Практика Shadowing: What is BIMCoordination? - Изучайте разговорный английский по видео

Выберите режим практики

Каждый режим открывает полноэкранную комнату практики.

57 предложений
Если предложения слишком короткие или длинные, нажмите Edit, чтобы их изменить.
1
What is BIM coordination?
2
The definition of the word coordination is the organization of the different elements of a complex activity
3
so as to enable them to work together effectively.
4
The complex activity we are going to discuss here is the management of information related to buildings or infrastructure or BIM, building information modeling.
5
Information management or BIM coordination, when the information relates to buildings or infrastructure, is not a job title or a specific role.
6
Information management or BIM coordination is a function that everyone that is involved in the planning,
7
design, construction and operations of buildings or infrastructure has to participate in.
8
That is because every person and every discipline is involved with information.
9
You need information in order to do your job
10
and in doing your job you are probably producing or providing information that others will need to do the job.
11
If you are engaged in the planning, design, construction or operations of buildings or infrastructure, then you are involved in the communication or exchange of information,
12
which is the function of information management or BIM coordination.
13
So whether you are a client representative, architect, engineer, contractor, project manager, cost manager, design manager, procurement specialist,
14
safety manager, quality manager, environmental manager, facilities manager, specialist contractor, fabricator,
15
building product supplier, etc. You are involved in the function of information management
16
or BIM coordination since we are talking specifically about information management of buildings and infrastructure as opposed to general information management.
17
The confusion has arisen because some people believe incorrectly that BIM is only about the production of 3D models,
18
and therefore BIM coordination is just about coordinating those 3D models, or what is called clash detection.
19
But that is a very limited view of BIM and BIM coordination.
20
The international standard ISO 19650 has a far wider definition of BIM,
21
which includes all information that describe the physical and functional aspect of buildings and infrastructure.
22
This includes 3D models, geometric data,
23
alphanumeric data, and documentation, all managed in a common data environment CDE.
24
In that definition of BIM every person or discipline
25
that either needs information or who provides information has to engage with the management function of the CDE process.
26
Of course there are still hierarchies of management within the function
27
of information management from the client owner employer appointing party all the way through to the people who ultimately produce
28
or provide the information, the BIM authors.
29
There needs to be a information manager within each organization that is participating in a project, contributing to a specific task or discipline of work.
30
These are called task information managers.
31
They take responsibility for the information their own organization produces and approve it for sharing in the CDE.
32
Then there is a information manager who takes responsibility for a delivery team, a group of organizations in a specific phase or stage.
33
For example, this could be the lead designer for the design delivery team
34
or the main contractor for the construction delivery team or the facilities manager for the operations delivery team.
35
In each case, they are the lead appointed party responsible for the delivery of that phase
36
and they need an information manager who will liaise with the
37
other individual task information managers for the overall coordination of information for that phase or stage.
38
Of course, the client, owner, employer, appointing party also needs to have their own information manager
39
who will ultimately receive the information from the delivery team will need to check,
40
approve and accept that information so that it is authorized for use by others published in the CDE Common Data Environment.
41
This diagram describes the function of information management and the flow of information.
42
The requirements for information flow from the appointing party down in
43
the diagram through the hierarchy to the BIM authors who will produce the information.
44
The information flows back up the hierarchy in the CDE being checked and accepted at each stage.
45
Requirements also flow from right to left in the diagram.
46
In other words, the operations team should let the construction team know what they will need to perform the job,
47
and the construction team should let the design team know what they will need to perform the job.
48
The information flows from left to right to meet those requirements.
49
So you can see that information management is not the job or role of one person.
50
It is a function that is spread across all roles and disciplines who engage with the information.
51
Any project team
52
that thinks you only need to hire one BIM coordinator for
53
the project to manage everything has no idea how information management works.
54
Since the management of information relates specifically to buildings
55
and infrastructure involves the organization of the different elements of a complex activity so as to enable them to work together effectively.
56
This is by definition BIM coordination.
57
Thank you.

Скачать приложение

Всё для свободной речи

ИИ-оценка произношенияОценка каждой фразы
Практика IPAОсвойте каждый звук
СловарьСоберите свой словарный запас
Игра со словамиУчитесь играя
FOR YOU

Рекомендуемое видео

Лексика и советы по произношению к этому уроку

Этот урок разговорной практики построен на видео «What is BIMCoordination?». Чаще всего повторяются слова: Bim, manager, management, coordination, infrastructure. В этом видео 57 предложений и 811 слов для шедоуинга. Речь длится 5:17. Говорящий говорит в естественном темпе, около 153 слов в минуту, близком к повседневной речи. 85% слов входят в 3000 самых частых слов английского языка; остальные стоит разобрать перед занятием.

