1
At DHL you can expect a global reach and on -site presence of the end -to -end logistics you can trust.
2
The Industrial Project Cargo team provides turnkey project cargo services to the oil and gas industry, prioritizing speed and precision.
3
Our in -house engineers support project execution at all of the move.
4
And our project management team is dedicated to safety, agility, and efficiency in large -scale industrial project logistics.
5
This project consisted of a fully chartered vessel transporting refinery equipment from India to the US.
6
The cargo would be discharged from vessel to barge, and move to its final destination.
7
As Cade Tompley elaborates So we started planning this cargo well over a year ago.
8
more in detail in the past six months.
9
And then in the final couple of weeks, We really detail it down.
10
This entails a lot.
11
We've got a major team behind us.
12
That is what makes us special is our coordinators, our project managers, our operations managers our teams of engineers,
13
our safety guys, chartering, and even our customs compliance to ensure that once the cargo arrives to the port, it doesn't have any delays and continues moving.
14
It takes a lot of communication, it takes a lot of teamwork from our side here to origin side as well.
15
Foreign destinations, this cargo came out of India.
16
We had two major port stops.
17
It was a full vessel charter but we were able to consolidate and save money for our client, save time for their project, and increase production and construction.
18
When planning discharge here in the Port of New Orleans, It's critical that we schedule the barges in coordination for each piece of cargo.
19
Each barge has been outfitted with the grillage for that individual piece.
20
This becomes a major portion of scheduling because any delays here create additional costs.
21
Our teams have worked around the clock to ensure that everybody is on time, the barges are positioned and ready to go, and all the equipment needed for this handling.
22
is there and ready We don't have any delays.
23
We don't have any additional costs.
24
The first discharge were pipe racks, 40 meters in length, weighing in at over 40 metric tons.
25
So when it comes to lifting these pipe rack modules, it takes a lot of gear.
26
It takes a 770 metric ton spreader bar to reach the correct lift point.
27
So we ensure there's no damage to the cargo during the handling.
28
With this all combined, we have over 120 metric tons of cargo and gear hooked to the crane.
29
This crane has a seven meter outread to meet the capacity of the weight
30
and where it's positioned on the barge to where it's going on the vessel.
31
Next, the columns were discharged.
32
These columns spanning over 70 meters weighed in at over 300 metric tons.
33
They were lifted by tandem lift and placed on a 260 -foot barge, strategically placing it on stands as the ballasted in order to bring it to the correct draft,
34
preparing it for roll -off upon delivery to its next destination.
35
There's a lot of calculation and planning that comes with a lift of this magnitude.
36
Each crane has its own distance and capacity at a certain reach.
37
So we have to ensure that The center of gravity is the gear that's used, and the weight of the cargo itself per crane is achieved within the capacity, so we have no issues,
38
we have no damage to the cargo, and we can be able to move it in a timely manner.
39
When transporting a move like this, it can present many challenges.
40
But with DHL, those challenges are met with solutions.
41
The challenges we face are one of scheduling, We need the cargo to reach the vessel as it arrives at the port, with no delays so we don't have any additional cost.
42
What that entails is when certain items can't go over the road, we've got to move it by bar.
43
The cargo arriving on the barge to the ship It is critical that it's positioned correctly on the barge, that we meet the capacity of the cranes from the ship.
44
The challenges we face sometimes could be the water, the channel width, and the ability to either turn the ship or the barge,
45
so that we have the capacity within the crane to achieve the transload from barge to the vessel.
46
DHL has a global team supporting all the moves, and at Industrial Projects we have offices worldwide with in -house engineers,
47
chartering groups, custom brokerage groups, operations managers, project managers, and coordinators to make sure all parties have correct communication, planning, and scheduling.
48
When you have mission -critical heavy lift projects, you can count on DHL, industrial projects.

