Welcome to Young Business Professionals.
2
I'm Felix and this is another video of our automotive know-how video series.
3
I will give you an introduction into a so-called control plan.
4
If you are interested in increasing your automotive knowledge, please feel free to subscribe to my channel and like the video video.
5
You may also check out our Facebook page through
6
which we would like to create a community that shall support each other growing everybody's knowledge.
7
Well now let me introduce control plans to you.
8
A control plan is making sure
9
that the production process of a product is running under controllable
10
or manageable circumstances so products without failures respectively products according to customer requirements can be produced.
11
It is a tool defined by the IETF 6949 standard, but was also mentioned already within QS 9000.
12
It defines important product and process characteristics of a product
13
or a product group and specifies how these characteristics have to be monitored.
14
The control plan is also part of the AP QP process and is touched the first time in phase two,
15
alternatively phase three of the project
16
if a control plan for prototypes is being made already then it's touched already in phase two
17
but latest you start to use it to be for pre-serial
18
components respectively in phase three i have created this chart in
19
order to explain a little bit more in detail how a process plan looks like,
20
which inputs he's using, what you can do with that tool and what should be the result of using it.
21
Within a control plan, you're listing the production process of the product,
22
starting from raw materials entering your plant until the finished goods leaving your plant.
23
This is already described in a process flowchart, so the information from the flowchart can be carried over to the control plan.
24
Each process may influence specific characteristics of the products that will be listed in the control plan as well.
25
These characteristics might be special characteristics requested by a customer
26
but it might be also usual dimensional characteristics specified on the drawing of the product
27
or it might be information derived from the product and process FMEA.
28
Once these characteristics are all listed in the control plan, a test method per characteristic is defined in order to make sure that it will be checked.
29
You are also defining a checking frequency in the plan
30
and actions that have to be initiated once the characteristics cannot be fulfilled.
31
So then, during the production of the product,
32
this plan is controlling that all these defined requirements will be kept and in case one of them is not kept,
33
a specific action is derived that will either make sure
34
that the requirements will be fulfilled after some rework action or similar or the product is exiting the process.
35
On this way, the control plan makes sure that just products according to defined requirements may leave the company.
36
In order to increase your understanding, I have also listed here a number of information that are typically part of a control plan,
37
such as the date of creation or the change of the control plan or change level of the control plan,
38
customer information, such as the customer part number or similar, the supplier description and location,
39
so the production plan of the producing company,
40
the part number and part description of the supplier, the engineering change level of the component itself.
41
That is important because once you perform an engineering change to the product
42
or to the process you need to also revise the control
43
plan accordingly the level of the control plan is it used for prototypes is it used for pre-serial production
44
or for serial production needs to be marked supplier contact information
45
should be available so the customer can get in touch with somebody that can answer some questions on that control plan
46
then there should be a process step description based on the process flow chart
47
in the best case also the numbers of the pros process flow chart are carried over to the process
48
steps in the control plan.
49
In addition, special characteristics are included in the control plan and they are marked exclusively.
50
Also, the specification of characteristics have to be defined in the control plan,
51
such, for example, like tolerances of a dimension
52
and also the number of the equipment of the relevant process step in
53
which a dimension might be influenced should be mentioned as well as general test methods
54
and evaluation techniques should be listed in control plans it's important to add also the test equipment
55
and the corresponding test method with which a
56
characteristic within its specification has to be tested
57
and also a frequency means the number of the tests to be performed per shift
58
or per day or per week and needs to be defined
59
and also the corresponding control method and very important once there is a deviation detected on one of the dimensions for instance,
60
a reaction needs to be derived and so behind each of these
61
items that have to be controlled also a reaction plan needs to be added.
62
In case you got all these points already on your control plan format, you can be sure that you are on a pretty good level.
63
What else is important with regard to control plans?
64
You should always be aware about the fact that a control plan is a living file.
65
It is always required to keep it up to date and it never reaches a final level, except the product is going out of production.
66
Once a drawing, a FMEA or the process flow changes, it is important to also update the control plan accordingly.
67
And another important fact that I need to mention is the accord,
68
the accordance of drawings or of the drawing FMEA and control plan with regard to special characteristics.
69
This is a must-have.
70
What does that mean?
71
In case there are special characteristics for a product, they must be marked and highlighted in drawing, FMEA and control plan.
72
This is making sure that these important characteristics are monitored with a high focus
73
and the product can never be failing with regard to these.
74
So, that's it.
75
I hope you got a rough introduction into control plans.
76
We will follow up with further videos handling automotive process topics.
77
I hope you enjoyed this video.
78
In case you did, I'm looking forward for your likes and your feedback below the video.
79
Please subscribe to the channel to not miss further updates.
80
Please feel free to join also our Facebook community.
81
You may find the link below the video.
82
Have a great day!

