1
Hi there this is Renaud Angéron.
2
Welcome to this series on the new product introduction process.
3
We're going to cover some topics that come back over and over especially for electrical and or mechanical products.
4
Hope it's helpful.
5
Let's get started with video number one on the first topic.
6
Hi, this is Renaud Androran and I'm going to cover the pilot run before mass production of a new product.
7
So it's very different from looking at prototypes.
8
Prototypes are used to confirm the design of a new product, but they might not be made with the same components,
9
same methods, same equipment, same people and so on as mass production.
10
the pilot run is very important
11
when you launch production of a new product there are always some risks okay
12
so the idea of a short a small production run a
13
pilot run is to test the line test the manufacturing process
14
and the testing process also okay and to see the problems
15
and to address them until we confirm
16
that the process is capable of delivering the right creative products
17
okay to confirm assembly to come from packing to confirm some
18
of the fabrication also okay it's very standard across many industries PVT in consumer electronics you know phones
19
and things like that production trial run in automotive it's got many names let's call it pilot run
20
so it can also take place at the level of the component supplier okay not just assembly
21
if some critical components are customized
22
and there is a risk of quality issue it's a very
23
good thing to also have them do a pilot run and
24
if you can be on site
25
and monitor the scrap rate then this is really good because
26
if you see
27
that scrap rate is three percent it's very different from a
28
scrap rate of 20% where the component supplier might tell you
29
hey I need to raise the price quite a bit okay
30
the number of pieces most often is somewhere between 20 and 100
31
but this really varies widely it's an iterative process you might
32
not get everything right the first time actually most probably you
33
will not it's like the prototyping process where you make a prototype
34
and then another one another one another one another one until you have a nice prototype
35
that looks alike functions alike and and is okay to pass certifications
36
and so on same idea here okay some sometimes one run is okay
37
if there's no serious outstanding issues okay now here are some
38
best practices same conditions as mass production as I say same method same people same
39
equipment and so on same testing equipment or
40
so same inspectors same methods as you see the problems work on preventive actions okay now
41
and if possible actually before the pilot run already think about it do some operator training and
42
so on okay as much as you can after the run
43
hopefully you have a whiteboard just next to the assembly line or the fabrication equipment with some issues.
44
Where does it come from what to do to avoid it next time who is supposed to do what by
45
when okay very simple very low-tech but very powerful
46
if you really follow up and then well this is more for automotive
47
or some consumer electronics where you have to ramp up very fast or put it under stress hey
48
we're gonna make 50 every 10 minutes okay now let's try
49
again with 80 okay we kept up at 70 now I made some changes let's aim for 100 and
50
so on okay then this really gives you an idea about
51
the capacity of your process otherwise you start mass production
52
but you don't know
53
if you're gonna be able to ship something after 10 days
54
15 days 20 days this might make a very big difference in the end.
55
Now preventive actions, including logistics, assembly, testing, packing, final inspection.
56
You need to plan and prepare for the production process if possible before the pilot run.
57
Operator training is very important.
58
You need to look at the problems and the improvements.
59
And then as I said based on something like this, you need to manage the issues,
60
communicate about it, make sure everybody understand what what what happens and maybe you will find that
61
hey incoming QC should have cut cut it up
62
but they did not
63
and actually 25% of this specific part maybe the casing have
64
problems well what do we do with it let's do we
65
sort it out do we send back to the supplier and and so on okay Benefits, lower risk.
66
Lower risk, that's very, very important.
67
If you go into mass production and then you find out
68
that there's some serious issues
69
that might mean a lot of rework a lot of scrapped material that's very expensive
70
and it also means much later shipment okay so
71
if you want to save time do things step by step eliminate issues before you ramp up
72
and for customers obviously better quality products because
73
if the products are good the first time without any rework
74
well that's that's the best that's the best scenario okay
75
and again this might save you time it might save you time to slow down a little bit
76
and do a pilot run and a key problem
77
that I should mention is
78
that in China a lot of suppliers don't like the idea
79
of pilot run they don't like it at all maybe they don't believe
80
that your volumes will be very high first
81
but also they don't really want to spend a lot of
82
time doing engineering work they just want to release the products on the shop floor
83
and get the manufacturing staff to figure out a way to
84
make it in a lot of Chinese factories that's what we see not very good
85
but that's that's the way they like to manage sometimes they
86
tend to be a bit too optimistic also they don't think
87
that there will be a lot of risks and
88
if they pay the operators by the piece obviously the operators
89
don't want to work on a very small batch hundred pieces okay now
90
if you're the customer it's your money okay make it a very clear imperative from the start
91
and don't give them the choice don't give them the option to say no basically
92
that's it I hope that was helpful don't hesitate to comment ask any questions
93
or subscribe to our YouTube channel thank you