ดาวน์โหลดแอป

ทุกอย่างที่ต้องใช้เพื่อพูดได้คล่อง

AI ให้คะแนนการออกเสียงให้คะแนนทุกประโยค
ฝึก IPAเชี่ยวชาญทุกเสียง
คำศัพท์สร้างคลังคำของคุณ
เกมคำศัพท์เล่นไปเรียนไป
FOR YOU

วิดีโอแนะนำ

บริบท & พื้นหลัง

ในวิดีโอนี้ เราจะได้เรียนรู้เกี่ยวกับการจัดการขนส่งสินค้าหนักข้ามมหาสมุทร โดยเฉพาะอย่างยิ่งในอุตสาหกรรมพลังงาน น้ำมัน และก๊าซ การสนทนาในวิดีโอนี้เน้นถึงความสำคัญของความเร็วและความแม่นยำในการขนส่งสินค้าขนาดใหญ่ รวมถึงการประสานงานที่ดีระหว่างทีมงานที่มีความเชี่ยวชาญต่าง ๆ ไม่ว่าจะเป็นวิศวกร ผู้จัดการโครงการ และผู้ดูแลความปลอดภัย สิ่งเหล่านี้มีความสำคัญในการทำให้การขนส่งเป็นไปอย่างราบรื่นและไม่มีปัญหา

5 วลีสำคัญสำหรับการสื่อสารในชีวิตประจำวัน

  • “It takes a lot of communication” - ความสำคัญของการสื่อสารที่มีประสิทธิภาพ
  • “We don’t have any delays” - แนวทางในการป้องกันความล่าช้า
  • “We need to schedule” - การวางแผนตารางเวลาอย่างมีระบบ
  • “Our teams have worked around the clock” - ความทุ่มเทของทีมงาน
  • “Mission-critical heavy lift projects” - โครงการที่มีความสำคัญสูง

แนวทางการฝึกพูดแบบขั้นตอน

การฝึกฝนการพูดภาษาอังกฤษจากวิดีโอนี้สามารถทำได้โดยการใช้วิธี “ชาโดว์อิ้ง” หรือการฝึกพูดตามเสียง โดยเริ่มต้นจากการฟังวิดีโอและพยายามเลียนเสียงตาม โดยมีขั้นตอนดังนี้:

  1. ฟังวิดีโออย่างตั้งใจ: เริ่มต้นด้วยการฟังเนื้อหาทั้งหมดเพื่อให้เข้าใจบริบทและความคิดหลัก
  2. เลือกวลีที่ต้องการฝึก: จากวลีที่ได้เรียนรู้ในส่วนก่อนหน้า เลือกขึ้นมา 2-3 วลีเพื่อฝึกซ้ำ
  3. ฝึกพูดตามเสียง: เปิดวิดีโอและพูดตามเสียงในขณะที่พยายามปรับปรุงการออกเสียงภาษาอังกฤษของตัวเอง
  4. บันทึกเสียงของตัวเอง: บันทึกเสียงขณะฝึกพูด เพื่อที่จะได้ฟังย้อนกลับและปรับปรุงการออกเสียง
  5. ทำซ้ำหลายครั้ง: ฝึกซ้ำจนรู้สึกมั่นใจในการพูดตามเสียง

การฝึกพูดภาษาอังกฤษในลักษณะนี้จะช่วยพัฒนาทักษะการพูดและการฟังของคุณได้อย่างมีประสิทธิภาพ ทำให้สามารถสื่อสารได้ดีขึ้นในสถานการณ์จริง

ไวยากรณ์ในวิดีโอนี้

โครงสร้างที่ผู้พูดใช้บ่อยที่สุด พร้อมคำพูดจริงจากวิดีโอ:

โครงสร้างในวิดีโอ
Passive voice be + กริยาช่อง 3 — เน้นสิ่งที่เกิดขึ้น ไม่ใช่ผู้กระทำwould be discharged · has been outfitted · are positioned
Present perfect have/has + กริยาช่อง 3 — เหตุการณ์ในอดีตที่ยังเกี่ยวข้องกับปัจจุบันhas been outfitted · have worked

เทคนิค Shadowing คืออะไร?

Shadowing เป็นเทคนิคการเรียนรู้ภาษาที่ได้รับการรับรองทางวิทยาศาสตร์ พัฒนาขึ้นสำหรับการฝึกนักแปลมืออาชีพ วิธีการนี้เรียบง่ายแต่ทรงพลัง: คุณฟังเสียงภาษาอังกฤษจากเจ้าของภาษาและพูดตามทันที — เหมือนเงาที่ตามผู้พูดด้วยช่วงเวลาห่าง 1-2 วินาที การวิจัยแสดงว่าเทคนิคนี้ปรับปรุงความแม่นยำในการออกเสียง ทำนองเสียง จังหวะ การเชื่อมเสียง การฟังเข้าใจ และความคล่องแคล่วในการพูดได้อย่างมีนัยสำคัญ

เทคนิค shadowing: อ่านคู่มือฉบับเต็มทีละขั้นตอน →