At DHL you can expect a global reach and on -site presence of the end -to -end logistics you can trust.
2
The Industrial Project Cargo team provides turnkey project cargo services to the oil and gas industry, prioritizing speed and precision.
3
Our in -house engineers support project execution at all of the move.
4
And our project management team is dedicated to safety, agility, and efficiency in large -scale industrial project logistics.
5
This project consisted of a fully chartered vessel transporting refinery equipment from India to the US.
6
The cargo would be discharged from vessel to barge, and move to its final destination.
7
As Cade Tompley elaborates So we started planning this cargo well over a year ago.
8
more in detail in the past six months.
9
And then in the final couple of weeks, We really detail it down.
10
This entails a lot.
11
We've got a major team behind us.
12
That is what makes us special is our coordinators, our project managers, our operations managers our teams of engineers,
13
our safety guys, chartering, and even our customs compliance to ensure that once the cargo arrives to the port, it doesn't have any delays and continues moving.
14
It takes a lot of communication, it takes a lot of teamwork from our side here to origin side as well.
15
Foreign destinations, this cargo came out of India.
16
We had two major port stops.
17
It was a full vessel charter but we were able to consolidate and save money for our client, save time for their project, and increase production and construction.
18
When planning discharge here in the Port of New Orleans, It's critical that we schedule the barges in coordination for each piece of cargo.
19
Each barge has been outfitted with the grillage for that individual piece.
20
This becomes a major portion of scheduling because any delays here create additional costs.
21
Our teams have worked around the clock to ensure that everybody is on time, the barges are positioned and ready to go, and all the equipment needed for this handling.
22
is there and ready We don't have any delays.
23
We don't have any additional costs.
24
The first discharge were pipe racks, 40 meters in length, weighing in at over 40 metric tons.
25
So when it comes to lifting these pipe rack modules, it takes a lot of gear.
26
It takes a 770 metric ton spreader bar to reach the correct lift point.
27
So we ensure there's no damage to the cargo during the handling.
28
With this all combined, we have over 120 metric tons of cargo and gear hooked to the crane.
29
This crane has a seven meter outread to meet the capacity of the weight
30
and where it's positioned on the barge to where it's going on the vessel.
31
Next, the columns were discharged.
32
These columns spanning over 70 meters weighed in at over 300 metric tons.
33
They were lifted by tandem lift and placed on a 260 -foot barge, strategically placing it on stands as the ballasted in order to bring it to the correct draft,
34
preparing it for roll -off upon delivery to its next destination.
35
There's a lot of calculation and planning that comes with a lift of this magnitude.
36
Each crane has its own distance and capacity at a certain reach.
37
So we have to ensure that The center of gravity is the gear that's used, and the weight of the cargo itself per crane is achieved within the capacity, so we have no issues,
38
we have no damage to the cargo, and we can be able to move it in a timely manner.
39
When transporting a move like this, it can present many challenges.
40
But with DHL, those challenges are met with solutions.
41
The challenges we face are one of scheduling, We need the cargo to reach the vessel as it arrives at the port, with no delays so we don't have any additional cost.
42
What that entails is when certain items can't go over the road, we've got to move it by bar.
43
The cargo arriving on the barge to the ship It is critical that it's positioned correctly on the barge, that we meet the capacity of the cranes from the ship.
44
The challenges we face sometimes could be the water, the channel width, and the ability to either turn the ship or the barge,
45
so that we have the capacity within the crane to achieve the transload from barge to the vessel.
46
DHL has a global team supporting all the moves, and at Industrial Projects we have offices worldwide with in -house engineers,
47
chartering groups, custom brokerage groups, operations managers, project managers, and coordinators to make sure all parties have correct communication, planning, and scheduling.
48
When you have mission -critical heavy lift projects, you can count on DHL, industrial projects.

הורד אפליקציה

כל מה שאתה צריך כדי לדבר בשטף

הגיית AIציון לכל משפט
תרגול IPAשלוט בכל צליל
אוצר מיליםבנה את מאגר המילים שלך
משחק אוצר מיליםלמד תוך כדי משחק
FOR YOU

המלץ על סרטון

אוצר מילים והערות הגייה לשיעור הזה

שיעור הדיבור הזה ברמה C1 מבוסס על הסרטון “DHL Industrial Projects”. המילים שחוזרות הכי הרבה: cargo, project, barge, crane, vessel. בסרטון הזה יש 48 משפטים ו-790 מילים לתרגול Shadowing. הדיבור נמשך 4:44. הדובר מדבר בקצב טבעי של כ-167 מילים בדקה, קרוב לשיחה יומיומית. רק 79% מהמילים נמצאות בין 3,000 המילים הנפוצות ביותר באנגלית, כך שאוצר המילים מאתגר.