下載應用

流利口語所需的一切

AI 發音評分逐句打分
音標練習掌握每個音
詞彙學習建立你的詞庫
詞彙遊戲邊玩邊學

同頻道

FOR YOU

推薦影片

本課的詞彙與口語要點

這節 C1 級別的口語課以影片“NPI Process 1: Why A Pilot Run Before Mass Production Is Very Useful”為素材。 影片中反覆出現的詞有:pilot, product, production, process, issue。 這段影片共有 93 個句子、1083 個單詞可供跟讀。 講話部分時長為 7:19。 說話人語速平穩,每分鐘約 148 個詞,很適合跟讀。 89% 的單詞屬於英語最常用的 3,000 詞,其餘的詞建議在練習前先學一下。

影片中的重點詞彙

影片中最難的 14 個單詞,附發音和釋義:

單詞發音釋義
prototype 名詞/ˈpɹəʊtətaɪp/原型, 雛形
supplier 名詞/səˈplaɪə/供應商 /供應商, 供應者 /供應者
scrap 名詞/ˈskɹæp/碎片, 斷片 /斷片
automotive 形容詞/ˌɔtəˈmoʊtɪv/汽車 /汽車, 機動車 /機動車
customize 動詞/ˈkʌs.tə.maɪ̯z/定製, 定做
whiteboard 名詞/ˈwaɪtbɔɹd/白板
imperative 形容詞/ɪmˈpɛɹ.ə.tɪv/迫切的, 必須的 /必須的
shipment 名詞/ˈʃɪpmənt/運輸 /運輸
hesitate 動詞/ˈhɛz.ə.teɪt/猶豫 /猶豫, 躊躇 /躊躇
logistics 名詞/ləˈd͡ʒɪstɪks/物流, 運籌 /運籌
optimistic 形容詞/ˌɒptɪˈmɪstɪk/樂觀的 /樂觀的
batch 名詞/bæt͡ʃ/批次, 批
certification 名詞/ˌsɜː.tɪ.fɪˈkeɪ.ʃən/認證 /認證
subscribe 動詞/səbˈskɹaɪb/簽署 /簽署

影片中出現的短語動詞

單詞釋義
figure out 動詞弄清楚
find out 動詞找出, 查明
follow up 動詞跟進 /跟進
slow down 動詞減速 /減速, 放慢

需要注意的發音

說話人用了 17 次縮略和弱讀形式,例如 don't, gonna, we're。請按聽到的簡短形式來說。

  • “sh” 和 “zh” 音: fabrication /fæbɹɪˈkeɪʃən/, shipment /ˈʃɪpmənt/, certification /ˌsɜː.tɪ.fɪˈkeɪ.ʃən/
  • 長單詞——注意重音位置: fabrication /fæbɹɪˈkeɪʃən/, automotive /ˌɔtəˈmoʊtɪv/, iterative /ˈɪt(ə)ɹətɪv/, imperative /ɪmˈpɛɹ.ə.tɪv/, optimistic /ˌɒptɪˈmɪstɪk/

中文母語者容易讀錯的音:

  • /v/ — 不要讀成 /w/,上齒輕觸下唇: preventive /pɹɪˈvɛntɪv/, automotive /ˌɔtəˈmoʊtɪv/, iterative /ˈɪt(ə)ɹətɪv/, imperative /ɪmˈpɛɹ.ə.tɪv/
  • 詞尾子音 — 要讀清楚,後面不要加母音: prototype /ˈpɹəʊtətaɪp/, scrap /ˈskɹæp/, preventive /pɹɪˈvɛntɪv/, rework /ˈɹiːwɜː(ɹ)k/, automotive /ˌɔtəˈmoʊtɪv/
  • /æ/ — 嘴張大,不要讀成 /e/: scrap /ˈskɹæp/, fabrication /fæbɹɪˈkeɪʃən/, batch /bæt͡ʃ/

如何用這段影片練習

  1. 先完整聽一遍影片,不要開口,記下不認識的單詞。
  2. 用正常速度逐句跟讀,每句重複到你的節奏與說話人一致為止。
  3. 錄下自己的聲音並與原聲對比,特別注意 prototype, supplier, scrap 這類單詞。

什麼是跟讀法?

跟讀法 (Shadowing) 是一種有科學依據的語言學習技巧,最初開發用於專業口譯員的培訓,並由多語言者Alexander Arguelles博士普及。這個方法簡單而強大:您在聽英語母語原聲的同時立即大聲重複——就像是一個延遲1-2秒緊跟說話者的影子。與被動聽力或語法練習不同,跟讀法強迫您的大腦和口腔肌肉同時處理並模模擬實的講話模式。研究表明它能顯著提高發音準確性,語調,節奏,連讀,聽力理解和口語流利度——使其成為雅思口語備考和真實英語交流最有效的方法之一。

影子跟讀法: 閱讀完整分步指南 →