Ключевая лексика этого видео

15 слов из видео, которые стоит выучить, с произношением и значением:

СловоПроизношениеЗначение
coordination существительное/kəʊˌɔːdɪˈneɪʃən/согласова́ние, координа́ция
infrastructure существительное/ˈɪnfɹəˌstɹʌkt͡ʃə/инфраструкту́ра
discipline существительное/ˈdɪsəplɪn/дисципли́на, дисциплини́рованность
appoint глагол/əˈpɔɪnt/назначать
requirement существительное/ɹɪˈkwaɪɹmənt/необходи́мость, тре́бование
contractor существительное/ˈkɒnˌtɹæk.tə(ɹ)/подря́дчик, подря́дчица
diagram существительное/ˈdaɪ.ə.ɡɹæm/план, диагра́мма
hierarchy существительное/ˈhaɪ.ə.ɹɑː(ɹ).ki/иера́рхия
element существительное/ˈɛləmənt/элеме́нт, звено́
participate глагол/pɑːˈtɪs.ɪ.peɪt/уча́ствовать, принима́ть уча́стие
enable глагол/ɪˈneɪ.bəl/дава́ть возмо́жность, уполномо́чивать
specialist существительное/ˈspɛʃəlɪst/специали́ст, специали́стка
employer существительное/ɪmˈplɔɪə/работода́тель, работода́тельница
approve глагол/əˈpɹuːv/утвержда́ть, утверди́ть
designer существительное/dɪˈzaɪnɚ/диза́йнер

Фразовые глаголы, которые вы услышите

СловоЗначение
back up глаголдава́ть за́дний ход

Грамматика в этом видео

Конструкции, которые говорящий использует чаще всего, с точными словами из видео:

КонструкцияВ видео
Пассивный залог be + причастие прошедшего времени — важно, что происходит, а не кто это делаетis involved · are involved · is called
Придаточные определительные who / which + предложение — уточнение о человеке или предметеeveryone that is · people who ultimately

Произношение, на которое стоит обратить внимание

  • Звуки «sh» и «zh»: coordination /kəʊˌɔːdɪˈneɪʃən/, specialist /ˈspɛʃəlɪst/, confusion /kənˈfjuːʒən/, detection /dɪˈtɛk.ʃən/, clash /ˈklæʃ/
  • Длинные слова — следите за ударением: coordination /kəʊˌɔːdɪˈneɪʃən/, infrastructure /ˈɪnfɹəˌstɹʌkt͡ʃə/, hierarchy /ˈhaɪ.ə.ɹɑː(ɹ).ki/, participate /pɑːˈtɪs.ɪ.peɪt/, documentation /ˌdɑkjəmɛnˈteɪʃən/

Звуки, трудные для русскоязычных:

  • /h/ — лёгкий выдох, а не русское «х»: hierarchy /ˈhaɪ.ə.ɹɑː(ɹ).ki/, hire /ˈhaɪɹ/
  • Звонкие согласные в конце слова — не оглушайте их: engage /ɪnˈɡeɪd͡ʒ/, approve /əˈpɹuːv/, involve /ɪnˈvɑlv/, oppose /əˈpoʊz/, arise /əˈɹaɪz/

Как заниматься с этим видео

  1. Прослушайте всё видео один раз молча и выпишите незнакомые слова.
  2. Начните со скорости 0,75×, повторяйте предложение за предложением и вернитесь к обычной скорости, когда станет легко.
  3. Запишите себя и сравните с оригиналом, обращая внимание на такие слова, как coordination, infrastructure, discipline.

Что такое техника Shadowing?

Shadowing — это научно обоснованная техника изучения языка, изначально разработанная для подготовки профессиональных переводчиков и популяризированная полиглотом доктором Александром Аргуэльесом. Метод прост, но эффективен: вы слушаете аудио на английском от носителей языка и немедленно повторяете вслух — как тень, следующая за говорящим с задержкой в 1–2 секунды. В отличие от пассивного прослушивания или грамматических упражнений, Shadowing заставляет мозг и мышцы рта одновременно обрабатывать и воспроизводить реальные речевые паттерны. Исследования показывают, что это значительно улучшает точность произношения, интонацию, ритм, связную речь, понимание на слух и беглость речи — что делает его одним из самых эффективных методов для подготовки к IELTS Speaking и реального общения на английском.

Техника шедоуинга: читать полное пошаговое руководство →