跟讀練習: What is BIMCoordination? - 通過影片學習英語口語
選擇練習模式
每種模式都會開啟全屏練習室。
57 句
如果句子過短或過長,請點選 Edit 進行調整。
1
What is BIM coordination?
2
The definition of the word coordination is the organization of the different elements of a complex activity
3
so as to enable them to work together effectively.
4
The complex activity we are going to discuss here is the management of information related to buildings or infrastructure or BIM, building information modeling.
5
Information management or BIM coordination, when the information relates to buildings or infrastructure, is not a job title or a specific role.
6
Information management or BIM coordination is a function that everyone that is involved in the planning,
7
design, construction and operations of buildings or infrastructure has to participate in.
8
That is because every person and every discipline is involved with information.
9
You need information in order to do your job
10
and in doing your job you are probably producing or providing information that others will need to do the job.
11
If you are engaged in the planning, design, construction or operations of buildings or infrastructure, then you are involved in the communication or exchange of information,
12
which is the function of information management or BIM coordination.
13
So whether you are a client representative, architect, engineer, contractor, project manager, cost manager, design manager, procurement specialist,
14
safety manager, quality manager, environmental manager, facilities manager, specialist contractor, fabricator,
15
building product supplier, etc. You are involved in the function of information management
16
or BIM coordination since we are talking specifically about information management of buildings and infrastructure as opposed to general information management.
17
The confusion has arisen because some people believe incorrectly that BIM is only about the production of 3D models,
18
and therefore BIM coordination is just about coordinating those 3D models, or what is called clash detection.
19
But that is a very limited view of BIM and BIM coordination.
20
The international standard ISO 19650 has a far wider definition of BIM,
21
which includes all information that describe the physical and functional aspect of buildings and infrastructure.
22
This includes 3D models, geometric data,
23
alphanumeric data, and documentation, all managed in a common data environment CDE.
24
In that definition of BIM every person or discipline
25
that either needs information or who provides information has to engage with the management function of the CDE process.
26
Of course there are still hierarchies of management within the function
27
of information management from the client owner employer appointing party all the way through to the people who ultimately produce
28
or provide the information, the BIM authors.
29
There needs to be a information manager within each organization that is participating in a project, contributing to a specific task or discipline of work.
30
These are called task information managers.
31
They take responsibility for the information their own organization produces and approve it for sharing in the CDE.
32
Then there is a information manager who takes responsibility for a delivery team, a group of organizations in a specific phase or stage.
33
For example, this could be the lead designer for the design delivery team
34
or the main contractor for the construction delivery team or the facilities manager for the operations delivery team.
35
In each case, they are the lead appointed party responsible for the delivery of that phase
36
and they need an information manager who will liaise with the
37
other individual task information managers for the overall coordination of information for that phase or stage.
38
Of course, the client, owner, employer, appointing party also needs to have their own information manager
39
who will ultimately receive the information from the delivery team will need to check,
40
approve and accept that information so that it is authorized for use by others published in the CDE Common Data Environment.
41
This diagram describes the function of information management and the flow of information.
42
The requirements for information flow from the appointing party down in
43
the diagram through the hierarchy to the BIM authors who will produce the information.
44
The information flows back up the hierarchy in the CDE being checked and accepted at each stage.
45
Requirements also flow from right to left in the diagram.
46
In other words, the operations team should let the construction team know what they will need to perform the job,
47
and the construction team should let the design team know what they will need to perform the job.
48
The information flows from left to right to meet those requirements.
49
So you can see that information management is not the job or role of one person.
50
It is a function that is spread across all roles and disciplines who engage with the information.
51
Any project team
52
that thinks you only need to hire one BIM coordinator for
53
the project to manage everything has no idea how information management works.
54
Since the management of information relates specifically to buildings
55
and infrastructure involves the organization of the different elements of a complex activity so as to enable them to work together effectively.
56
This is by definition BIM coordination.
57
Thank you.
