シャドーイング練習: Cambridge 16 IELTS Reading Test 4 Passage 1 - 動画で英語スピーキングを学ぶ
レッスンを作成中...
1
Cambridge 16, IELTS Reading Test 4.
2
Passage 1.
3
Roman Tunnels.
4
The Romans, who once controlled areas of Europe, North Africa, and Asia Minor, adopted the construction techniques of other civilizations to build tunnels in their territories.
5
The Persians, who lived in present-day Iran, were one of the first civilizations to build tunnels that provided a reliable supply of water to human settlements in dry areas.
6
In the early 1st millennium BCE, they introduced the Canet method of tunnel construction, which consisted of placing posts over a hill in a straight line to ensure
7
that the tunnel kept to its root and then digging vertical shafts down into the ground at regular intervals.
8
Underground, workers removed the air from between the ends of the shafts, creating a tunnel.
9
The excavated soil was taken up to the surface using the shafts, which also provided ventilation during the work.
10
Once the tunnel was completed, it allowed water to flow from the top of a hillside down towards a canal, which supplied water for human use.
11
Remarkably, some canets built by the persians 2 700 years ago
12
are still in use today they later passed on their knowledge
13
to the romans who also used the cannet method to construct
14
water supply tunnels for agriculture roman cannet tunnels were constructed with vertical shafts dug at intervals of between 30
15
and 60 meters the shafts were equipped with handholds
16
and footholds to help those climbing in and out of them and were covered with a wooden or stone lid.
17
To ensure that the shafts were vertical, Romans hung a plumb line from a rod placed across the top of each shaft
18
and made sure that the weight at the end of it hung in the center of the shaft.
19
Plumb lines were also used to measure the depth of the shaft and to determine the slope of the tunnel.
20
The 5.6 kilometer long Claudius tunnel, built in 41 CE to drain the Fusine Lake in central Italy,
21
had shafts that were up to 122 meters deep, took 11 years to build and involved approximately 30,000 workers.
22
By the 6th century BCE, a second method of tunnel construction appeared called the counter-excavation method,
23
in which the tunnel was constructed from both ends.
24
It was used to cut through high mountains when the Kanat method was not a practical alternative.
25
This method required greater planning and advanced knowledge of surveying, mathematics and geometry as both ends of a tunnel had to meet correctly at the center of the mountain.
26
Adjustments to the direction of the tunnel also had to be made whenever builders encountered geological problems
27
or when it deviated from its set path.
28
They constantly checked the tunnel's advancing direction, for example, by looking back at the light that penetrated through the tunnel mouth, and make corrections whenever necessary.
29
Large deviations could happen, and they could result in one end of the tunnel not being usable.
30
An inscription written on the side of a 428-meter tunnel built
31
by the Romans as part of the Salve aqueduct system in
32
modern-day Algeria describes how the two teams of builders missed each other in the mountain
33
and how the later construction of lateral link between both corridors corrected the initial error.
34
The Romans dug tunnels for their roads using the counter-excavation method whenever they encountered obstacles such as hills
35
or mountains that were too high for roads to pass over.
36
An example is the 37-meter-long, 6-meter-high, Furlopass tunnel built in Italy in 69-79 CE.
37
Remarkably, a modern road still uses this tunnel today.
38
Tunnels were also built for mineral extraction.
39
Miners would locate a mineral vein and then pursue it with shafts and tunnels underground.
40
Traces of such tunnels used to mine gold can still be found at the Dolokoti mines in Wales.
41
When the sole purpose of a tunnel was mineral extraction, construction required less planning, as the tunnel route was determined by the mineral vein.
42
Roman tunnel projects were carefully planned and carried out.
43
The length of time it took to construct a tunnel depended on the method being used
44
and the type of rock being excavated.
45
The Canet construction method was usually faster than the counter excavation method as it was more straightforward.
46
This was because the mountain could be excavated not only from the tunnel mouths but also from shafts.
47
The type of rock could also influence construction times.