앱 다운로드

유창하게 말하는 데 필요한 모든 것

AI 발음 평가문장마다 점수 확인
IPA 발음 연습모든 소리 마스터
단어 학습나만의 단어장 만들기
단어 게임놀면서 외우기

같은 채널

FOR YOU

추천 영상

이 레슨의 어휘와 말하기 포인트

이 C1 수준 말하기 레슨은 영상 “Control Plan - What is a Control Plan?”을(를) 바탕으로 합니다. 가장 자주 반복되는 단어는 다음과 같습니다: product, process, characteristic, production, defined. 이 영상에는 섀도잉할 문장 82개와 단어 1115개가 있습니다. 말하는 구간의 길이는 8:15입니다. 화자는 분당 약 135단어의 일정한 속도로 말해서 섀도잉하기에 편한 속도입니다. 단어의 86%가 영어에서 가장 많이 쓰이는 3,000단어에 속합니다. 나머지는 연습 전에 미리 확인해 두세요.

이 영상의 핵심 어휘

영상에서 가장 어려운 단어 12개를 발음, 뜻과 함께 정리했습니다.

단어발음뜻
characteristic 명사/ˌkæɹ(ə)ktəˈɹɪstɪk/특성, 특징
supplier 명사/səˈplaɪə/공급자
dimension 명사/daɪˈmɛn.ʃən/치수
correspond 동사/ˌkoɹəˈspɑnd/일치하다, 부합하다
specification 명사사양, 스펙
fulfill 동사/fʊlˈfɪl/수행하다
subscribe 동사/səbˈskɹaɪb/구독하다
revise 동사/ɹɪˈvaɪz/복습하다
circumstance 명사/ˈsɝ.kəmˌstæns/상황
alternatively 부사/ɔlˈtɝ.nə.tɪv.li/또는
accord 명사/əˈkɔɹd/협정
detect 동사/dɪˈtɛkt/찾다, 탐지하다

이 영상의 문법

화자가 가장 많이 쓰는 문형을 영상 속 실제 표현과 함께 정리했습니다.

문형영상 속 표현
수동태 be + 과거분사 — 누가 하는지보다 무슨 일이 일어나는지에 초점can be produced · was also mentioned · be monitored
현재완료 have/has + 과거분사 — 과거의 일이 지금도 관련이 있을 때have created · have also listed

주의할 발음

화자는 I'm, you're 같은 축약형과 약화된 형태를 3번 사용합니다. 들리는 대로 짧게 발음하세요.

  • “sh”와 “zh” 소리: dimension /daɪˈmɛn.ʃən/, deviation /ˌdiː.viˈeɪʃən/, initiate /ɪˈnɪʃ.i.eɪt/, dimensional /daɪˈmɛn.ʃə.nəl/
  • 긴 단어 — 강세 위치에 주의: characteristic /ˌkæɹ(ə)ktəˈɹɪstɪk/, automotive /ˌɔtəˈmoʊtɪv/, accordingly /əˈkɔɹ.dɪŋ.li/, controllable /kənˈtɹoʊləbəl/, deviation /ˌdiː.viˈeɪʃən/

한국어 화자가 어려워하는 소리:

  • /f/ — ㅍ(/p/)으로 바꾸지 말고 윗니를 아랫입술에 대기: specify /ˈspɛs.əˌfaɪ/, fulfill /fʊlˈfɪl/
  • /v/ — ㅂ(/b/)과 구별하기: derive /dɪˈɹaɪv/, automotive /ˌɔtəˈmoʊtɪv/, deviation /ˌdiː.viˈeɪʃən/, revise /ɹɪˈvaɪz/, alternatively /ɔlˈtɝ.nə.tɪv.li/
  • /r/과 /l/ 구별하기: accordingly /əˈkɔɹ.dɪŋ.li/, controllable /kənˈtɹoʊləbəl/, tolerance /ˈtɑ.lə.ɹəns/

이 영상으로 연습하는 방법

  1. 먼저 말하지 않고 영상을 끝까지 듣고 모르는 단어를 적어 둡니다.
  2. 보통 속도로 한 문장씩 섀도잉하고, 화자의 리듬과 맞을 때까지 반복합니다.
  3. 자신의 목소리를 녹음해 원본과 비교하고, characteristic, supplier, dimension 같은 단어에 특히 주의합니다.

쉐도잉이란? 영어 실력을 빠르게 키우는 과학적 방법

쉐도잉(Shadowing)은 원래 전문 통역사 훈련을 위해 개발된 언어 학습 기법으로, 다언어 학자인 Dr. Alexander Arguelles에 의해 대중화된 방법입니다. 핵심 원리는 간단하지만 매우 강력합니다: 원어민의 영어를 들으면서 1~2초의 짧은 지연으로 즉시 소리 내어 따라 말하는 것——마치 '그림자(shadow)'처럼 화자를 따라가는 것입니다. 문법 공부나 수동적인 청취와 달리, 쉐도잉은 뇌와 입 근육이 동시에 실시간으로 영어를 처리하고 재현하도록 훈련합니다. 연구에 따르면 이 방법은 발음 정확도, 억양, 리듬, 연음, 청취력, 말하기 유창성을 크게 향상시킵니다. IELTS 스피킹 준비와 자연스러운 영어 소통을 원하는 분들에게 특히 효과적입니다.

섀도잉 방법: 단계별 전체 가이드 읽기 →