FOR YOU
推薦影片
本課的詞彙與口語要點
這節口語課以影片“What is BIMCoordination?”為素材。 影片中反覆出現的詞有:Bim, manager, management, coordination, infrastructure。 這段影片共有 57 個句子、811 個單詞可供跟讀。 講話部分時長為 5:17。 說話人語速自然,每分鐘約 153 個詞,接近日常對話。 85% 的單詞屬於英語最常用的 3,000 詞,其餘的詞建議在練習前先學一下。
影片中的重點詞彙
影片中 15 個值得學習的單詞,附發音和釋義:
| 單詞 | 發音 | 釋義 |
|---|---|---|
| coordination 名詞 | /kəʊˌɔːdɪˈneɪʃən/ | 協調動作的能力 /協調動作的能力 |
| infrastructure 名詞 | /ˈɪnfɹəˌstɹʌkt͡ʃə/ | 基礎設施 /基礎設施 |
| discipline 名詞 | /ˈdɪsəplɪn/ | 紀律 /紀律 |
| appoint 動詞 | /əˈpɔɪnt/ | 約定 /約定, 預約 /預約 |
| requirement 名詞 | /ɹɪˈkwaɪɹmənt/ | 要求, 需求 |
| diagram 名詞 | /ˈdaɪ.ə.ɡɹæm/ | 圖 /圖, 圖表 /圖表 |
| hierarchy 名詞 | /ˈhaɪ.ə.ɹɑː(ɹ).ki/ | 等級制度 /等級制度, 階層 /階層 |
| element 名詞 | /ˈɛləmənt/ | 要素 |
| participate 動詞 | /pɑːˈtɪs.ɪ.peɪt/ | 參加 /參加 |
| specialist 名詞 | /ˈspɛʃəlɪst/ | 專家 /專家, 專門家 /專門家 |
| employer 名詞 | /ɪmˈplɔɪə/ | 僱主, 老闆 |
| approve 動詞 | /əˈpɹuːv/ | 批准, 贊成 /贊成 |
| designer 名詞 | /dɪˈzaɪnɚ/ | 設計師 /設計師, 設計家 /設計家 |
| aspect 名詞 | /ˈæspɛkt/ | 方面 |
| hire 動詞 | /ˈhaɪɹ/ | 租借, 出租 |
影片中的語法
說話人最常用的結構,並附上影片中的原話:
| 結構 | 影片中的用法 |
|---|---|
| 被動語態 be + 過去分詞 — 強調發生了什麼,而不是誰做的 | is involved · are involved · is called |
| 定語從句 who / which + 從句 — 補充說明人或事物 | everyone that is · people who ultimately |
需要注意的發音
- “sh” 和 “zh” 音: coordination /kəʊˌɔːdɪˈneɪʃən/, specialist /ˈspɛʃəlɪst/, confusion /kənˈfjuːʒən/, detection /dɪˈtɛk.ʃən/, clash /ˈklæʃ/
- 長單詞——注意重音位置: coordination /kəʊˌɔːdɪˈneɪʃən/, infrastructure /ˈɪnfɹəˌstɹʌkt͡ʃə/, hierarchy /ˈhaɪ.ə.ɹɑː(ɹ).ki/, participate /pɑːˈtɪs.ɪ.peɪt/, documentation /ˌdɑkjəmɛnˈteɪʃən/
中文母語者容易讀錯的音:
- /v/ — 不要讀成 /w/,上齒輕觸下唇: approve /əˈpɹuːv/, involve /ɪnˈvɑlv/
- 詞尾子音 — 要讀清楚,後面不要加母音: appoint /əˈpɔɪnt/, engage /ɪnˈɡeɪd͡ʒ/, requirement /ɹɪˈkwaɪɹmənt/, element /ˈɛləmənt/, participate /pɑːˈtɪs.ɪ.peɪt/
- /r/ 和 /l/ 的區別: relate /ɹɪˈleɪt/, incorrectly /ˌɪnkəˈɹɛk(t).li/, alphanumeric /ˌæl.fə.n(j)uːˈmɛ.ɹɪk/
如何用這段影片練習
- 先完整聽一遍影片,不要開口,記下不認識的單詞。
- 先用 0.75 倍速逐句跟讀,熟練之後再回到正常速度。
- 錄下自己的聲音並與原聲對比,特別注意 coordination, infrastructure, discipline 這類單詞。
什麼是跟讀法?
跟讀法 (Shadowing) 是一種有科學依據的語言學習技巧,最初開發用於專業口譯員的培訓,並由多語言者Alexander Arguelles博士普及。這個方法簡單而強大:您在聽英語母語原聲的同時立即大聲重複——就像是一個延遲1-2秒緊跟說話者的影子。與被動聽力或語法練習不同,跟讀法強迫您的大腦和口腔肌肉同時處理並模模擬實的講話模式。研究表明它能顯著提高發音準確性,語調,節奏,連讀,聽力理解和口語流利度——使其成為雅思口語備考和真實英語交流最有效的方法之一。