48
When the rock was hard,
📺 同じチャンネル
✨ おすすめ動画
このレッスンの語彙とスピーキングのポイント
このB2レベルのスピーキングレッスンは、動画「Cambridge 16 IELTS Reading Test 4 Passage 1」を教材にしています。 繰り返し出てくる語は次のとおりです:tunnel, shaft, method, roman, construction。 この動画には、シャドーイング用の文が48文、単語が731語あります。 音声の長さは4:40です。 話す速さは1分あたり約157語で、日常会話に近い自然なペースです。 英語の頻出3,000語に含まれる単語は75%だけなので、語彙は難しめです。
この動画の重要語彙
動画の中で特に難しい単語15語を、発音と意味つきで紹介します。
| 単語 | 発音 | 意味 |
|---|---|---|
| construct 動詞 | /ˈkɑn.stɹʌkt/ | 建設する, 建てる |
| mineral 名詞 | /ˈmɪn.ə.ɹəl/ | 鉱物 |
| metre 名詞 | /ˈmiːtəɹ/ | メートル, ㍍ |
| vertical 形容詞 | /ˈvɝ.tɪ.kəl/ | 垂直の, 縦の |
| plum 名詞 | /plʌm/ | 暗紫色, セイヨウスモモ |
| vein 名詞 | /veɪn/ | 静脈 |
| interval 名詞 | /ˈɪntɚvəl/ | 間隔 |
| builder 名詞 | /ˈbɪl.dəɹ/ | 建設者 |
| civilization 名詞 | /ˌsɪv.ɪ.laɪˈzeɪ.ʃən/ | 文明 |
| meter 名詞 | /ˈmitəɹ/ | メーター, 計量器 |
| aqueduct 名詞 | /ˈæk.wəˌdʌkt/ | 水道橋 |
| deviate 動詞 | /ˈdiː.vi.eɪt/ | 逸れる |
| deviation 名詞 | /ˌdiː.viˈeɪʃən/ | 偏差 |
| kilometre 名詞 | /kɪˈlɑmɪtəɹ/ | キロメートル |
| equip 動詞 | /ɪˈkwɪp/ | 装着 |
動画に出てくる句動詞
| 単語 | 発音 | 意味 |
|---|---|---|
| carry out 動詞 | /ˈkæ.ɹi aʊt/ | 行う, 実行する |
注意したい発音
- 「sh」と「zh」の音: shaft /ˈʃɑːft/, excavation /ˌɛkskəˈveɪʃn/, extraction /ɪkˈstɹækʃən/, civilization /ˌsɪv.ɪ.laɪˈzeɪ.ʃən/, deviation /ˌdiː.viˈeɪʃən/
- 長い単語(アクセントの位置に注意): remarkably /ɹɪˈmɑɹkəbli/, civilization /ˌsɪv.ɪ.laɪˈzeɪ.ʃən/, deviation /ˌdiː.viˈeɪʃən/, kilometre /kɪˈlɑmɪtəɹ/, ventilation /ˌvɛntɪˈleɪʃ(ə)n/
日本語話者が苦手な音:
- /r/ と /l/ の区別 — /l/ は舌先を歯茎につけ、/r/ はどこにもつけない: mineral /ˈmɪn.ə.ɹəl/, remarkably /ɹɪˈmɑɹkəbli/, builder /ˈbɪl.dəɹ/, kilometre /kɪˈlɑmɪtəɹ/, lateral /ˈlætəɹəl/
- /v/ — /b/ にならないように、上の歯を下唇に当てる: excavate /ˈɛk.skə.veɪt/, excavation /ˌɛkskəˈveɪʃn/, vertical /ˈvɝ.tɪ.kəl/, vein /veɪn/, interval /ˈɪntɚvəl/
- /f/ — 「フ」ではなく、上の歯と下唇で出す: shaft /ˈʃɑːft/, foothold /ˈfʊthoʊld/, straightforward /ˌstɹeɪtˈfɔː(ɹ)wə(ɹ)d/
この動画での練習方法
- まず声を出さずに動画を最後まで聞き、知らない単語をメモします。
- まず0.75倍速で一文ずつシャドーイングし、慣れてきたら通常の速度に戻します。
- 自分の声を録音して元の音声と比べます。construct, mineral, metreなどの単語に特に注意しましょう。
シャドーイングとは?英語上達に効果的な理由
シャドーイング(Shadowing)は、もともとプロの通訳者養成プログラムで開発された言語学習法で、多言語習得者として知られるDr. Alexander Arguelles によって広く普及されました。方法はシンプルですが非常に効果的:ネイティブスピーカーの英語を聞きながら、1〜2秒の遅延で声に出してすぐに繰り返す——まるで「影(shadow)」のように話者を追いかけます。文法ドリルや受動的なリスニングと異なり、シャドーイングは脳と口の筋肉が同時にリアルタイムで英語を処理・再現することを強制します。研究により、発音精度、抑揚、リズム、連音、リスニング力、そして会話の流暢さが大幅に向上することが確認されています。IELTSスピーキング対策や自然な英語コミュニケーションを目指す方に特におすすめです。






