אוצר מילים מרכזי בסרטון הזה

15 המילים המתקדמות ביותר בסרטון, עם ההגייה והמשמעות שלהן:

מילההגייהמשמעות
barge שם עצם/ˈbɑɹd͡ʒ/אַרְבָּה, דוברה
crane שם עצם/kɹeɪn/עָגוּר
metric שם תואר/ˈmɛt.ɹɪk/מֶטְרִי
logistics שם עצם/ləˈd͡ʒɪstɪks/לוֹגִיסטִיקָה
weigh פועל/weɪ/שקל
meter שם עצם/ˈmitəɹ/מֶטֶר, מִדָּה
ballast שם עצם/ˈbæl.əst/רבד
consolidate פועל/kənˈsɒl.ɪ.deɪt/גִּבֵּשׁ /גיבש
dedicate פועל/ˈdɛdɪˌkeɪt/הקדיש
metre שם עצם/ˈmiːtəɹ/מֶטֶר
calculation שם עצם/ˌkælkjuˈleɪʃn̩/חִשׁוּב \ חישוב
module שם עצם/ˈmɑd͡ʒul/מוֹדוּל
coordination שם עצם/kəʊˌɔːdɪˈneɪʃən/תיאום
width שם עצם/ˈwɪtθ/רוחב \ רֹחַב
span שם עצם/spæn/זֶרֶת

דקדוק בסרטון הזה

המבנים שהדובר משתמש בהם הכי הרבה, עם המילים המדויקות מהסרטון:

מבנהבסרטון
סביל (Passive voice) be + past participle — הדגש הוא על מה שקורה, לא על מי שעושה את הפעולהwould be discharged · has been outfitted · are positioned
הווה מושלם (Present perfect) have/has + past participle — פעולה שקרתה בעבר ועדיין יש לה חשיבות או השפעה עכשיוhas been outfitted · have worked

הגייה ששווה לשים לב אליה

הדובר משתמש ב-7 קיצורים וצורות מקוצרות, כמו don't, we've, can't. אמרו אותם בצורה הקצרה, כפי שאתם שומעים אותם.

  • הצלילים של “sh” ו-“zh”: calculation /ˌkælkjuˈleɪʃn̩/, coordination /kəʊˌɔːdɪˈneɪʃən/, precision /pɹɪˈsɪʒ.ən/
  • מילים ארוכות — שימו לב להטעמה: agility /əˈd͡ʒɪl.ɪ.ti/, consolidate /kənˈsɒl.ɪ.deɪt/, prioritize /pɹaɪˈɒɹ.ə.taɪz/, refinery /rɪˈfaɪnərɪ/, coordination /kəʊˌɔːdɪˈneɪʃən/

צלילים שדוברי עברית מתקשים בהם:

  • /w/ — שפתיים מעוגלות, לא /v/: weigh /weɪ/, width /ˈwɪtθ/
  • /æ/ — פתוח יותר מה-“אֶ” העברית, לא כמו “a” ב-“cup”: rack /ɹæk/, ballast /ˈbæl.əst/, tandem /ˈtændəm/, calculation /ˌkælkjuˈleɪʃn̩/, magnitude /ˈmæɡnɪtjuːd/
  • /r/ — הלשון לא נוגעת בשום מקום, לא ה-“ר” הגרונית: barge /ˈbɑɹd͡ʒ/, crane /kɹeɪn/, metric /ˈmɛt.ɹɪk/, discharge /dɪsˈtʃɑɹdʒ/, rack /ɹæk/

איך לתרגל עם הסרטון הזה

  1. הקשיבו לכל הסרטון פעם אחת בלי לדבר, ורשמו את המילים שאתם לא מכירים.
  2. התחילו במהירות 0.75×, תרגלו Shadowing משפט אחר משפט, וחזרו למהירות רגילה כשזה מרגיש קל.
  3. הקליטו את עצמכם והשוו למקור, תוך תשומת לב למילים כמו barge, crane, metric.

מהי טכניקת השאדואינג?

שאדואינג היא טכניקת למידת שפה מבוססת מדע שפותחה במקור להכשרת מתורגמנים מקצועיים ופופולרית על ידי הפוליגלוט ד"ר אלכסנדר ארגואלס. השיטה פשוטה אך עוצמתית: אתה מקשיב לאודיו באנגלית ילידית וחוזר עליו בקול רם מיד — כמו צל העוקב אחרי הדובר עם עיכוב של 1–2 שניות בלבד. בניגוד להאזנה פסיבית או תרגילי דקדוק, שאדואינג מכריח את המוח והשרירים בפה לעבד ולשחזר דפוסי דיבור אמיתיים בו זמנית. מחקרים מראים שזה משפר משמעותית את דיוק ההגייה, האינטונציה, הקצב, הדיבור המחובר, הבנת השמיעה ושטף הדיבור — מה שהופך אותו לאחת השיטות היעילות ביותר להכנה לIELTS Speaking ולתקשורת באנגלית בעולם האמיתי.

טכניקת Shadowing: קרא את המדריך המלא שלב אחר שלב →