facilities manager, specialist contractor, fabricator,
15
building product supplier, etc. You are involved in the function of information management
16
or BIM coordination since we are talking specifically about information management of buildings and infrastructure as opposed to general information management.
17
The confusion has arisen because some people believe incorrectly that BIM is only about the production of 3D models,
18
and therefore BIM coordination is just about coordinating those 3D models, or what is called clash detection.
19
But that is a very limited view of BIM and BIM coordination.
20
The international standard ISO 19650 has a far wider definition of BIM,
21
which includes all information that describe the physical and functional aspect of buildings and infrastructure.
22
This includes 3D models, geometric data,
23
alphanumeric data, and documentation, all managed in a common data environment CDE.
24
In that definition of BIM every person or discipline
25
that either needs information or who provides information has to engage with the management function of the CDE process.
26
Of course there are still hierarchies of management within the function
27
of information management from the client owner employer appointing party all the way through to the people who ultimately produce
28
or provide the information, the BIM authors.
29
There needs to be a information manager within each organization that is participating in a project, contributing to a specific task or discipline of work.
30
These are called task information managers.
31
They take responsibility for the information their own organization produces and approve it for sharing in the CDE.
32
Then there is a information manager who takes responsibility for a delivery team, a group of organizations in a specific phase or stage.
33
For example, this could be the lead designer for the design delivery team
34
or the main contractor for the construction delivery team or the facilities manager for the operations delivery team.
35
In each case, they are the lead appointed party responsible for the delivery of that phase
36
and they need an information manager who will liaise with the
37
other individual task information managers for the overall coordination of information for that phase or stage.
38
Of course, the client, owner, employer, appointing party also needs to have their own information manager
39
who will ultimately receive the information from the delivery team will need to check,
40
approve and accept that information so that it is authorized for use by others published in the CDE Common Data Environment.
41
This diagram describes the function of information management and the flow of information.
42
The requirements for information flow from the appointing party down in
43
the diagram through the hierarchy to the BIM authors who will produce the information.
44
The information flows back up the hierarchy in the CDE being checked and accepted at each stage.
45
Requirements also flow from right to left in the diagram.
46
In other words, the operations team should let the construction team know what they will need to perform the job,
47
and the construction team should let the design team know what they will need to perform the job.
48
The information flows from left to right to meet those requirements.
49
So you can see that information management is not the job or role of one person.
50
It is a function that is spread across all roles and disciplines who engage with the information.
51
Any project team
52
that thinks you only need to hire one BIM coordinator for
53
the project to manage everything has no idea how information management works.
54
Since the management of information relates specifically to buildings
55
and infrastructure involves the organization of the different elements of a complex activity so as to enable them to work together effectively.
56
This is by definition BIM coordination.
57
Thank you.

ऐप डाउनलोड करें

धाराप्रवाह बोलने के लिए ज़रूरी सब कुछ

AI उच्चारण स्कोरहर वाक्य का स्कोर
IPA अभ्यासहर ध्वनि में महारत
शब्दावलीअपना शब्द भंडार बनाएँ
शब्द गेमखेलते हुए सीखें
QR स्कैन करें
QR स्कैन करें
FOR YOU

अनुशंसित वीडियो

इस पाठ की शब्दावली और बोलने के सुझाव

यह स्पीकिंग पाठ वीडियो “What is BIMCoordination?” पर आधारित है। सबसे ज़्यादा दोहराए गए शब्द ये हैं: Bim, manager, management, coordination, infrastructure। इस वीडियो में शैडोइंग के लिए 57 वाक्य और 811 शब्द हैं। बोला गया हिस्सा 5:17 लंबा है। वक्ता लगभग 153 शब्द प्रति मिनट की स्वाभाविक गति से बोलता है, जो रोज़मर्रा की बातचीत के करीब है। 85% शब्द अंग्रेज़ी के 3,000 सबसे आम शब्दों में से हैं; बाकी शब्द अभ्यास से पहले देख लेना अच्छा रहेगा।

इस वीडियो की मुख्य शब्दावली

वीडियो के 15 सीखने लायक शब्द, उच्चारण और अर्थ के साथ:

शब्दउच्चारणअर्थ
coordination संज्ञा/kəʊˌɔːdɪˈneɪʃən/समन्वय, सामंजस्य
infrastructure संज्ञा/ˈɪnfɹəˌstɹʌkt͡ʃə/अवसंरचना
discipline संज्ञा/ˈdɪsəplɪn/अनुशासन
appoint क्रिया/əˈpɔɪnt/नियुक्त करना
requirement संज्ञा/ɹɪˈkwaɪɹmənt/आवश्यकता, अनिवार्यता
diagram संज्ञा/ˈdaɪ.ə.ɡɹæm/आलेख, मापचित्र
hierarchy संज्ञा/ˈhaɪ.ə.ɹɑː(ɹ).ki/पदानुक्रम, अनुक्रम
element संज्ञा/ˈɛləmənt/तत्त्व
participate क्रिया/pɑːˈtɪs.ɪ.peɪt/भाग लेना, हिस्सा लेना
specialist संज्ञा/ˈspɛʃəlɪst/विशेषज्ञ
employer संज्ञा/ɪmˈplɔɪə/नियोक्ता, मालिक
approve क्रिया/əˈpɹuːv/अनुमोदन करना
designer संज्ञा/dɪˈzaɪnɚ/डिज़ाइनर
aspect संज्ञा/ˈæspɛkt/पक्ष
hire क्रिया/ˈhaɪɹ/नियुक्त करना

इस वीडियो का व्याकरण

वक्ता जिन संरचनाओं का सबसे अधिक प्रयोग करता है, वीडियो के असली शब्दों के साथ:

संरचनावीडियो में
Passive voice be + past participle — ज़ोर इस पर कि क्या होता है, न कि कौन करता हैis involved · are involved · is called
Relative clauses who / which + उपवाक्य — व्यक्ति या वस्तु के बारे में अतिरिक्त जानकारीeveryone that is · people who ultimately

ध्यान देने योग्य उच्चारण

  • “sh” और “zh” की ध्वनियाँ: coordination /kəʊˌɔːdɪˈneɪʃən/, specialist /ˈspɛʃəlɪst/, confusion /kənˈfjuːʒən/, detection /dɪˈtɛk.ʃən/, clash /ˈklæʃ/
  • लंबे शब्द — बलाघात सही रखें: coordination /kəʊˌɔːdɪˈneɪʃən/, infrastructure /ˈɪnfɹəˌstɹʌkt͡ʃə/, hierarchy /ˈhaɪ.ə.ɹɑː(ɹ).ki/, participate /pɑːˈtɪs.ɪ.peɪt/, documentation /ˌdɑkjəmɛnˈteɪʃən/

हिंदी भाषियों के लिए मुश्किल ध्वनियाँ:

  • /v/ और /w/ का फ़र्क़ — /v/ में ऊपर के दाँत निचले होंठ को छूते हैं, /w/ में होंठ गोल होते हैं: requirement /ɹɪˈkwaɪɹmənt/, approve /əˈpɹuːv/, involve /ɪnˈvɑlv/
  • /z/ — इसे “ज” (/dʒ/) न बनाएँ: designer /dɪˈzaɪnɚ/, oppose /əˈpoʊz/, arise /əˈɹaɪz/, authorize /ˈɔθəɹaɪz/, liaise /liːˈeɪz/
  • /æ/ — “ऐ” से ज़्यादा खुला: contractor /ˈkɒnˌtɹæk.tə(ɹ)/, diagram /ˈdaɪ.ə.ɡɹæm/, aspect /ˈæspɛkt/, clash /ˈklæʃ/, alphanumeric /ˌæl.fə.n(j)uːˈmɛ.ɹɪk/

इस वीडियो से अभ्यास कैसे करें

  1. पहले बिना बोले पूरा वीडियो एक बार सुनें और जो शब्द नहीं आते उन्हें लिख लें।
  2. 0.75× गति से शुरू करें, एक-एक वाक्य की शैडोइंग करें, और सहज लगने पर सामान्य गति पर लौटें।
  3. अपनी आवाज़ रिकॉर्ड करें और मूल से तुलना करें, ख़ासकर coordination, infrastructure, discipline जैसे शब्दों पर ध्यान दें।

शैडोइंग तकनीक क्या है?

शैडोइंग (Shadowing) एक विज्ञान-समर्थित भाषा सीखने की तकनीक है जो मूल रूप से पेशेवर दुभाषिया प्रशिक्षण के लिए विकसित की गई थी। विधि सरल लेकिन शक्तिशाली है: आप मूल अंग्रेज़ी ऑडियो सुनते हैं और तुरंत इसे ज़ोर से दोहराते हैं — जैसे वक्ता की छाया 1-2 सेकंड की देरी से। शोध से पता चलता है कि यह उच्चारण सटीकता, स्वर, लय, जुड़ी हुई ध्वनियाँ, सुनने की समझ और बोलने की प्रवाहशीलता में काफ़ी सुधार करता है।

शैडोइंग तकनीक: पूरी चरण-दर-चरण गाइड पढ़ें →